527 - Udakandawala
| Index No | Project | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Construction of the side wall of the dam near Mr. Jothipala's house | 1 | 30 | 5,000,000.00 |
| 2 | Development of the road in front of the post office with a side wall | 2 | 15 | 4,000,000.00 |
| 3 | Concreting the necessary areas on Gangoda Road. | 3 | 150 | 5,000,000.00 |
| 4 | Constructing a roof and providing a filter for the well related to the Udakendawala water project. | 4 | 45 | 5,000,000.00 |
| 5 | Development of the Sapugas Dedura Road. | 5 | 35 | 4,000,000.00 |
| 6 | Completion of the remaining works at the Ratmalgoda Temple | 6 | 80 | 8,000,000.00 |
| 7 | Renovation of the Dehe Kumbura Anvil. | 7 | 45 | 7,000,000.00 |
| 8 | Development of the road in front of Koskele and the side wall near Kumuru Road. | 8 | 35 | 5,000,000.00 |
| 9 | Developing the path of the world. | 9 | 13 | 5,000,000.00 |
| 10 | Preparing the path to the middle of the Puwakgaha field. | 10 | 35 | 7,500,000.00 |
| 11 | Development of the road from near Mr. Suratissa's house to Mr. K. Karunaratne's house. | 11 | 6 | 8,000,000.00 |
| 12 | Developing the remaining part of the Eastern Mountain Road. | 12 | 25 | 7,500,000.00 |
| 13 | Development of the Puwakgaha paddy field agriculture | 13 | 35 | 4,500,000.00 |
| 14 | Construction of an anvil in the Moragaha Depela farm. | 14 | 4 | 1,000,000.00 |
| 15 | 6.1 | 15 | 274 | 2,000,000.00 |
| 16 | Development of the Gangoda main road by installing culverts. | 16 | 150 | 5,000,000.00 |
| 17 | Construction of embankments to prevent the two canals from being washed away. | 17 | 35 | 8,000,000.00 |
| 18 | Development of the Ra Gedara Mine Road | 18 | 10 | 7,500,000.00 |
| 19 | Development of the road leading to Bogahahena. | 19 | 10 | 1,000,000.00 |
| 20 | Providing a concrete mix for Mr. J.A. Jayaweera's concrete workshop. | 20 | 1 | 190,000.00 |
| 21 | Giving a Juki machine to Mrs. Samantha. | 21 | 1 | 128,000.00 |
| 22 | Preparing a pipe to draw water from the well near Mr. Ilangakoon's house. | 22 | 10 | 200,000.00 |
| 23 | GG Presenting a Juki machine to Mrs. Kalyani Giradeniya. | 23 | 1 | 128,000.00 |
| 24 | Providing a coconut husk shredding machine to Mr. P.A., Nalaka Sanjeewa. | 24 | 1 | 2,500,000.00 |
| 25 | Providing a pole sawing machine and a conveyor to Mr. Kelum Ratnayake | 25 | 1 | 500,000.00 |
| 26 | Popularizing mushroom cultivation. | 26 | 4 | 200,000.00 |
| 27 | Providing a Juki machine and an Olock machine to Mrs. Nadeesha Dilrukshi. | 27 | 1 | 300,000.00 |
| 28 | Providing a cowshed and a grass pulverizer to Mr. Ruwan Kumara and Mr. Dias. | 28 | 2 | 615,000.00 |
| 29 | Providing 02 greenhouses. | 29 | 2 | 1,200,000.00 |
| 30 | Providing the necessary de-pressure to Mr. Rohana's tea shop. | 30 | 1 | 1,100,000.00 |
| 31 | Providing an oven for bakery production. | 31 | 1 | 400,000.00 |
| 32 | Providing technical knowledge and advice to the rural community. | 32 | 50 | 1,000,000.00 |
| 33 | Construction of a sub-dam from the main dam at Dege Kumbure | 33 | 15 | 1,200,000.00 |
| 34 | Construction of a building for Mr. Osith to hold tuition classes. | 34 | 1 | 1,000,000.00 |
| 35 | Conducting an awareness program on handicrafts. | 35 | 20 | 1,000,000.00 |
| 36 | Providing a sub-water tank to Sapugasdedura village. | 36 | 30 | 1,500,000.00 |
| 37 | Renovation of the cultivation pit in the rice field | 37 | 15 | 2,000,000.00 |
| 38 | Providing a road and electricity to 7 families in the Aguru Kanda area. | 38 | 7 | 8,000,000.00 |
| 39 | Development of the drainage system on both sides of the Melsiripura Dodamgaslanda road. | 39 | 270 | 5,000,000.00 |
| 40 | Construction of a playground on suitable land. | 40 | 200 | 3,000,000.00 |
| 41 | Construction of a road to access the elevated lands near Mr. Vijayananda's house | 41 | 3 | 9,000,000.00 |
| 42 | Construction of a service building for the Udakandawala division | 42 | 273 | 8,000,000.00 |
528 - Adhapola
| Index No | Project | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Udakandawala Ancient Temple Road Culvert Construction and Development | 1 | 350 | 4,000,000.00 |
| 2 | Development of the road from near Akurawa shop to Koswatta (Peragaha Canal main road) by constructing culverts and necessary places | 2 | 1500 | 2,000,000.00 |
| 3 | Developing the school road | 3 | 200 | 2,000,000.00 |
| 4 | Development of the Hubas Kuora agricultural road | 4 | 100 | 1,000,000.00 |
| 5 | Development of the road leading from Mr. Kamal's house to Dehigaha Kuora Wewa | 5 | 600 | 1,500,000.00 |
| 6 | R.D. Construction and development of the box culvert on the road running down from Mrs. Chandralatha's house | 6 | 40 | 1,500,000.00 |
| 7 | Removing the collapsed public well near Delgaha Ela Pre-School and rebuilding it at the same location | 7 | 60 | 500,000.00 |
| 8 | Surveying and developing the Pera Gaha Canal Cemetery Road | 8 | 130 | 2,000,000.00 |
| 9 | Construction of a service pavilion | 9 | 319 | 3,000,000.00 |
| 10 | A water project for the Adapola division | 10 | 100 | 7,000,000.00 |
| 11 | Concreting the necessary areas on the Gurugal Hena Road | 11 | 150 | 3,000,000.00 |
| 12 | Development of Mihindu Mawatha by surveying and constructing embankments on both sides | 12 | 80 | 25,000,000.00 |
| 13 | Construction and development of a side wall near the Gaye Gaye culvert on the Melsiripura main road at the Ranmini Mawatha junction | 13 | 1000 | 1,500,000.00 |
| 14 | Development of necessary places on Ranmini Mawatha | 14 | 80 | 2,000,000.00 |
| 15 | Development of the road leading to the Adapola Dehigaha Kuora Tank (cemetery/houses) | 15 | 100 | 3,000,000.00 |
| 16 | Surveying and developing the temple route near Gonamada Cave | 16 | 300 | 5,000,000.00 |
| 17 | Surveying and developing the Well Fort Road | 17 | 500 | 4,000,000.00 |
| 18 | Development of the entrance road to Nandaramaya | 18 | 319 | 700,000.00 |
| 19 | Extension of the existing side wall of the spillway | 19 | 60 | 5,000,000.00 |
| 20 | Construction of a side wall near Mr. David Singho's hut in Pallama Yaya | 20 | 50 | 1,500,000.00 |
| 21 | Providing a printer/photo copy machine to Mrs. Wasana Priyadarshani Amarathunga | 21 | 1 | 500,000.00 |
| 22 | Concrete the slope system | 22 | 60 | 500,000.00 |
| 23 | PASI presents an Amano sheet bending machine to Mr. Panamulal | 23 | 1 | 2,500,000.00 |
| 24 | Construction of the side wall of Divul Hena Yaya where the Wan Ela and Sorow Ela join | 24 | 60 | 15,000,000.00 |
| 25 | Donation of a coir spinning machine to RD Vinitha Ranmini | 25 | 1 | 200,000.00 |
| 26 | Providing a tree cutting machine to SD Upul Kumara | 26 | 1 | 150,000.00 |
| 27 | Providing a food dehydrator to Mrs. N Anulawathi | 27 | 1 | 500,000.00 |
| 28 | RD Presenting a Flour Threshing Machine to Mrs. Samantha Mangalik | 28 | 1 | 200,000.00 |
| 29 | Providing a block cutting machine to Mr. Sarath Samaraweera | 29 | 1 | 500,000.00 |
| 30 | Providing a cane cutting machine to Mr. U Mayura Tharanga | 30 | 1 | 50,000.00 |
| 31 | Providing a drinking water filter to Mr. N Mahesh Kumar (ARO) | 31 | 1 | 3,000,000.00 |
| 32 | Removal and reconstruction of the bus stop at the Pinkuora Junction | 32 | 1 | 500,000.00 |
| 33 | Construction and development of the embankment on the road leading down from Mr. BD Premadasa's shop | 33 | 50 | 1,000,000.00 |
| 34 | An environmental conservation program (planting kuok trees on both sides of the reserve canal) | 34 | 319 | 200,000.00 |
| 35 | Promotion of the Garment Industry (HM Seetha Kumari, HM Padma Kumari, Amila Kumari, Sunil Jayawira etc.) | 35 | 5 | 1,000,000.00 |
| 36 | Removal and reconstruction of the public well above the Pinkuora rice fields | 36 | 30 | 500,000.00 |
| 37 | Commencing community health clinic programs | 37 | 100 | 1,000,000.00 |
| 38 | Construction of a playground at a suitable location in the domain | 38 | 319 | 5,000,000.00 |
| 39 | Starting a cashew cultivation project | 39 | 6 | 1,200,000.00 |
| 40 | Renovation of Adapola Cemetery | 40 | 319 | 1,500,000.00 |
| 41 | Starting a cinnamon cultivation project | 41 | 8 | 200,000.00 |
| 42 | Starting a pepper project | 42 | 5 | 200,000.00 |
529 - Paragaswewa
| Index No | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Development of the road from near Pinthaliya to Maha Yaya Cemetery | 1 | 200 | 1,000,000.00 |
| 2 | Construction of the side wall of the Pudhana Canal near the Paragassawa Upper Concert Hall | 2 | 250 | 2,000,000.00 |
| 3 | Construction of the side wall of the main canal road in Udanwita Kiwulawela Yaya from near Mr. Nandasena's house | 3 | 75 | 1,000,000.00 |
| 4 | Providing a water filter to Udanwita College | 4 | 300 | 500,000.00 |
| 5 | Initiating a dairy cattle management project | 5 | 5 | 3,000,000.00 |
| 6 | Development of a culvert across the canal on the agricultural road that enters the Nawalla paddy field through the Udanwita auction estate | 6 | 100 | 1,000,000.00 |
| 7 | What is meant is to remove the silt from the lake and make it more fertile. | 7 | 80 | 1,000,000.00 |
| 8 | Development of the main canal route by dredging the Inwatiya tank | 8 | 100 | 1,000,000.00 |
| 9 | Concreting of the Mahayaya Dodangahakotuwa road up to the house of Mr. Nandasena | 9 | 250 | 1,500,000.00 |
| 10 | Development of the road by informing the house of Mr. Nimal Chandrasena on the Invetiya road | 10 | 50 | 1,000,000.00 |
| 11 | Development of Kongolla Udanwita Road | 11 | 150 | 800,000.00 |
| 12 | Extension and development of the road from near Mr. Cyril's house in Paragassawa to the Ghenenna tank | 12 | 50 | 500,000.00 |
| 13 | Extension of the agricultural road from near Paragassawa Community Hall to Mr. Gunasili's house | 13 | 30 | 500,000.00 |
| 14 | Development of the Upper Unapathanga Road up to Paragassawa Cemetery by releasing the sections from Damunugollawatte private land | 14 | 15 | 1,000,000.00 |
| 15 | Development of the road from near the Buddha Masura in Udanwita to Mr. Dayaratne's house | 15 | 35 | 500,000.00 |
| 16 | Filling of the Upper Unapathanga Tank | 16 | 30 | 1,000,000.00 |
| 17 | Construction and development of a side bridge across the Krushi Mara Gaye Canal from Udanwita to Kivula Wela. | 17 | 150 | 1,000,000.00 |
| 18 | Providing an oil pressing machine and a flour milling machine to Mrs. Wg Padmini Welagedara | 18 | 1 | 500,000.00 |
| 19 | Giving a paddy to Mr. Suranga Wailagedara | 19 | 1 | 1,200,000.00 |
| 20 | Providing equipment necessary for chicken management | 20 | 5 | 300,000.00 |
| 21 | Providing a sewing machine to a group | 21 | 10 | 500,000.00 |
| 22 | Providing Mrs. Irosha with a flour and chili mill | 22 | 1 | 500,000.00 |
| 23 | Community Hall Development | 23 | 200 | 300,000.00 |
| 24 | Providing electricity to the community hall | 24 | 200 | 200,000.00 |
| 25 | Installing street lamps in the required places | 25 | 200 | 200,000.00 |
| 26 | Implementing a water project on the road leading to Iwala from near the public well | 25 | 50 | 1,000,000.00 |
| 27 | Construction of a toilet system for Udanwita College | 26 | 250 | 800,000.00 |
| 28 | Installing street lamps in the required places | 27 | 200 | 200,000.00 |
530 - Dodamgahakotuwa
| Index No | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Permanent development of the Dodamkotuwa main road by tarring it | 1 | 400 | 8,000,000.00 |
| 2 | A bus service has been launched to travel from Ridigama to Ambanpola Melsiripura via Koswatta Dodamkotuwa. | 2 | 750 | 20,000,000.00 |
| 3 | Build a service tower | 3 | 270 | 75,000,000.00 |
| 4 | Providing an electrical transformer | 4 | 175 | 20,000,000.00 |
| 5 | Development of the Upper Unapatanga Reservoir | 5 | 35 | 5,000,000.00 |
| 6 | A snake pepper cultivation project has been initiated. | 6 | 5 | 1,000,000.00 |
| 7 | Providing dairy cows and equipment needed to run a dairy project | 7 | 5 | 2,000,000.00 |
| 8 | Providing equipment and technical knowledge for mushroom cultivation | 8 | 10 | 2,000,000.00 |
| 9 | Hathupitiya Dodamgaslanda | 9 | 406 | 6,000,000.00 |
| 10 | Build a canal dam for the Goda Kumbura and Gamage Kumbura paddy fields. | 10 | 17 | 3,000,000.00 |
| 11 | A drain was installed near the Samurdhi Community Center to allow water to drain into the tank. | 11 | 12 | 2,000,000.00 |
| 12 | Widening of the culvert on the main road near the Hathupitiya Petti culvert | 12 | 406 | 3,000,000.00 |
| 13 | Construction of a side wall near the public square near Mr. Sirisena's house | 13 | 16 | 3,000,000.00 |
| 14 | Constructing a dam by building an anvil in the Hathupitiya paddy field | 14 | 25 | 5,000,000.00 |
| 15 | Cutting a drain in front of Mr. Pinyadasa's house to divert water into the tank | 15 | 27 | 15,000,000.00 |
| 16 | Development of the road from Dodamgahakotuwa Pradana Road to Mr. Senadhira's house | 16 | 10 | 35,000,000.00 |
| 17 | Constructing a dam by building an anvil in the Hathupitiya paddy field | 17 | 21 | 5,000,000.00 |
| 18 | Construction of a side wall to the Hathu Pitiya main tank | 18 | 27 | 27,000,000.00 |
| 19 | The Hatupitiya by-pass road was developed by installing culverts. | 19 | 30 | 2,000,000.00 |
531 - Koswaththa
| Index No | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Development of the Koswatta-Madalanda Road | 1 | 100 | 2,000,000.00 |
| 2 | Development of Koswatta Mahayaya Road | 2 | 80 | 3,000,000.00 |
| 3 | Development of the broken canal dam near the Bera Gaha Mula Anum in Deiyanne Gahawela | 3 | 50 | 2,500,000.00 |
| 4 | Development of a concrete bridge across the canal leading to the Hitihami Cave | 4 | 15 | 500,000.00 |
| 5 | Development of access roads to Gedarwela and Hitihami caves | 5 | 15 | 500,000.00 |
| 6 | Development of 5 acres of road | 6 | 100 | 1,500,000.00 |
| 7 | Development of the Meddeketiya Road | 7 | 100 | 4,000,000.00 |
| 8 | Development of Koswatta Peragaha Ela Road | 8 | 70 | 2,000,000.00 |
| 9 | Development of the section from near the Pansala to Mr. Gunathilaka's house | 9 | 50 | 1,500,000.00 |
| 10 | Development of necessary areas on the road from near Nayanajith's house to Koswatta College | 10 | 50 | 2,000,000.00 |
| 11 | Starting a dispensary within the clinic center | 11 | 1000 | 5,000,000.00 |
| 12 | Development of Kuokgahamada Lidapitiya Tank | 12 | 40 | 1,500,000.00 |
| 13 | Creating a market in the cooperative land | 13 | 100 | 500,000.00 |
| 14 | Development of the road from near Jayabandha's house to Pahalamulla village | 14 | 120 | 2,000,000.00 |
| 15 | A seasonal crop cultivation project (cinnamon, chili, hybrid chili cultivation) | 15 | 7 | 700,000.00 |
| 16 | An institution producing coir-based products | 16 | 3 | 7,000,000.00 |
| 17 | Promotion of dairy farming | 17 | 5 | 2,000,000.00 |
| 18 | Construction of the side wall of the Deiyanne Gahawela Fort | 18 | 60 | 2,000,000.00 |
| 19 | Aruppana Amune Basin Preparation | 19 | 15 | 300,000.00 |
| 20 | Development of the road from near Mrs. Jiwani's house to Mr. Amare's house | 20 | 40 | 1,500,000.00 |
| 21 | Developing the road to the other side of the house | 21 | 60 | 2,000,000.00 |
| 22 | Development of the culvert near Mr. Koswatte Gunaratne's house | 22 | 10 | 500,000.00 |
| 23 | Development of the road from near Mr. Gunapala's house to Mr. Ratnayake's house | 23 | 40 | 1,500,000.00 |
| 24 | Preparing the Dalupotha Amune Basin | 24 | 10 | 300,000.00 |
| 25 | Development of the Kuokgahamula Wele Anvil | 25 | 40 | 500,000.00 |
| 26 | Promotion of mushroom cultivation | 26 | 5 | 500,000.00 |
| 27 | Construction of a communication tower | 27 | 1000 | 1,500,000.00 |
| 28 | Development of necessary areas on the road from near Mr. Kirti's house to the school | 28 | 100 | 1,500,000.00 |
| 29 | Construction of a service pavilion | 29 | 1000 | 3,000,000.00 |
| 30 | Preparing the sink for the Ping Kuora Amune | 30 | 20 | 500,000.00 |
| 31 | Preparation of the basin of Tanibakotuwa Amune | 31 | 20 | 500,000.00 |
| 32 | Construction of a security fence for the clinic center | 32 | 40 | 500,000.00 |
| 33 | A drinking water project for the Galatawa areas in the vicinity | 33 | 40 | 8,000,000.00 |
| 34 | A playground for Koswatta College | 34 | 200 | 3,000,000.00 |
| 35 | Promotion of the carpentry industry | 35 | 5 | 1,000,000.00 |
532 - Kanugolla
| Index No | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Land survey and settlement in Kanugolla Division | 1 | 70 | |
| 2 | Development of the Meepitiya-Kanugolla Main Road | 2 | 800 | 4,000,000.00 |
| 3 | Development of necessary places on the North Kanugolla Road | 3 | 250 | 3,000,000.00 |
| 4 | Development of Kithul Hena Road up to Mahinda's house | 4 | 50 | 2,500,000.00 |
| 5 | Development of the road from near Mr. Gaya Kumara's house opposite the Kithulhena Society Hall to Mr. Muthubanda's house | 5 | 60 | 2,000,000.00 |
| 6 | Development of necessary areas on the Kanugolla Wewatenna road | 6 | 60 | 3,000,000.00 |
| 7 | Development of the road from near the house of Hettiarachchi Mahatma to Pinpela | 7 | 50 | 3,000,000.00 |
| 8 | Development of the road from near Mr. Shantha's house to Pinpela | 8 | 40 | 4,000,000.00 |
| 9 | Development of the road from near Mr. Hathurusingha's house towards the preschool | 9 | 70 | 3,000,000.00 |
| 10 | Installing street lamps in the required places | 10 | 600 | 500,000.00 |
| 11 | Promotion of mushroom cultivation | 11 | 3 | 1,000,000.00 |
| 12 | Promotion of products related to thalakola and Japanese yam | 12 | 5 | 800,000.00 |
| 13 | Construction of a communication tower | 13 | 900 | |
| 14 | Providing toilets for beneficiaries without toilets | 14 | 8 | 1,000,000.00 |
| 15 | Promoting detergent products | 15 | 3 | 500,000.00 |
| 16 | Providing a house to Nimal Rajapaksa | 16 | 3 | 1,000,000.00 |
| 17 | Providing sewing machines for rug production | 17 | 3 | 500,000.00 |
| 18 | Promotion of spice farming | 18 | 3 | 300,000.00 |
| 19 | A snake pepper cultivation project has been initiated. | 19 | 10 | 1,000,000.00 |
| 20 | Promotion of dairy farming | 20 | 4 | 1,000,000.00 |
| 21 | Construction of a service pavilion | 21 | 800 | 2,000,000.00 |
| 22 | Development of the culvert on the road leading to Mr. Dharmasiri's house on School Road | 22 | 10 | 500,000.00 |
| 23 | Construction of a drainage system on the road from near Palitha's house to Mr. Pincha's house | 23 | ||
| 24 | Promoting cinnamon cultivation | 24 | 10 | 300,000.00 |
| 25 | Promotion of goat husbandry | 25 | 2 | 300,000.00 |
| 26 | Construction of a security fence around the Kithul Hena Community Hall grounds | 26 | 200 | 200,000.00 |
| 27 | drinking water project for the village of Kanugolla | 27 | ||
| 28 | Preparing the water for the Yaerugolla Lake | 28 | 5 | 500,000.00 |
533 - Wegama
| Index No | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Development of Wegama Handupola roundabout from Gaya to Kaju Kella | 1 | 150 | 1,000,000.00 |
| 2 | Further development of the road from near Wegama Community Hall to Halgayamulla | 2 | 100 | 1,000,000.00 |
| 3 | Development of the remaining section of the Wegama-Pahalagama road | 3 | 150 | 1,000,000.00 |
| 4 | Development of Wegama Podu Kiln | 4 | 50 | 200,000.00 |
| 5 | Development of the cemetery road ahead | 5 | 45 | 500,000.00 |
| 6 | Removing the obstructing electric pole on the road near Sanasa Bank and developing that road further | 6 | 75 | 1,000,000.00 |
| 7 | Development of the road in front of the tank up to the house of Mr. R. M. Jayathilaka | 7 | 30 | 1,000,000.00 |
| 8 | Providing the necessary knowledge and equipment for beekeeping | 8 | 20 | 500,000.00 |
| 9 | Extension of drinking water line from Mudigala to Wegama (belonging to the Water Supply Board) | 9 | 45 | 1,000,000.00 |
| 10 | Development of the necessary places on the road from near the house of Mr. K. A. M. Madduma Bandara on the Ihalagama road | 10 | 75 | 1,000,000.00 |
| 11 | Development of the cross road from the main road to Wegama Kalukanda | 11 | 150 | 1,000,000.00 |
| 12 | Construction of a public well for the Ulumuwa Kuuru farm | 12 | 160 | 800,000.00 |
| 13 | Renovation of the Tigola tank's culvert and sluice. | 13 | 180 | 1,000,000.00 |
| 14 | Removing silt from the Gamawela tank and renovating the culvert and sluice. | 14 | 180 | 1,000,000.00 |
| 15 | Providing dairy cows and cowsheds for dairy farming | 15 | 3 | 1,000,000.00 |
| 16 | Providing chicks necessary for chicken farming. | 16 | 5 | 300,000.00 |
| 17 | Training and storage of necessary equipment for mushroom cultivation | 17 | 10 | 1,000,000.00 |
| 18 | Providing new technical knowledge and equipment for snake chili cultivation | 18 | 10 | 500,000.00 |
| 19 | Providing equipment and seeds for gardening. | 19 | 15 | 500,000.00 |
| 20 | Providing a machine that shreds coconut husks | 20 | 5 | 500,000.00 |
| 21 | Development of the community hall building. | 21 | 250 | 1,000,000.00 |
| 22 | Development of the upper floor of the Handupola Mortuary Aid Society Hall | 22 | 300 | 3,000,000.00 |
| 23 | Construction of a side wall to prevent erosion of the cemetery road | 23 | 30 | 1,000,000.00 |
| 24 | Providing women with sewing machines to sew clothes | 24 | 10 | 1,000,000.00 |
534 - Katiyawa
| Index No | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Development of the City Lulkada Road near the Udahena Temple | 2 | 2000 | 40,000,000.00 |
| 2 | Construction of the Praja Shakthi Rural Garment Center building and maintenance of a garment manufacturing center in the divisions of 542 Nithulpitiya, 541 Kelamulla, 540 Waduressa, 539 Kotuhena, 535 Udahena and 534 Katiyawa | 1 | 100 | 6,000,000.00 |
| 3 | Developing the road near Mr. Jayantha's house to minimize the slope of the road | 3 | 1500 | 1,000,000.00 |
| 4 | Development of the Nildiyawara Road from the main road to Dodamgaha Stream | 4 | 1000 | 5,000,000.00 |
| 5 | Construction of the Lulkada Road Bridge | 5 | 500 | 2,000,000.00 |
| 6 | Commencing a water project for Katiyawa Division | 6 | 150 | 2,500,000.00 |
| 7 | Construction of a dispensary for Katiyawa Division | 7 | 6000 | 10,000,000.00 |
| 8 | Sand house | 8 | 200 | 6,000,000.00 |
| 9 | Development of the Gorakadola road from Dodamgaha Ela to Arama | 9 | 2000 | 5,000,000.00 |
| 10 | Development of Katiyawa Anvil and Canal Weirs. Development of Paragaha Weir, Tamila Anvil and Dam, Kosgaha Dam, Badulu Gaha Canal Mar Gaha, Dodamgaha Canal Weir Anicut, Ginikota Canal Weir etc. | 10 | 75 | 80,000,000.00 |
| 11 | Construction of a public service building for Katiyawa Division | 11 | 1200 | 3,000,000.00 |
| 12 | Development of Ulpath Hena Agricultural Road | 12 | 15 | 1,500,000.00 |
| 13 | Development of the Aogahamula Hena Road from the main road | 13 | 20 | 2,000,000.00 |
| 14 | Development of infrastructure facilities at Katiyawa College | 14 | 300 | 3,000,000.00 |
| 15 | Development of the road from the main road to Mrs. Jayannona's house | 15 | 15 | 2,000,000.00 |
| 16 | Development of the road from Dodamagahala Canal to Mr. Piyatissa's house | 16 | 60 | 2,000,000.00 |
| 17 | Creating a dairy farming village | 17 | 15 | 5,000,000.00 |
| 18 | Development of the Pittumudiya road from Dodamgaha Canal to Mr. Muthubanda's house | 18 | 60 | 2,500,000.00 |
| 19 | Starting a small-scale garment industry | 19 | 25 | 5,000,000.00 |
| 20 | Establishing a coir-based manufacturing industry | 20 | 20 | 2,500,000.00 |
| 21 | Development of the road from near Mr. Warnasuriya's house to Mr. Athugalpura's house | 21 | 50 | 1,500,000.00 |
| 22 | Road development from the main road to Mrs. Amalbiso's house | 22 | 40 | 2,000,000.00 |
| 23 | Development of the road from the main road to the princess's house | 23 | 30 | 1,500,000.00 |
| 24 | Development of Eriyagolla Road from the main road to the gentleman's house | 24 | 40 | 2,000,000.00 |
| 25 | Development of the road from Dodamgaha Ela to Ella Hena | 25 | 40 | 2,000,000.00 |
| 26 | Starting a food dehydration project | 26 | 25 | 3,000,000.00 |
| 27 | Development from the main road to the rice fields on the Ping Kumbura road | 27 | 60 | 3,000,000.00 |
| 28 | Development of the road up to Mr. Ekanayake's house on the main road | 28 | 35 | 3,000,000.00 |
| 29 | Development of Katiyawa Pre-School | 29 | 50 | 1,500,000.00 |
| 30 | Development of Dhamma School and Library | 30 | 200 | 2,000,000.00 |
| 31 | Development of the road in front of the cooperative up to Mr. Tilak's house | 31 | 40 | 3,000,000.00 |
| 32 | Providing farming equipment to farmers | 32 | 100 | 2,000,000.00 |
| 33 | Establishing an export crop collection center | 33 | 5 | 4,000,000.00 |
| 34 | Batik-related production project | 34 | 2 | 500,000.00 |
| 35 | Sewing clothes | 35 | 4 | 500,000.00 |
| 36 | Small Business Development (Trade) | 36 | 10 | 1,000,000.00 |
| 37 | Three Five Alarm Project | 37 | 2 | 500,000.00 |
| 38 | Cultivation of ginger and turmeric | 38 | 20 | 1,500,000.00 |
| 39 | Introducing a loan scheme for small business development | 39 | 10 | 3,000,000.00 |
| 40 | Awareness programs on the Clean Sri Lanka Program | 40 | 200 | 50,000.00 |
| 41 | Raising awareness about family disputes | 41 | 150 | 50,000.00 |
| 42 | Holding religious programs | 42 | 200 | 25,000.00 |
| 43 | Early Childhood Development Programs | 43 | 200 | 25,000.00 |
| 44 | Nutrition programs | 44 | 200 | 50,000.00 |
| 45 | Programs on attitudes | 45 | 200 | 75,000.00 |
| 46 | Planting trees near water sources | 46 | 150 | 50,000.00 |
| 47 | Programs to minimize erosion of cultivated lands | 47 | 200 | 500,000.00 |
| 48 | Giving cinnamon plants | 48 | 25 | 1,000,000.00 |
| 49 | Providing medicinal plants for gardens | 49 | 200 | 500,000.00 |
| 50 | Providing river chickens | 50 | 25 | 500,000.00 |
| 51 | Developing methods to minimize animal damage | 51 | 200 | 1,000,000.00 |
535 - Udahena
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Preparation of the official shade office and toilet system on the ground floor of the Visakha Samiti Hall | 2 | 750 | 1,000,000.00 |
| 2 | Construction of the Praja Shakthi Rural Garment Center building and maintenance of a garment manufacturing center in the divisions of 542 Nithulpitiya, 541 Kelamulla, 540 Waduressa, 539 Kotuhena, 535 Udahena and 534 Katiyawa | 1 | ||
| 3 | Development of necessary areas on the Vana Mulla road | 3 | 260 | 5,000,000.00 |
| 4 | Development of Batapaduru Yaya Makula Mara | 4 | 80 | 4,000,000.00 |
| 5 | Development of the Mahaduruwatta Bay bypass road | 5 | 70 | 2,500,000.00 |
| 6 | Resuming the community water project that was hit by a landslide | 6 | 2,000,000.00 | |
| 7 | Development of necessary places on the Moragahapitiya road | 7 | 70 | 5,000,000.00 |
| 8 | Development of the Pillayawa Bypass | 8 | 20 | 2,500,000.00 |
| 9 | Development of Batapaduruyaya Road | 9 | 80 | 2,000,000.00 |
| 10 | Development of the Pihilla Wela Agricultural Road | 10 | 30 | 1,000,000.00 |
| 11 | Construction and renovation of the remaining part of the Yakawele Dam | 11 | 10 | 1,000,000.00 |
| 12 | Construction of the side wall of the Ruppe family paddy field | 12 | 10 | 2,000,000.00 |
| 13 | Construction of the upper canal embankment | 13 | 12 | 2,500,000.00 |
| 14 | Building a tree stump anvil | 14 | 12 | 2,000,000.00 |
| 15 | Construction of anvils for the Sapugaha Demada paddy field | 15 | 15 | 2,500,000.00 |
| 16 | Construction of the Sayabalagahamula Dam | 16 | 10 | 1,000,000.00 |
| 17 | Development of necessary places on Vaulgala Road | 17 | 60 | 3,000,000.00 |
| 18 | Commencement of a cable transport system for the transport of export crops (in the vicinity of Vanamulla and Vaulgala mountains) | 18 | 25 | 1,000,000.00 |
| 19 | Providing necessary equipment for preschool and Dhamma school | 19 | 70 | 500,000.00 |
| 20 | Launching a minor export crop promotion program | 20 | 20 | 500,000.00 |
| 21 | Equipment and supplies needed to start a small garment factory | 21 | 15 | 1,000,000.00 |
| 22 | Starting a food dehydration project | 22 | 5 | 500,000.00 |
| 23 | Initiating a project for coir-based products | 23 | 5 | 500,000.00 |
| 24 | Starting a group animal husbandry farm | 24 | 10 | 3,000,000.00 |
536 - Minirangama
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Development of the Minirangama Main Road | 1 | 1200 | 7,500,000.00 |
| 2 | Construction of a bridge across the small stream near the Alawathumulla water supply | 2 | 600 | 15,000,000.00 |
| 3 | Development of Welikanda Road | 3 | 200 | 5,000,000.00 |
| 4 | Renovation of the footbridge and sidewall | 4 | 1250 | 2,000,000.00 |
| 5 | Establishing a drinking water bottling factory | 5 | 700 | 5,000,000.00 |
| 6 | Improvement of the road from near Mr. Vajirawatta Sarath's house to the Grama Niladhari office | 6 | 600 | 5,000,000.00 |
| 7 | Development of the culvert near Mr. Ranil's house | 7 | 1200 | 1,500,000.00 |
| 8 | Development of the Welikanda Kosweta Road | 8 | 200 | 3,000,000.00 |
| 9 | Development of the road near Gamage's shop | 9 | 250 | 3,000,000.00 |
| 10 | Construction of a side wall near the mine guardhouse | 10 | 1200 | 1,000,000.00 |
| 11 | Development of the Pre-School Road | 11 | 700 | 2,500,000.00 |
| 12 | Promoting confectionery production | 12 | 20 | 2,000,000.00 |
| 13 | Promoting coconut cultivation | 13 | 10 | 2,000,000.00 |
| 14 | Promoting mushroom cultivation | 14 | 10 | 1,000,000.00 |
| 15 | Coir-based agriculture | 15 | 14 | 4,000,000.00 |
| 16 | Construction of a service pavilion | 16 | 1200 | 5,000,000.00 |
| 17 | Manufacture of decorative items and ready-made garments | 17 | 7 | 800,000.00 |
537 - Ihala Udaththapola
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Exploring the caravan route | 2 | 95 | 8,000,000.00 |
| 2 | Construction of the Praja Shakthi Rural Garment Center building and maintenance of a garment manufacturing center jointly by the two divisions of 537 Ihala Udattapola and 538 Pahala Udattapola | 1 | 100 | 2,000,000.00 |
| 3 | Development of Keselwatte Road | 3 | 45 | 5,000,000.00 |
| 4 | Velanruppa Road Development | 4 | 125 | 1,000,000.00 |
| 5 | Wewatenna 2nd Lane Development | 5 | 85 | 5,000,000.00 |
| 6 | Road development begins | 6 | ||
| 7 | Development of necessary places on Wewatenna 2nd Lane | 7 | 90 | 2,000,000.00 |
| 8 | Construction of the six side walls of the Gamawela paddy field sub-dam | 8 | 35 | 4,000,000.00 |
| 9 | drinking water project | 9 | 48 | 1,000,000.00 |
| 10 | Development of the 2nd Crossing of the 1st Lane, Wewathekka up to the paddy field | 10 | 25 | 2,000,000.00 |
| 11 | Velanruppa Road Sidewall Development | 11 | 25 | 2,000,000.00 |
| 12 | Kababgolla Road Development | 12 | 30 | 3,000,000.00 |
| 13 | Children's Park Development | 13 | 25 | 1,000,000.00 |
| 14 | Construction of the side wall of the Hennakawa paddy field | 14 | 35 | 3,000,000.00 |
| 15 | Development from near the Umaratungaramaya temple to the house of Mr. P.D. Karunaratne | 15 | 55 | 4,000,000.00 |
| 16 | Construction of a temporary dam from the Yamuna River to the Rambukpotha rice fields | 16 | 28 | 3,000,000.00 |
| 17 | Development of Talagolla Road from near Mr. Nrishantha's house | 17 | 12 | 2,000,000.00 |
| 18 | Dehydrating and selling food | 18 | 5 | 500,000.00 |
| 19 | Snake chilli cultivation and sale | 19 | 10 | 300,000.00 |
| 20 | Betel cultivation | 20 | 2 | 200,000.00 |
| 21 | Production and sale of spices | 21 | 2 | 200,000.00 |
| 22 | Chicken control | 22 | 5 | 200,000.00 |
| 23 | Tea leaf packaging and sale | 23 | 5 | 300,000.00 |
| 24 | Tea leaf packaging and sale | 24 | 5 | 300,000.00 |
| 25 | Sewing and selling clothes | 25 | 5 | 300,000.00 |
| 26 | Seeds needed for gardening | 26 | 15 | 300,000.00 |
| 27 | Food dehydration and sale | 27 | 10 | 500,000.00 |
| 28 | Obtaining parachute seeds needed for paddy cultivation | 28 | 25 | 500,000.00 |
| 29 | Get the necessary training for gardening | 29 | 75 | 200,000.00 |
| 30 | Entrepreneurship training programs | 30 | 45 | 100,000.00 |
| 31 | Training programs on dietary patterns | 31 | 125 | 10,000.00 |
| 32 | Youth Social Encouragement | 32 | 60 | 200,000.00 |
| 33 | Drug prevention programs | 33 | 76 | 100,000.00 |
| 34 | Programs for a society that values equality | 34 | 160 | 100,000.00 |
| 35 | Tree planting programs along canals and protection of water bodies | 35 | 35 | 200,000.00 |
| 36 | Expansion of intercropping | 36 | 41 | 100,000.00 |
| 37 | A water treatment plant for clean water for all | 37 | 110 | 10,000,000.00 |
538 - Pahala Udaththapola
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 01 | The Cocowatta Bridge will be newly constructed and the road will be developed. | 6 | 200 | 200,000,000.00 |
| 02 | Construction of the Praja Shakthi Rural Garment Center building and maintenance of a garment manufacturing center jointly by the two divisions of 537 Ihala Udattapola and 538 Pahala Udattapola | 1 | 100 | 2,000,000.00 |
| 03 | Development of the Hapudandawa road. | 3 | 225 | 100,000,000.00 |
| 04 | Development of Pahalagama-Gamamada road. | 4 | 150 | 100,000,000.00 |
| 05 | Development of the Hapudandawa road via Pahalagama Kehelgolla. | 5 | 50 | 150,000,000.00 |
| 06 | Development of the road from near Dunumawa Kammala. | 2 | 100 | 70,000,000.00 |
| 07 | Converting the two old wells into two cultivation wells. | 7 | 100 | 100,000,000.00 |
| 08 | Construction of a blue-shaded office. | 8 | 10 | 25,000,000.00 |
| 09 | Development of embankments and side walls from the Giradeniya paddy field to the Dawala Fort paddy field. | 9 | 70 | 40,000,000.00 |
| 10 | Renovation of the Hapudandawa public well. | 10 | 70 | 3,000,000.00 |
| 11 | Referring victims of drug addiction to appropriate programs after rehabilitation. | 11 | 20 | 10,000.00 |
| 12 | Conducting a mushroom training program. | 12 | 20 | 25,000.00 |
| 13 | Providing sewing equipment for rugs, nets, and ready-made garments and introducing the market | 13 | 20 | 1,000,000.00 |
| 52 | Equipment and markets needed for cake making and selling. | 14 | 10 | 100,000.00 |
| 53 | Food dehydration, sales and marketing needs | 15 | 10 | 1,000,000.00 |
| 54 | Providing parachute discs needed for rice cultivation | 16 | 50 | 100,000.00 |
| 55 | Conducting training programs based on current needs. (Handbags / School Bags / Saree Jackets) | 17 | 20 | 100,000.00 |
| 56 | Acquisition of spice packaging and grinding machines. | 18 | 10 | 1,000,000.00 |
| 57 | Development of 05 home gardens. (Providing seeds and equipment.) | 19 | 5 | 100,000.00 |
| 58 | Distribution of chickens and powder to 10 families. | 20 | 10 | 250,000.00 |
| 59 | Obtaining equipment for the production and sale of sweets. | 21 | 10 | 100,000.00 |
| 60 | Arrangements to provide dairy cows. | 22 | 10 | 1,000,000.00 |
| 61 | Conducting training programs in shoe manufacturing. | 23 | 25 | 100,000.00 |
| 62 | Introducing formal vocational training opportunities for students appearing for the G.C.E. O. Level examination. | 24 | 20 | 10,000.00 |
| 63 | Conducting a clinic on the diagnosis and prevention of non-communicable diseases. | 25 | 200 | 50,000.00 |
| 64 | Establishing a factory for coconut-based products. | 26 | 50 | 200,000.00 |
| 65 | Expanding intercropping. | 27 | 50 | 100,000.00 |
539 - Kotuhena
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Development of the bridge on Kotuhena School Road | 2 | 300 | 120,000,000.00 |
| 2 | Construction of the Praja Shakthi Rural Garment Center building and maintenance of a garment manufacturing center in the divisions of 542 Nithulpitiya, 541 Kelamulla, 540 Waduressa, 539 Kotuhena, 535 Udahena and 534 Katiyawa | 1 | ||
| 3 | Development of the road leading from near Mr. Kongolla Nalaka's house towards Kotuhena village. | 3 | 100 | 6,000,000.00 |
| 4 | Development of small industries in Kotuhena division. | 4 | 30 | 700,000.00 |
| 5 | Obtaining public transport services to go through Kotuhena village on the Kotuhena-Vaduressa main road. | 5 | 300 | |
| 6 | Renovation of the pagoda at Kotuhena Temple | 6 | 300 | 2,000,000.00 |
| 7 | Obtaining advice and equipment to minimize damage to Kotuhena wildlife. | 7 | 40 | 100,000.00 |
| 8 | Development of the Galpottha Canal section of the Kotuhena main road | 8 | 300 | 2,000,000.00 |
| 9 | Development of the dam that will take water to the Kotuhena Ambalampitiya and Pankolapitiya paddy fields. | 9 | 80 | 5,000,000.00 |
| 10 | Development of the road towards Kotuhena School Road, Godamada Village | 10 | 20 | 4,000,000.00 |
| 11 | Obtaining electricity for the Kotuhena Community Hall building. | 11 | 15 | 200,000.00 |
| 12 | Development of the road from the Kotuhena Godamada side of the school road leading to Weera Walagamba Maha Vidyalaya towards the lower bridge. | 12 | 30 | 3,000,000.00 |
| 13 | Development of necessary areas on the Kotuhena-Welanruppa road. | 13 | 20 | 2,000,000.00 |
| 14 | Development of Kotuhena Steelwella Dam. | 14 | 80 | 2,000,000.00 |
| 15 | Development of Kotuhena Pre-School Road. | 15 | 100 | 1,000,000.00 |
| 16 | Further development of the Kotuhena-Kekuluhal road. | 16 | 200 | 5,000,000.00 |
| 17 | Development of the road leading to the Kotuhena Public Cemetery. | 17 | 300 | 4,000,000.00 |
| 18 | Development of the road for the village of Pankola Mitiya, Kotuhena. | 18 | 15 | 5,000,000.00 |
| 19 | Development of the Kotuhena-Henamulla road towards the Kekuluhal road. | 19 | 100 | 4,000,000.00 |
| 20 | Development of the road leading down to the paddy fields near Mr. Kotuhena Abeyratne's shop. | 20 | 50 | 4,000,000.00 |
| 21 | Development of the road leading towards Kekuluhal via Kotuhena Ratagahalanda. | 21 | 30 | 3,000,000.00 |
| 22 | Development of the road leading to the Egoda section of Kotuhena. | 22 | 10 | 4,000,000.00 |
540 - Wanduressa
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Development of the Paluwatta Road | 2 | 35 | 5,000,000.00 |
| 2 | Construction of the Praja Shakthi Rural Garment Center building and maintenance of a garment manufacturing center in the divisions of 542 Nithulpitiya, 541 Kelamulla, 540 Waduressa, 539 Kotuhena, 535 Udahena and 534 Katiyawa | 1 | 100 | 6,000,000.00 |
| 3 | Development of the Waduressa Mountain Road. | 3 | 30 | 5,000,000.00 |
| 4 | Construction of the side embankment on the Valiminikanda main road. (Above Mr. Sirisena's house) | 4 | 110 | 4,000,000.00 |
| 5 | Development of the road to Dalukgala Monastery. | 5 | 210 | 4,000,000.00 |
| 6 | Construction of a side embankment and culvert at the dilapidated location on the road leading towards the mountain from near the Waduressa saloon. | 6 | 23 | 3,000,000.00 |
| 7 | Developing the damaged parts of the Nawgala Water Project that was hit by the flood. | 7 | 89 | 2,000,000.00 |
| 8 | Development of the Valiminikanda Kalagasyaya road. | 8 | 30 | 2,000,000.00 |
| 9 | Implementing a water project for the village of Valiminikanda. | 9 | 110 | 6,000,000.00 |
| 10 | Implementing a self-employment program. | 10 | 17 | 2,000,000.00 |
| 11 | Promoting the Valiminikanda area for the tourism industry. | 11 | 77 | 8,000,000.00 |
| 12 | Construction of a multipurpose building | 12 | 343 | 5,000,000.00 |
| 13 | Construction of the Dhamma School building at the Dalukgala Temple. | 13 | 165 | 5,000,000.00 |
| 14 | Development of the Egodawele Amunei Dam. | 14 | 44 | 3,000,000.00 |
| 15 | Development of the Puwakgahamula Dam. | 15 | 41 | 3,000,000.00 |
| 16 | Development of the Balayawela Dam. | 16 | 44 | 3,000,000.00 |
541 - Kelemulla
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Construction of the Praja Shakthi Rural Garment Center building and maintenance of a garment manufacturing center in the divisions of 542 Nithulpitiya, 541 Kelamulla, 540 Waduressa, 539 Kotuhena, 535 Udahena and 534 Katiyawa | 1 | 100 | 6,000,000.00 |
| 2 | Development of the playground at Weera Walagamba Maha Vidyalaya. | 2 | 350 | 2,500,000.00 |
| 3 | Renovation of the Public Officer's Office in Kelamulla Division. | 3 | 750 | 2,000,000.00 |
| 4 | Commencing a community water project for the Kelamulla division. | 4 | 150 | 8,000,000.00 |
| 5 | Preparation of the playground at Weera Walagamba Primary School. | 5 | 250 | 2,000,000.00 |
| 6 | Repairing the deficiencies in the classrooms of Weera Walagamba Maha Vidyalaya. | 6 | 350 | 2,000,000.00 |
| 7 | Development of the Attabagahawatte road. | 7 | 200 | 7,500,000.00 |
| 8 | Reconstruction of the side road from the Kelamulla main road to the Wewa School Road across the mountain. | 8 | 150 | 2,000,000.00 |
| 9 | Construction of a side embankment on the Dehigahakotuwa road and development of the road. | 9 | 200 | 2,000,000.00 |
| 10 | Development of the remaining part of the Nawgala road with a side embankment. | 10 | 30 | 2,000,000.00 |
| 11 | Development of the road from near the Galapita Gedara, which has been eroded on the Oyayangama road. | 11 | 450 | 500,000.00 |
| 12 | Construction and development of the road embankment from near Mr. Nihal's house to Mr. Sunil Premaratne's house. | 12 | 40 | 2,000,000.00 |
| 13 | Development of the Kelamulla-Kongolla road. | 13 | 60 | 2,000,000.00 |
| 14 | Development of the road from near Mrs. Kusumawathi's house. | 14 | 75 | 1,000,000.00 |
| 15 | Obtaining a machine for cutting coconut husks. | 15 | 1 | 200,000.00 |
| 16 | Development of the road from near Mr. Jayawardena's house to the community hall. | 16 | 30 | 1,000,000.00 |
| 17 | Developing the rug weaving and sewing industry. | 17 | 15 | 1,000,000.00 |
| 18 | Providing a dairy cow to Mr. WD Nandasena for dairy farming. | 18 | 1 | 200,000.00 |
| 19 | Obtaining a machine required for cement-related products. | 19 | 1 | 300,000.00 |
| 20 | Getting a mobile food truck. | 20 | 1 | 500,000.00 |
| 21 | Obtaining coconut plants. | 21 | 2 | 25,000.00 |
542 - Nithulpitiya
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Construction of the Praja Shakthi Rural Garment Center building and maintenance of a garment manufacturing center in the divisions of 542 Nithulpitiya, 541 Kelamulla, 540 Waduressa, 539 Kotuhena, 535 Udahena and 534 Katiyawa | 1 | 100 | 6,000,000.00 |
| 2 | Development of necessary areas on the Narangasthenna School Road, Nithulpitiya | 2 | 15 | 1,500,000.00 |
| 3 | Development of necessary areas along the bridge on the Narangasthenna main road | 3 | 30 | 2,500,000.00 |
| 4 | Development of a bridge with embankments near the Hill District College connecting the Nithulpitiya Hill Districts. | 4 | 150 | 2,000,000.00 |
| 5 | Development of the Nithulpitiya playground along with the building. | 5 | 200 | 2,000,000.00 |
| 6 | Construction of a service building for government officials. | 6 | 150 | 2,000,000.00 |
| 7 | Development of necessary places on the Randunna road. | 7 | 15 | 1,500,000.00 |
| 8 | Development of the drainage system and necessary areas on the Nithulpitiya Mountain Road. | 8 | 200 | 2,500,000.00 |
| 9 | Development of the road behind the Nithulpitiya temple. | 9 | 12 | 500,000.00 |
| 10 | Construction of the Nithulpitiya Sri Gotama Mortuary Aid Society Hall. | 10 | 200 | 1,500,000.00 |
| 11 | Development of the road with culverts and embankments on the Nithulpitiya Oyayangama road | 11 | 100 | 2,000,000.00 |
| 12 | Renovation of the Sanghavasa building at the Sri Bodhirukkarama Temple in Nithulpitiya. | 12 | 260 | 1,500,000.00 |
| 13 | Development of the Udamulla road with drainage system. | 13 | 25 | 1,000,000.00 |
| 14 | Establishing entrepreneurial groups in Nithulpitiya division and providing necessary equipment. | 14 | 25 | 5,000,000.00 |
| 15 | Construction of a safety fence at Sri Gotama Pre-School and provision of necessary equipment. | 15 | 20 | 1,000,000.00 |
| 16 | Development of the road from near Mr. Marasinghe's house to Mr. YM Kamal's house. | 16 | 6 | 500,000.00 |
| 17 | Construction of a side wall on the escarpment above Mr. Gamini's house. | 17 | 6 | 500,000.00 |
| 18 | Reconstructing the dilapidated textile building and providing employment opportunities for women. | 18 | 200 | 5,000,000.00 |
| 19 | Construction of embankments and culverts in Nithulpitiya division. | 19 | 25 | 2,500,000.00 |
| 20 | Minimizing damage to wildlife in Nithulpitiya Division and obtaining equipment. | 20 | 60 | 500,000.00 |
| 21 | Development of the Battatugala road. | 21 | 6 | 500,000.00 |
| 22 | Implementation of the Nithulpitiya Kalugahawela Water Project. | 22 | 20 | 500,000.00 |
| 23 | Construction of a fence around the cemetery, development and beautification. | 23 | 260 | 1,000,000.00 |
543 - Kandupalatha
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Development of the necessary parts of the main road in the hill provinces. | 1 | 700 | 2,000,000.00 |
| 2 | Developing the Kadupalatha School Road and renovating the bridge. | 2 | 700 | 5,000,000.00 |
| 3 | Obtaining air rifles for wildlife damage. | 3 | 20 | 800,000.00 |
| 4 | Development of the Ginisiriyawatta road. | 4 | 200 | 4,000,000.00 |
| 5 | Development of necessary places on the Karadagolla road. | 5 | 40 | 6,000,000.00 |
| 6 | Development of the road from near Mr. Navaratne's house on the upper part of the cemetery road to Mr. BD Thilakaratne's house. | 6 | 100 | 500,000.00 |
| 7 | Development of the Marahena road. | 7 | 20 | 2,000,000.00 |
| 8 | Development of the Pinchawela road. | 8 | 30 | 2,000,000.00 |
| 9 | Providing plants for cultivation. (Coconut / Cinnamon / Mango) | 9 | 10 | 4,000,000.00 |
| 10 | Establishing a vocational training center. | 10 | 30 | 2,000,000.00 |
| 11 | Obtaining plants/fertilizers/seeds required for fruit cultivation. | 11 | 12 | 2,000,000.00 |
| 12 | Construction of the Geda Kotuwa anvil and dam. | 12 | 200 | 3,000,000.00 |
| 13 | Development of the Lower Bulugolla Agricultural Road. | 13 | 100 | 1,000,000.00 |
| 14 | Construction of the Puwakpitiya Dam. | 14 | 150 | 1,000,000.00 |
| 15 | Preparing an official shelter for the community hall building. | 15 | 615 | 2,000,000.00 |
| 16 | Development of the Upper Bulugolla Agricultural Road. | 16 | 100 | 1,000,000.00 |
| 17 | Obtaining 05 sewing machines for garment production. | 17 | 5 | 500,000.00 |
| 18 | Obtaining equipment needed to improve Kithul products. | 18 | 5 | 500,000.00 |
544 - Diniminiyatheanna
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Construction of the dam in the Alakolawala paddy field. | 1 | 150 | 4,000,000.00 |
| 2 | Construction of a building for the Rididiya Community-Based Organization. | 2 | 260 | 5,000,000.00 |
| 3 | Construction of the bridge on the Divulgaha Cemetery Road and development of the road. | 3 | 720 | 20,000,000.00 |
| 4 | Construction of a stone bridge on the Kongolla road. | 4 | 360 | 20,000,000.00 |
| 5 | Development of the Kongolla road. | 5 | 360 | 10,800,000.00 |
| 6 | Construction of a toilet system for the Diniminiyatenna Samagi Mortuary Aid Society. | 6 | 250 | 2,500,000.00 |
| 7 | Development of Kosgasthenna Samitishala Mawatha. | 7 | 240 | 2,200,000.00 |
| 8 | Development of the road from near Mr. Akurambada's house to Mr. BD Lalith Jayalath's house. | 8 | 125 | 6,000,000.00 |
| 9 | Development of fifteen houses on the upper road and lower road. | 9 | 65 | 4,500,000.00 |
| 10 | Development of the road (Swarnamali Wattha) running from near the Siyambala tree on Carpet Road to the house of KDA Nandadeva. | 10 | 260 | 7,500,000.00 |
| 11 | Development of the road from near Mrs. WA Tharuka Dilhani's house towards Mr. JM Dharmathilaka's house. | 11 | 70 | 3,500,000.00 |
| 12 | Development of the Kongolla Funeral Aid Society Hall. | 12 | 230 | 300,000.00 |
| 13 | Development of the road (Bimmal Mawatha) leading from Carpet Road towards the house of RD Sunil Premathilaka. | 13 | 30 | 1,500,000.00 |
| 14 | Development of the road running from near Mr. KD Mahinda's house towards Mrs. GG Premasili Ramyalatha's house. | 14 | 22 | 10,000,000.00 |
| 15 | Concreting the road from near the house of Mr. WA Upali Ranasinghe to near the house of Mrs. UHD Malani Rupawathi. | 15 | 28 | 300,000.00 |
| 16 | Development of the Batadola Road | 16 | 15 | 9,000,000.00 |
| 17 | Establishing a children's park for the Diniminiyathenna division. | 17 | 244 | 2,000,000.00 |
| 18 | Construction of Batadola Electricity Extension | 18 | 12 | 2,300,000.00 |
| 19 | Renovation of the line rooms at Swarnamalivatte. | 19 | 30 | 1,500,000.00 |
| 20 | Development of Kotelawala Bungalow Road. | 20 | 19 | 2,000,000.00 |
| 21 | Providing necessary equipment for the sewing industry. | 21 | 6 | 2,000,000.00 |
| 22 | Construction of toilets for those who do not have toilets in Diniminiyathenna division. | 22 | 9 | 2,000,000.00 |
| 23 | Providing air rifles to prevent injuries. | 23 | 20 | 2,000,000.00 |
| 24 | Mushroom cultivation project | 24 | 1 | 431,000.00 |
| 25 | Construction of lime kilns to standard. | 25 | 5 | 6,000,000.00 |
| 26 | Improving telephone signals. | 26 | 2500 | |
| 27 | Development of low-income housing and construction of new houses to replace temporary housing. | 27 | 50 | 10,000,000.00 |
| 28 | Starting a factory near the Kahatagaha mine. | 28 | 1000 | |
| 29 | Improving the tourism industry around the Kahatagaha mine. | 29 | 1000 | |
| 30 | Facilitating and improving existing livelihood projects. | 30 | 50 | 7,000,000.00 |
| 31 | Providing equipment to Samadhi Pre-School. | 31 | 15 | 1,000,000.00 |
| 32 | Construction of embankments for houses at risk due to the Ditta disaster on the Matale road. | 32 | 12 | 30,000,000.00 |
| 33 | Construction of the water tank of the Randiya II project. | 33 | 75 | 3,000,000.00 |
| 34 | Issuance of deeds for 15 houses and LRC lands. | 34 | 15 | |
| 35 | Completing the deficiencies of the Randiya I project (new well, sidewall and solar power system). | 35 | 78 | 10,000,000.00 |
545 - Thelambugalla
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Construction of a dam and embankment from Kiriwewa to Boraluwa. | 1 | 235 | 7,500,000.00 |
| 2 | Development of the Thiruwana Ulpatha Lake and establishment of a fish farming project. | 2 | 1280 | 10,000,000.00 |
| 3 | Construction of the Thelambugalle school playground and wall. | 3 | 345 | 5,000,000.00 |
| 4 | Construction of a new building for Thelambugalle School. | 4 | 345 | 5,000,000.00 |
| 5 | Development of the Wagolla Road Culvert. | 5 | 220 | 5,000,000.00 |
| 6 | Development of the road leading to Kelapalli. | 6 | 30 | 5,000,000.00 |
| 7 | Development of the road leading to Mr. Ratnasiri's house | 7 | 28 | 2,000,000.00 |
| 8 | Development of the Meda Pillayawa Road. | 8 | 35 | 1,000,000.00 |
| 9 | Construction of a service pavilion. | 9 | 950 | 5,000,000.00 |
| 10 | Construction of a water pumping station for the Boraluwa paddy field. | 10 | 175 | 500,000.00 |
| 11 | Development of the Dangolla road. | 11 | 220 | 500,000.00 |
| 12 | Construction of a day and night volleyball court. | 12 | 450 | 3,000,000.00 |
| 13 | Getting electricity to Kelapalli. | 13 | 30 | 100,000.00 |
| 14 | Development of the Thelambugalle-Koswatte road. | 14 | 32 | 1,000,000.00 |
| 15 | Obtaining an electricity extension to Koswatta, Thelambugalle. | 15 | 7 | 1,000,000.00 |
| 16 | Implementation of a drinking water scheme for Koswatta, Thelambugalle. | 16 | 32 | 1,000,000.00 |
| 17 | Implementation of drug prevention programs. | 17 | 450 | 100,000.00 |
| 18 | Implementation of animal husbandry projects. (Goats / Poultry / Dairy Cows) | 18 | 25 | 2,000,000.00 |
| 19 | Development of side roads leading from the main road. | 19 | 125 | 4,000,000.00 |
| 20 | Development of the road to the forest church. | 20 | 450 | 1,500,000.00 |
| 21 | Implementation of a water extension for Thelambugalle Division. | 21 | 125 | 5,000,000.00 |
546 - Balawathwala
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Construction of a building and purchase of equipment to establish a non-dairy by-products sales center | 1 | 3,000,000.00 | |
| 2 | Construction of the Dhamma school building. | 2 | 598 | 5,000,000.00 |
| 3 | Development of the King's Anvil Road. | 3 | 500 | 2,000,000.00 |
| 4 | Construction of the service building. | 4 | 598 | 3,000,000.00 |
| 5 | Construction of the Little Hyni Dam. | 5 | 75 | 800,000.00 |
| 6 | Construction of the Dambagaha Patthu West Dam. | 6 | 80 | 1,000,000.00 |
| 7 | Obtaining a projector for the powerful school. | 7 | 508 | 300,000.00 |
| 8 | Preparing the stage at the powerful school. | 8 | 508 | 500,000.00 |
| 9 | Development of the powerful Ihalagama road. | 9 | 60 | 2,000,000.00 |
| 10 | Promoting flower and fruit cultivation by Mr. Dhananjaya Wijekoon. | 10 | 1 | 200,000.00 |
| 11 | Construction of a security fence around the school grounds. | 11 | 508 | 500,000.00 |
| 12 | Construction of a welfare building for Galserugolla. | 12 | 100 | 500,000.00 |
| 13 | Regulating the flow of water near the bridge on the small stream. | 13 | 598 | 1,000,000.00 |
| 14 | Promoting the carpentry industry. | 14 | 6 | 1,500,000.00 |
| 15 | Development of the Ihalagama Bypass Road. | 15 | 20 | 2,000,000.00 |
| 16 | Renovation of all culverts on the Kahatagahamula to Piyathala road. | 16 | 650 | 5,000,000.00 |
| 17 | The college's water pipe system is being repaired. | 17 | 508 | 800,000.00 |
| 18 | Development of the road up to Mr. BA's house at the foot of the temple. | 18 | 4 | 1,000,000.00 |
| 19 | Development of Kanugolla Road. | 19 | 15 | 2,000,000.00 |
| 20 | Water extension towards Ihalagama and Kanugolla | 20 | 20 | 2,000,000.00 |
| 21 | Promoting dairy farming. | 21 | 20 | 2,000,000.00 |
| 22 | Promoting beekeeping. | 22 | 6 | 500,000.00 |
| 23 | Establishing a mushroom cultivation project. | 23 | 5 | 500,000.00 |
| 24 | Installing a security camera system for environmental conservation. | 24 | 650 | 200,000.00 |
| 25 | Promoting anthurium cultivation. | 25 | 6 | 600,000.00 |
| 26 | Obtaining a water extension to Madiyagama. | 26 | 20 | 1,000,000.00 |
| 27 | Implementation of the wasteland development program. | 27 | 50 | 1,000,000.00 |
| 28 | Development of the road up to Mr. Keerthirathna's house in Kahatagahamula. | 28 | 4 | 1,000,000.00 |
| 29 | Renovation of the public well at the foot of the powerful school. | 29 | 30 | 200,000.00 |
| 30 | Removing the dam from the Pothuwewa and starting freshwater fish farming. | 30 | 350 | 10,000,000.00 |
| 31 | Development of the Cocowatta Road. | 31 | 80 | 2,000,000.00 |
| 32 | Development of Mutthettuwa Cemetery and Road. | 32 | 75 | 1,000,000.00 |
| 33 | Expanding the school grounds. | 33 | 508 | 500,000.00 |
| 34 | Renovation of the King's Anvil. | 34 | 500 | 1,000,000.00 |
| 35 | Surveying and developing the Bakmeekotuwa tank. | 35 | 100 | 1,000,000.00 |
| 36 | Construction of a library and computer center within the service building. | 36 | 598 | 500,000.00 |
| 37 | Renovation of the Ratmalgolla culvert. | 37 | 35 | 2,500,000.00 |
| 38 | Surveying and developing the Tigola Lake and the canals. | 38 | 75 | 3,000,000.00 |
| 39 | Development of all roads in Kattakaduwa Estate. | 39 | 40 | 3,000,000.00 |
| 40 | Development of the road from near the Kattakaduwa Society Hall to Welikanda. | 40 | 75 | 2,000,000.00 |
| 41 | Concreting the road from Ruwan Stores to the power plant. | 41 | 30 | 1,000,000.00 |
| 42 | Development of Sirisewana Estate roads. | 42 | 50 | 5,000,000.00 |
| 43 | Development of the road from the Wegama main road to Mr. Dharmadasa's house. | 43 | 10 | 1,000,000.00 |
| 44 | Development of the Attica-Gahakotuwa road. | 44 | 30 | 2,000,000.00 |
| 45 | Development of the Pothuwewa road. | 45 | 75 | 2,000,000.00 |
| 46 | Concreting the road in the upper part of Madiyagama. | 46 | 20 | 1,000,000.00 |
| 47 | Development of Sirisewana Wattha playground and cemetery. | 47 | 45 | 2,000,000.00 |
| 48 | Development of all roads in Galserugolla. | 48 | 80 | 5,000,000.00 |
| 49 | Development of Siyambalaatta roads. | 49 | 25 | 1,000,000.00 |
| 50 | Development of the road near the public well. | 50 | 15 | 2,000,000.00 |
| 51 | Development of the road from Madige main road to Mr. Sirisena's house. | 51 | 20 | 2,000,000.00 |
| 52 | Development of the road in front of Mr. Isan's house | 52 | 3 | 2,000,000.00 |
| 53 | Development of Isuru Uyana Estate Road | 53 | 20 | 1,000,000.00 |
| 54 | Renovation of stone anvil. | 54 | 110 | 3,000,000.00 |
| 55 | Development of the road from near Mr. Nimal's house to Mr. Gunadasa's house. | 55 | 4 | 1,500,000.00 |
| 56 | Development of the Ehelagolla Road. | 56 | 10 | 2,500,000.00 |
| 57 | Development of the Pothuwewa reservoir and its streams. | 57 | 150 | 5,000,000.00 |
| 58 | Development of the road from near Mrs. Deepani's house in Bulugahamulawatte to Mr. Premadasa's house. | 58 | 10 | 1,000,000.00 |
| 59 | Development of the road from the paddy field leading to Upper Handupola to the tank embankment. | 59 | 150 | 1,000,000.00 |
| 60 | Promoting chicken farming. | 60 | 5 | 500,000.00 |
547 - Alakolamanda
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Commencing a water project for the Alakolamada Division. | 1 | 200 | 1,000,000.00 |
| 2 | Providing self-employment assistance and constructing a factory for self-employment. | 2 | 80 | 5,000,000.00 |
| 3 | Expanding and developing the Alakolamada School Road. | 3 | 100 | 8,000,000.00 |
| 4 | Construction of a service pavilion in the Alakolamada division. | 4 | 500 | 8,000,000.00 |
| 5 | Widening and construction of the side wall of the first culvert on the road leading to Alakolamada village. | 5 | 200 | 1,000,000.00 |
| 6 | Installation of an RO filter for the Alakolamada public well. | 6 | 80 | 1,500,000.00 |
| 7 | Development of side roads on School Road. | 7 | 100 | 6,500,000.00 |
| 8 | Renovation of the Bambaragaha Canal Bridge (Iron Bridge). | 8 | 85 | 6,000,000.00 |
| 9 | Concreting the two roads leading from the main road to the front and back of Mrs. Kusumawathi's house. | 9 | 22 | 700,000.00 |
| 10 | Development of the road leading to the temple from the Kurunegala-Matale main road. | 10 | 4 | 2,500,000.00 |
| 11 | Construction of a school building for Nalandawa College, Alakolamada. | 11 | 373 | 8,000,000.00 |
| 12 | Increasing the electrical capacity of the Alakolamada area. (Installation of a transformer) | 12 | 84 | 1,800,000.00 |
| 13 | Construction of a security fence at the Youth Corps. | 13 | 144 | 500,000.00 |
| 14 | Development of the Alakolamada inlet and its tributaries. | 14 | 22 | 1,500,000.00 |
| 15 | Construction of the road from Paluwatta Road to School Road through the paddy fields. | 15 | 75 | 4,000,000.00 |
548 - Korossa
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Completion of the remaining work on the service building. | 1 | 2073 | 2,000,000.00 |
| 2 | Development of the road to the cemetery. | 2 | 2073 | 1,000,000.00 |
| 3 | Development of the Kurakappitiya agricultural road up to Katupilagolla. | 3 | 118 | 5,000,000.00 |
| 4 | Providing equipment to improve the coconut shell industry. | 4 | 4 | 500,000.00 |
| 5 | Development of the Korossa-Alakolamada road. | 5 | 185 | 1,000,000.00 |
| 6 | Development of the road near Mr. Hemantha's house. | 6 | 25 | 2,000,000.00 |
| 7 | Construction of culvert and embankment on Waragolla road. | 7 | 110 | 6,000,000.00 |
| 8 | Development of the Ambalantenna road. | 8 | 58 | 4,000,000.00 |
| 9 | Renovation of the Korossa agricultural well. | 9 | 38 | 1,000,000.00 |
| 10 | Renovation of the Eriya Spring agricultural well. | 10 | 42 | 1,000,000.00 |
| 11 | Development of the Alhenakanatta road. | 11 | 85 | 4,000,000.00 |
| 12 | Development of side roads in Matiyagalla Wele. | 12 | 40 | 2,500,000.00 |
| 13 | Development of the agricultural road leading to the Pasella rice fields. | 13 | 28 | 1,000,000.00 |
| 14 | Development of the bypass road at Pathingolla Estate. | 14 | 128 | 5,000,000.00 |
| 15 | Development of the Egodagama road up to Mutthettiya. | 15 | 68 | 4,000,000.00 |
| 16 | Development of the road from near the temple well to Matiyagalla Wela. | 16 | 38 | 4,000,000.00 |
| 17 | Development of the Narangahalla road. | 17 | 32 | 2,000,000.00 |
| 18 | Development of the road leading to the Palu Paruwela paddy field. | 18 | 32 | 1,000,000.00 |
| 19 | Renovation of the Matiyagalla Anvil. | 19 | 48 | 2,000,000.00 |
| 20 | Drinking water project for Korossa village in Udawatte | 20 | 225 | 8,000,000.00 |
| 21 | Drinking water project for Alhenkanatta village | 21 | 120 | 8,000,000.00 |
| 22 | Renovation of the Ambalantenna Dam. | 22 | 49 | 1,000,000.00 |
| 23 | Renovation of the Aswedduma Dam. | 23 | 42 | 1,500,000.00 |
| 24 | Construction of a side embankment near the Udawatta road. | 24 | 110 | 1,500,000.00 |
| 25 | Construction of the side wall of the Matiyagalla paddy field. | 25 | 28 | 1,000,000.00 |
| 26 | Development of side roads in Udawatte village. | 26 | 142 | 2,500,000.00 |
| 27 | Preparing the sidewall of the Eriyaulpatha rice field. | 27 | 32 | 1,000,000.00 |
| 28 | Development of the remaining sections of the by-roads in Savistowatta. | 28 | 85 | 2,500,000.00 |
| 29 | Setting up the side wall of the Maithri Welfare Society. | 29 | 85 | 2,000,000.00 |
| 30 | Setting up the side wall of the Sri Sumangala Mortuary Aid Society. | 30 | 62 | 2,000,000.00 |
| 31 | Setting up the sidewall at the signal station. | 31 | 36 | 1,500,000.00 |
| 32 | Providing assistance for self-employment. * Tailoring * Production of three-five powders * Production of finished garments | 32 | 5 | 1,100,000.00 |
| 33 | Providing roofing sheets for private homes. | 33 | 4 | 200,000.00 |
| 34 | Development of the road from Carpet Road to Sri Parakrama Mortuary Aid Society. | 34 | 22 | 3,000,000.00 |
549 - Dadamgaslanda
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Providing assistance to Mrs. A.G. Chitra Hettiarachchi to start a business | 1 | 1 | 500,000.00 |
| 2 | Removal of unauthorized building on the access road to Mrs. T.G. Chandralatha's house | 2 | 1 | 100,000.00 |
| 3 | Issuance of permits and land deeds for the Talakolahena village land plot | 3 | 50 | 1,000,000.00 |
| 4 | Clearing and developing the road to Dodamigaslanda via Uswatte, Thalakolahena | 4 | 80,000,000.00 | |
| 5 | Development of the Talakolahena main road | 5 | 81 | 20,000,000.00 |
| 6 | Improving the telephone signal system for the village of Thalakolahena | 6 | 100 | 600,000.00 |
| 7 | Providing machinery for Mr. Susantha Samarasinghe's carpentry and masonry industries | 7 | 81 | 500,000.00 |
| 8 | Development of the second floor of the Thalakolahena Community Hall | 8 | 1 | 80,000,000.00 |
| 9 | Acquiring land and preparing the playground for the construction of a playground for the village of Elwalapitiya | 9 | 81 | 8,000,000.00 |
| 10 | Registration of Thalakolahena Pre-School and completion of its requirements | 10 | 81 | 500,000.00 |
| 11 | Providing the necessities to start rice cultivation | 11 | 81 | 1,600,000.00 |
| 12 | Providing electricity to homes without electricity | 12 | 81 | 1,000,000.00 |
| 13 | Providing a safe house for Mrs. J.D. Piyasili's snake chilli cultivation | 13 | 45 | 500,000.00 |
| 14 | Providing a mobile trading booth to Mrs. Lakmini Asanka | 14 | 12 | 300,000.00 |
| 15 | Appointment of a sales representative for Mrs. Nimali Madushika's sewing business | 15 | 8 | 500,000.00 |
| 16 | Providing a dehydrator to the Farmers' Women's Association | 16 | 81 | 800,000.00 |
| 17 | Providing Mr. H.M. Gunaratne with the necessary knowledge and equipment for fly control | 17 | 1 | 100,000.00 |
| 18 | Providing machinery for coir-based products to Mrs. Anuradhi of Elwalapitiya | 18 | 11 | 500,000.00 |
| 19 | Development of the entrance road to the Thalakolahena Temple | 19 | 45 | 20,000,000.00 |
| 20 | Providing electricity to the Talakolahena monastery | 20 | 25 | 500,000.00 |
| 21 | Providing self-employment opportunities for the rural areas of Thalakolahena | 21 | 1 | 1,000,000.00 |
| 22 | Providing a necessary tool for Mr. U.G. Piyaratne's carpentry business | 22 | 81 | 500,000.00 |
| 23 | Providing a coconut husk cutting machine to Mr. S. Nimal Premasiri | 23 | 25 | 500,000.00 |
| 24 | Initiation of a water project for the village of Thalakolahena | 25 | 8 | 2,000,000.00 |
| 25 | Preparation of Dikwela Yaya Canal Wela | 26 | 45 | 1,000,000.00 |
| 26 | Development of the road from near Mrs. Chamali's house to Mrs. Amatha Kumarihamy's house | 27 | 45 | 6,000,000.00 |
| 27 | Providing B.A. Mrs. Airangani Balasuriya with the necessary animals and building for poultry farming | 28 | 1 | 200,000.00 |
| 28 | Providing the necessary oil pressing machines for Mr. Donald Abeysekara's coconut oil business | 29 | 8 | 500,000.00 |
| 29 | Development of the Thalakolahena Sports Ground | 30 | 1 | 1,000,000.00 |
| 30 | Providing assistance for future work on Mr. T.A. Abeysinghe's house | 31 | 20 | 500,000.00 |
| 31 | Providing desks for the library of the Sinha Kekula Children's Club | 32 | 1 | 500,000.00 |
| 32 | Providing a high-speed machine and a block machine to Mrs. D.A. Gunawathi | 33 | 20 | 400,000.00 |
| 33 | Development of the road from near Mrs. Priyangani's house to Mr. Chandrathilaka's house | 34 | 1 | 3,000,000.00 |
| 34 | Providing the necessary building and animals for poultry farming to Mr. D.R. Chamara Dissanayake | 35 | 1 | 200,000.00 |
| 35 | Construction of the middle bund | 36 | 1 | 2,000,000.00 |
| 36 | Preparation of Elwala Pitiya with Weralugolla Anvil Sluice Gates | 37 | 1 | 1,200,000.00 |
| 37 | Concreting of the Elwalapitiya Weralugolla embankment | 38 | 1 | 7,500,000.00 |
| 38 | Construction of the road from Naranga Ela to Elwalapitiya | 39 | 1 | 50,000,000.00 |
| 39 | Development of the road to Thalakolahena by installing a culvert | 40 | 1 | 2,000,000.00 |
| 40 | Construction of Elwalapitiya Society Hall | 41 | 1 | 8,000,000.00 |
| 41 | Construction of the road and ditch through the paddy field of G.D. Gunathilana Somadeva, Talakolahena | 42 | 81 | 1,000,000.00 |
| 42 | Providing a coconut husk cutting machine to Mr. S. Nimal Premasiri | 44 | 22 | 500,000.00 |
| 43 | Development of the road leading to the middle of the Thalakolahena | 45 | 81 | 8,000,000.00 |
| 44 | Providing toilet facilities for those without toilets | 46 | 1 | 100,000.00 |
| 45 | Development of bays at necessary locations on the Elwalapitiya road | 47 | 50 | 1,000,000.00 |
| 46 | Preparation of Dikwela Yaya Canal Wela | 48 | 48 | 1,000,000.00 |
550 - Meepitiya
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Construction of a small culvert at the starting point of the Kadumulla road | 1 | 15 | 1,000,000.00 |
| 2 | Construction of a small pond near the Hospice on Koswatta Road | 2 | 200 | 2,000,000.00 |
| 3 | Construction of a small culvert on the Maradanda-Dunumadalawa road | 3 | 25 | 1,000,000.00 |
| 4 | Construction of the toilet system at the Mipitiya Temple | 4 | 450 | 1,000,000.00 |
| 5 | Development of the Twenty Acre Road | 5 | 150 | 1,000,000.00 |
| 6 | Development of Kanugolla Road | 6 | 70 | 1,500,000.00 |
| 7 | Development of Kadumulla Road | 7 | 15 | 1,000,000.00 |
| 8 | Development of the double-lane road near Mr. Bandara's house | 8 | 5 | 2,000,000.00 |
| 9 | Providing machinery for the production of furniture | 9 | 5 | 500,000.00 |
| 10 | Promoting dairy farming | 10 | 3 | 500,000.00 |
| 11 | Promoting the cultivation of Naimiris bibimal | 11 | 5 | 200,000.00 |
| 12 | Promoting fly control | 12 | 2 | 300,000.00 |
| 13 | Providing a dehydrator to carry out a project through jackfruit-related production | 13 | 5 | 100,000.00 |
| 14 | Giving a sewing machine to Mrs. Lilawathi | 14 | 4 | 250,000.00 |
| 15 | Completion of the remaining work at the funeral home | 15 | 200 | 500,000.00 |
| 16 | Providing communication towers | 16 | 500 | 5,000,000.00 |
| 17 | Development of the playground | 17 | 197 | 1,000,000.00 |
| 18 | Official Services Building Construction | 18 | 197 | 1,000,000.00 |
| 19 | Development of Mipitiya Thawalama Road | 19 | 10 | 1,000,000.00 |
| 20 | Obtaining a water extension from Wewatenna to Mipitiya | 20 | 250 | 2,000,000.00 |
| 21 | Development of the road leading to Mahakumburu Wattha | 21 | 10 | 1,000,000.00 |
551 - Rathvita
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Construction of a building and purchase of equipment to establish a non-dairy by-products sales center | 1 | 100 | 1,000,000.00 |
| 2 | Extension of the existing water supply line to Kurundugolla through the Water Supply Board to Ratwita | 2 | 400 | 25,000,000.00 |
| 3 | Development of the Galkanda road from the main road to Rathwata Wewa | 3 | 45 | 2,000,000.00 |
| 4 | Development of the road from near the Lower Ratwita Temple to the middle of the road | 4 | 45 | 3,000,000.00 |
| 5 | Development of necessary areas on the road from Pethangalle Junction to Medageda | 5 | 60 | 1,500,000.00 |
| 6 | Widening and development of the road leading to the cemetery | 6 | 70 | 500,000.00 |
| 7 | Further development of the Kankeya Hena road | 7 | 30 | 800,000.00 |
| 8 | Development of necessary places on Ratmalgolla Road | 8 | 30 | 500,000.00 |
| 9 | Development of the road leading to Ratwita Lake | 9 | 30 | 1,000,000.00 |
| 10 | Development of the road from near the Ratwita Mortuary Aid Society Hall to Godella Anumna | 10 | 40 | 500,000.00 |
| 11 | Development of the Pethangalla road from near the Mortuary Aid Society Hall | 11 | 30 | 500,000.00 |
| 12 | Development of the Pethangalle Tank Road to the main road via the cemetery | 12 | 40 | 5,000,000.00 |
| 13 | Development of side roads from the main road to Pothu Wewa Road | 13 | 20 | 10,000,000.00 |
| 14 | Development of the road from Pothuwewa to the paddy fields | 14 | 20 | 500,000.00 |
| 15 | Development of the road from Pethangolla Junction to the paddy field | 15 | 30 | 1,000,000.00 |
| 16 | Development of the road leading to Mr. Indika's house | 16 | 15 | 500,000.00 |
| 17 | Development of Pitawala Road | 17 | 30 | 15,000,000.00 |
| 18 | Development of the road from near Mr. Ekanayake's house to Mr. Jivan's house | 18 | 15 | 500,000.00 |
| 19 | Development of the road leading to Pethangalle Estate | 19 | 15 | 700,000.00 |
| 20 | Development of the drain along the bay on the Pethangalle main road | 20 | 40 | 5,000,000.00 |
| 21 | Development of Lower Ratwita Road from Ratwita Main Road | 21 | 10 | 500,000.00 |
| 22 | Development of the side road from near Mr. Alawathugoda's house to Mr. Ajith's house | 22 | 20 | 1,000,000.00 |
| 23 | Development of Gorokgahamula Godella Annex | 23 | 30 | 1,000,000.00 |
| 24 | Development of the side wall of the Pethangalle Kapukotuwa tank | 24 | 20 | 1,000,000.00 |
| 25 | Development of the road leading to the Priyantha Rice Business | 25 | 15 | 5,000,000.00 |
| 26 | Development of the Pethangalla tank embankment and side embankment | 26 | 25 | 1,000,000.00 |
| 27 | Renovation of the walls of the Dalupatha temple | 27 | 30 | 1,000,000.00 |
| 28 | Renovation of the Vidane Tank | 28 | 20 | 1,000,000.00 |
| 29 | The existing tillage system in the Vihena paddy field | 29 | 15 | 600,000.00 |
| 30 | Construction of a bridge to cross the Gorokgaha Mulagodella Anvil | 30 | 25 | 600,000.00 |
| 31 | Providing electricity to Pitawala Road | 31 | 60 | 2,000,000.00 |
| 32 | Providing a transformer for the Pethangalle road | 32 | 100 | 5,000,000.00 |
| 33 | Increasing the capacity of existing electrical connections | 33 | 60 | 1,500,000.00 |
| 34 | Concreting of Ratwita Pansal Road ahead | 34 | 50 | 500,000.00 |
| 35 | Installing a solar system at Ratwita Temple | 35 | 150 | 1,000,000.00 |
| 36 | Development of the Ratwita School playground | 36 | 200 | 1,900,000.00 |
| 37 | Providing a toilet system for the children of Ratwita Dhamma School | 37 | 100 | 500,000.00 |
| 38 | Providing electricity to Mrs. Punchina's house | 38 | 2 | 200,000.00 |
| 39 | Providing a water purification project to Ratwita village | 39 | 600 | 1,000,000.00 |
| 40 | Providing a pest control project | 40 | 5 | 50,000.00 |
| 41 | Providing the necessary equipment for the production of handkerchiefs | 41 | 10 | 200,000.00 |
| 42 | Providing sewing machines to low-income beneficiaries engaged in the sewing industry | 42 | 30 | 1,000,000.00 |
| 43 | Providing necessary equipment for the production of furniture | 43 | 1 | 200,000.00 |
| 44 | Taking steps to prevent existing wildlife damage | 44 | 30 | 500,000.00 |
| 45 | U,M. Providing a cowshed to Mrs. Srimal's house | 45 | 3 | 500,000.00 |
| 46 | Installing electric lights on the main road | 46 | 400 | 50,000.00 |
| 47 | Providing quality care to organic farmers | 47 | 10 | 300,000.00 |
| 48 | Providing a toilet at Mrs. Pung'china's house | 48 | 2 | 2,500,000.00 |
| 49 | Request for a public road to the Panwala public well | 49 | 15 | 500,000.00 |
| 50 | Construction of the Officer Services Building | 50 | 600 | 1,000,000.00 |
| 51 | I request an access road to the Ratwita rice field. | 51 | 30 | 200,000.00 |
| 52 | Creating liquid milk-based jaggery products | 52 | 20 | 500,000.00 |
| 53 | Renovation of Ratwita School buildings | 53 | 200 | 1,500,000.00 |
| 54 | Providing insect nets to prevent insect damage | 54 | 15 | 5,000,000.00 |
552 - Gopallawa
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Construction of a building and purchase of necessary equipment to establish a dairy by-product and marketing center jointly by the Ratwita, Gopallawa and Piyathala divisions | 1 | 100 | 1,000,000.00 |
| 2 | Reconstruction of the main embankment of Divulgaha Kotuwa, which was exposed due to the disaster | 2 | 50 | 2,000,000.00 |
| 3 | Providing housing assistance | 3 | 4 | 1,000,000.00 |
| 4 | Pepper cultivation | 4 | 40 | 200,000.00 |
| 5 | Providing facilities for black betel cultivation to the Women's Farmer's Association | 5 | 20 | 500,000.00 |
| 6 | Getting self-employment like Pahanthira | 6 | 10 | 100,000.00 |
| 7 | Renovation of the Galvetiya Anvil | 7 | 14 | 1,500,000.00 |
| 8 | Providing toilets for those without toilets | 8 | 3 | 150,000.00 |
| 9 | Providing electricity to Mrs. AP Premawathi's house | 9 | 1 | 50,000.00 |
| 10 | Providing water supply to the required areas | 10 | 140 | 5,000,000.00 |
| 11 | Construction of the Gopallawa Bridge Handrail | 11 | 500 | 500,000.00 |
| 12 | Renovation of the Karamba Anvil | 12 | 12 | 500,000.00 |
| 13 | Providing necessary facilities for Anthurium cultivation | 13 | 5 | 400,000.00 |
| 14 | Construction of a small culvert across the dirty canal to reach the Divul Gahakotuwa farm (near the fields of Sobhitha Mihige and Nuwan Ratwita) | 14 | 6 | 300,000.00 |
| 15 | Development of the road near Mr. AP Chandusena's shop | 15 | 12 | 1,000,000.00 |
| 16 | Taking measures to take over the land illegally occupied by the government by surveying the main canal from the beginning of the Meddeketiya tank to the Gopallawa bridge. | 16 | 125 | 500,000.00 |
| 17 | The Chan Door of the Stone Anvil has been completely restored. | 17 | 80 | 100,000.00 |
| 18 | Development of the main road and two side roads in Karambe | 18 | 11 | 1,000,000.00 |
| 19 | Providing supplies for the hop business to Mrs. Niranjala Shalika | 19 | 1 | 100,000.00 |
| 20 | Expansion of the Divulgahakotuwa irrigation system | 20 | 50 | 200,000.00 |
| 21 | Development of the side embankments of the Chan Ale of the Kitulgahamula Tank | 21 | 27 | 700,000.00 |
| 22 | Concrete pouring from near Mrs. Chandrawathi's house on the Gopallawa Henegama road onwards | 22 | 40 | 700,000.00 |
| 23 | Developing the remaining section of the road by installing a culvert at the junction with the main road at Medagedara Junction | 23 | 150 | 1,500,000.00 |
| 24 | The place where the water from the Thalgaha Mula Tank and the Meddakatiya Tank meet is the house of Mr. Nissanka Kemipitiya. | 24 | 20 | 2,000,000.00 |
| 25 | Development of the Kumburugolla Cemetery Highway | 25 | 70 | 200,000.00 |
| 26 | Surveying the Kalgahamula tank and restoring the tank by pouring gravel on the tank embankment | 26 | 60 | 700,000.00 |
| 27 | Surveying the area related to the Korawakka tank and renovating the tank | 27 | 14 | 500,000.00 |
| 28 | Renovation of the necessary sections of the road along the Thalgagahamula tank spillway using culverts | 28 | 25 | 2,500,000.00 |
| 29 | Repair of the side wall of the Elagawa Wele Canal | 29 | 3 | 1,000,000.00 |
| 30 | Conducting survey work and renovating the Thikulgahakotuwa tank | 30 | 27 | 2,000,000.00 |
| 31 | Providing a cowshed to Mrs. Chitra Ranatunga | 31 | 1 | 400,000.00 |
| 32 | Development of the road near Mrs. Chithra Ranatunga's house | 32 | 500,000.00 | |
| 33 | Concreting the necessary areas on the Amba Danda road | 33 | 4 | 1,000,000.00 |
| 34 | Re-check and adjust the water level | 34 | 50 | 200,000.00 |
| 35 | Mr. R. M. Ratnayake was given a lawn mower. | 35 | 1 | 30,000.00 |
| 36 | Development of necessary areas on the section of the Tuththiripitiya road belonging to the division | 36 | 60 | 1,000,000.00 |
| 37 | Providing financial assistance to Mrs. Rasika to improve her shop | 37 | 1 | 50,000.00 |
| 38 | Development of Kosgolla Road in front of the Cooperative | 38 | 2 | 500,000.00 |
| 39 | Giving a gift to Mr. Thikshana | 39 | 2,000,000.00 | |
| 40 | Obtaining financial assistance for Mr. W.M.M.E. Bandara's tea leaf business | 40 | 15 | 500,000.00 |
| 41 | Development of the road near Mrs. Hingamima's house by installing a culvert | 41 | 15 | 1,000,000.00 |
| 42 | Giving a Juki machine to Mrs. Buddiki Athuru Mahamiya | 42 | 1 | 125,000.00 |
| 43 | Concreting of necessary places on the Gopallawa Monastery Road | 43 | 25 | 1,000,000.00 |
| 44 | Development of the road near Mr. Gunathilaka Banda's house | 44 | 25 | 500,000.00 |
553 - Lihiniwehera
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Installing a solar panel to divert water from the dam through GI pipes to the rice fields in the area | 1 | 50 | 1,000,000.00 |
| 2 | Tarring of the road near Lihiniwehera, Kirimandala | 2 | 350 | 3,200,000.00 |
| 3 | Development of the powerful Thalawatta road and two adjacent side roads | 3 | 80 | 3,700,000.00 |
| 4 | Concreting of the 7th lane of the Lenavihara Watta Road up to the Pivusumi Road Market | 4 | 175 | 2,300,000.00 |
| 5 | Concreting of necessary areas on the Lihiniwehera-Gaslabuwatta road | 5 | 200 | 2,600,000.00 |
| 6 | Carving out the remaining portion of the Lihiniwehera Ratwita Marla | 6 | 20 | 5,700,000.00 |
| 7 | Concreting and developing all side roads related to the Lalathuduwa Estate Road and preparing the drainage system | 7 | 380 | 3,500,000.00 |
| 8 | Construction of a community hall at the Jalathuduwa estate, acquisition of land plots | 8 | 150 | 3,500,000.00 |
| 9 | Providing a water purifier and installing a solar panel for the Shrama Shakthi Water Project | 9 | 219 | 3,500,000.00 |
| 10 | Developing the remaining sections of the Alawathuwala Colony Road | 10 | 151 | 2,800,000.00 |
| 11 | Enlarging the tank where the water from the Nuwarayaya mountain falls, and diverting the water through a pipe to the Kuuru Yaya | 11 | 200 | 2,600,000.00 |
| 12 | Implementation of vocational courses for the youth in the field of electronic TV and telephone repair | 12 | 150 | 1,000,000.00 |
| 13 | Creating a food dehydration business | 13 | 53 | 4,200,000.00 |
| 14 | Expanding the cultivation of Nimirus | 14 | 16 | 200,000.00 |
| 15 | Upali's personal clothing production is being transformed into collective clothing production. | 15 | 30 | 2,000,000.00 |
| 16 | Establishing a collective chicken farm and turning it into compost production | 16 | 60 | 100,000.00 |
| 17 | Providing orange plants for home gardening and promoting cultivation | 17 | 50 | 300,000.00 |
| 18 | Development of the Lihiniwehera Galkanda Road | 18 | 20 | 2,400,000.00 |
| 19 | Developing the remaining section of the Ambagahawela Watta Road with crushed stone | 19 | 32 | 1,000,000.00 |
| 20 | Using conservation methods to prevent erosion of the banks of the small stream | 20 | 10 | 50,000.00 |
| 21 | Installation of electric bulbs in necessary places in Lihiniwehera area | 21 | 2500 | 32,000.00 |
| 22 | Construction of an official shade office for the Lihiniwehera division | 22 | 2000 | 5,000,000.00 |
| 23 | Construction of a playground in Lihiniwehera division | 23 | 125 | 3,200,000.00 |
| 24 | Encouragement to re-cultivate abandoned private lands | 24 | 20 | 200,000.00 |
| 25 | Development of the road from near Mr. Sunil's house in the first lane of Lenavihara Watta to Mr. Saman's house | 25 | 70 | 600,000.00 |
| 26 | Development of Mipitiya Wattha Road - Lihiniwehera | 26 | 50 | 4,000,000.00 |
554 - Nuwarayaya
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Installing a solar panel to divert water from the dam through GI pipes to the rice fields in the area | 1 | 50 | 1,000,000.00 |
| 2 | Development of the main road through the village | 2 | 1300 | 5,000,000.00 |
| 3 | Developing the road through the Buddhist temple | 3 | 150 | 2,000,000.00 |
| 4 | Construction of the service building | 4 | 1132 | 2,500,000.00 |
| 5 | Development of the necessary roads from the beginning of Nuwara Eliya Section A to the cemetery | 5 | 165 | 2,000,000.00 |
| 6 | Extension of the downstream area of the Nuwara Eliya Community Water Project in Section B | 6 | 140 | 1,500,000.00 |
| 7 | Extension of the Water Supply Board's water supply to the end of the Rubber Estate Colony | 7 | 25 | 1,500,000.00 |
| 8 | Reviving the coir industry of Mr. WA Saman Priyalal | 8 | 1 | 300,000.00 |
| 9 | Making a bay on the road running near the school | 9 | 150 | 200,000.00 |
| 10 | Development of the Rubber Estate Colony Road | 10 | 65 | 15,000,000.00 |
| 11 | Marketing and promoting the production of mahumima | 11 | 5 | 500,000.00 |
| 12 | AEPA Vijayanayake Mahataga Lime Industry Development | 12 | 3 | 300,000.00 |
| 13 | Installing the Akaki Light in a suitable location near the church | 13 | 20 | 50,000.00 |
| 14 | Providing a poultry farming project to Mr. WA Kemasiri | 14 | 1 | 3,000,000.00 |
| 15 | Development of the road from Nottase to Kiri Mandala in Nuwara Eliya B section | 15 | 65 | 2,000,000.00 |
| 16 | Creating entrepreneurs to produce palm oil and value-added products related to palm oil | 16 | 5 | 2,000,000.00 |
| 17 | Installation of road markings for the main road through the village | 17 | 5 | 100,000.00 |
| 18 | Referral to youth community and counseling services | 18 | 15 | 100,000.00 |
| 19 | Development of the existing volleyball court | 19 | 50 | 500,000.00 |
| 20 | Expanding a pest control project in the village | 20 | 25 | 500,000.00 |
| 21 | Expansion of fruit cultivation | 21 | 15 | 200,000.00 |
| 22 | Promoting the cultivation of minor export crops | 22 | 10 | 1,000,000.00 |
| 23 | Providing orange plants for home gardening and promoting cultivation | 23 | 25 | 500,000.00 |
| 24 | Goat Farming Expansion Project | 24 | 2 | 300,000.00 |
| 25 | Empowering self-employment with profits | 25 | 10 | 1,000,000.00 |
555 - Kothalawalagama
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Development of the Ao Uyana main road using side walls | 1 | 450 | 10,000,000.00 |
| 2 | 14 Preparing the protective cover of the well of the Yaya Water Project | 2 | 75 | 500,000.00 |
| 3 | Ayurvedic hospital road development | 3 | 1240 | 1,000,000.00 |
| 4 | Cultivation of snake chili | 4 | 5 | 200,000.00 |
| 5 | Renovation of the streets of Ao Uyana Marla | 5 | 450 | 500,000.00 |
| 6 | Lands in Kotalawalagama division cleared and deeds issued | 6 | 90 | 500,000.00 |
| 7 | Development of the remaining undeveloped sections near the temple and at the beginning of the 14th Yaya Road near Tankadola on the Goluwahena Road | 7 | 650 | 2,000,000.00 |
| 8 | Development of the remaining undeveloped sections of the Gerirakdola 04th Lane Road by installing a culvert | 8 | 55 | 4,000,000.00 |
| 9 | 1 lane main road development | 9 | 110 | 1,000,000.00 |
| 10 | Repair of the roof of the Grama Niladhari's official shelter in Kotalawala village, providing water, electricity and sanitation facilities | 10 | 1240 | 2,000,000.00 |
| 11 | Development of the road leading down from Mr. Navaratne's house | 11 | 150 | 3,000,000.00 |
| 12 | Completion of the remaining work at the Uswatte Society Hall | 12 | 95 | 600,000.00 |
| 13 | Installation of 1st Lane Street Lights | 13 | 110 | 500,000.00 |
| 14 | Development of the side road leading to Mrs. Sudanthika's house on the 1st lane | 14 | 25 | 1,000,000.00 |
| 15 | Development of the side road leading to the house of Mr. Kumari, Lane 1 | 15 | 15 | 1,000,000.00 |
| 16 | Repairing the drainage system on all roads in Kotalawalagama Division | 16 | 1240 | 5,000,000.00 |
| 17 | Development of the road behind Dodamigaslanda Market | 17 | 65 | 2,000,000.00 |
| 18 | Development of the remaining unimproved sections of the 11-lane road | 18 | 75 | 5,000,000.00 |
| 19 | Development of the road leading up to the four-way junction at the end of the Gorakadola 4th Lane Road | 19 | 25 | 1,000,000.00 |
| 20 | Renovation of the society hall near Samurdhi Bank, Kothalawalagama | 20 | 14 | 500,000.00 |
556 - Madithiyawa
| 1 | Development of side embankments at required locations on both sides of the Hagarankotawa road from Hetitiyawatta Junction through the reservoir | 1 | 280 | 6,000,000.00 |
| 2 | Development of the road and side road from in front of Rohana Wickramanayake's house to HM Dissanayake's house on the Wekdesiwatte main road using bays | 2 | 210 | 4,000,000.00 |
| 3 | Development of the road in front of Ajith Pushpakumara's house up to the Siddha cemetery | 3 | 30 | 2,000,000.00 |
| 4 | Development of the road from in front of Kosgollegoda Society Hall | 4 | 180 | 2,500,000.00 |
| 5 | Development of the Amibagoda road from near the temple via Embalawa tank to Hetitiyawatte junction | 5 | 200 | 5,000,000.00 |
| 6 | Development of the main road and side road from near Mahesh's house in Kanthoru Watta to Tilak's house | 6 | 90 | 5,000,000.00 |
| 7 | Development of the main canal from Madithiyawa to Soroviwe | 7 | 180 | 2,000,000.00 |
| 8 | Renovation of the roof of the Madithiyawa Pre-School | 8 | 25 | 1,000,000.00 |
| 9 | Construction of a new Dhamma school building | 9 | 200 | 2,000,000.00 |
| 10 | Development of necessary areas using side walls on the road near Kanuwa, Madithiyawa 19 | 10 | 30 | 3,000,000.00 |
| 11 | Concreting of the main canal and the side canal from the sluice gate of the Salgasmula Tank in Madithiyawa | 11 | 180 | 5,000,000.00 |
| 12 | Providing financial assistance for Mrs. J.M. Wasantha Jayasuriya's dried fish marketing business | 12 | 1 | 50,000,000.00 |
| 13 | Development of the road from Madithiyawa to the lake using concrete | 13 | 180 | 3,000,000.00 |
| 14 | Non-financial assistance for an export-oriented coconut husk manufacturing business | 14 | 1 | 500,000.00 |
| 15 | Providing desks and benches for a Dhamma school child | 15 | 5 | 500,000.00 |
| 16 | Development of the road from near Mr. Abeiratne's land to the water project | 17 | 40 | 2,000,000.00 |
| 17 | Removal and development of the well from near Mr. Kapila Bandara's house to Ranasinghe's house | 18 | 15 | 2,000,000.00 |
| 18 | Development of the road from near the Madithiyawa Temple to Amibagoda Estate | 19 | 80 | 2,000,000.00 |
| 19 | Developing necessary areas along the dams and estuaries | 20 | 280 | 4,000,000.00 |
| 20 | Obtaining equipment required for the production of decorative items and furniture | 21 | 6 | 600,000.00 |
| 21 | Removing moss and silt from the Madithiyawa Lake and Amune | 22 | 180 | 500,000.00 |
| 22 | Development of the agricultural road leading from Mr. Alansuriya's house | 23 | 30 | 800,000.00 |
| 23 | Installing electrical wiring to the existing Dhamma school building | 24 | 200 | 50,000.00 |
| 24 | Removing the roof of the Madithiyawa Wendesiwatte Community Hall and constructing a service area on the upper floor using concrete | 25 | 4 | 2,000,000.00 |
| 25 | Installation of electric lamps at the necessary locations on all roads in the region | 26 | 800 | 200,000.00 |
| 26 | Construction of a water motor with the required capacity and a protective fence for the well for the Madithiyawa Community Water Project | 27 | 210 | 1,000,000.00 |
| 27 | Development of the road from opposite Lakshman's house on Amibagoda Road to Ajith's house | 28 | 40 | 2,000,000.00 |
| 28 | Development of Galgamuwa Watta Road from opposite Mr. Richardi's house on Amibagoda Road | 29 | 12 | 2,000,000.00 |
| 29 | Development of the road from in front of Mrs. Karunathi's house in Ridigama Colony to the end of the road in front of Mr. Jayaratne's house | 30 | 60 | 1,000,000.00 |
| 30 | S. N.M. Development of the road from in front of Shanthi Manike's house to the end | 31 | 45 | 500,000.00 |
| 31 | Development of the road within Hirikevei Estate | 32 | 45 | 3,000,000.00 |
| 32 | Providing equipment for those engaged in the field of rupalavanya | 33 | 3 | 600,000.00 |
| 33 | Providing assistance to construct a roof for the garage run by Mr. R.D. Jayasekara. | 34 | 1 | 800,000.00 |
| 34 | Providing electricity to the Kantoruwatta Society Hall | 35 | 140 | 500,000.00 |
| 35 | Electricity extension from near the house of T.M. Wajesinghe in Madithiyawa to the cemetery | 36 | 10 | 800,000.00 |
| 36 | Providing high-quality animals and equipment for dairy and poultry farmers | 36 | 8 | 800,000.00 |
| 37 | Providing equipment to all welfare societies in the region | 37 | 8 | 800,000.00 |
| 38 | Construction of side walls in front of the temple | 39 | 400 | 1,000,000.00 |
| 39 | Construction of a security fence for the Wendesiwatte Community Hall | 40 | 42 | 300,000.00 |
| 40 | Completion of the remaining work on the Sangawasa building | 41 | 400 | 1,000,000.00 |
| 41 | Providing assistance for the construction of a building for the mobile sales outlet currently operated by Mrs. Dilrukshi | 42 | 1 | 300,000.00 |
| 42 | Providing a machine to make buttons and coins for Mrs. Ashoka's sewing business. | 43 | 1 | 150,000.00 |
| 43 | Providing a stall to Mrs. S.D. Nandani | 44 | 5 | 500,000.00 |
| 44 | Providing self-employment training opportunities for women | 45 | 5 | 500,000.00 |
| 45 | Providing a training program related to coir production | 46 | 6 | 600,000.00 |
557 - Rideegama
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. | ||
| 1 | Ridigama | G-0557 | Development of the culvert near the water tank on the Balawehera road | 1 | 1200 | 5,000,000.00 |
| 2 | Ridigama | G-0557 | Constructing a pressurized water tank in the Wagolla area and providing water supply through water supply | 2 | 100 | 5,000,000.00 |
| 3 | Ridigama | G-0557 | Providing a water supply extension to the Balawehera Samagi Mawatha area from the Water Supply Board | 3 | 300 | 3,000,000.00 |
| 4 | Ridigama | G-0557 | Providing housing and sanitation facilities for low-income earners. | 4 | 30 | 5,000,000.00 |
| 5 | Ridigama | G-0557 | Construction of Wagolla Road up to Ridvihara Mawatha with side roads | 5 | 1200 | 5,000,000.00 |
| 6 | Ridigama | G-0557 | Development of Pinnagolla Road from Ridvihara Mawatha | 6 | 300 | 5,000,000.00 |
| 7 | Ridigama | G-0557 | Widening the road from the temple junction to the steps, creating a walkway and preparing the side wall | 7 | 150 | 5,000,000.00 |
| 8 | Ridigama | G-0557 | Providing water to three houses in Medagama | 8 | 5 | 500,000.00 |
| 9 | Ridigama | G-0557 | Development of Balawehera Samiti Road up to Keppitigala Road with all side roads | 9 | 1300 | 5,000,000.00 |
| 10 | Ridigama | G-0557 | Development of Balawehera Paradawa Culvert and Sluice | 10 | 1400 | 5,000,000.00 |
| 11 | Ridigama | G-0557 | Renovation of Ridigama Anvil and preparation of canal dams | 11 | 700 | 5,000,000.00 |
| 12 | Ridigama | G-0557 | Development of necessary places on the Balawehera road | 12 | 1400 | 2,500,000.00 |
| 13 | Ridigama | G-0557 | Development of the road near the Swarna Beauty Salon | 13 | 100 | 3,000,000.00 |
| 14 | Ridigama | G-0557 | Development of Medagama Road | 14 | 30 | 300,000.00 |
| 15 | Ridigama | G-0557 | Development of the Ridigama Cemetery by demarcating its boundaries | 15 | 150 | 5,000,000.00 |
| 16 | Ridigama | G-0557 | Development of a toilet system in Jayanthi Pitiya | 16 | 150 | 5,000,000.00 |
| 17 | Ridigama | G-0557 | Development of the Muladapotha road via Pelwatte | 17 | 250 | 5,000,000.00 |
| 18 | Ridigama | G-0557 | Providing equipment for new projects for low-income earners | 18 | 150 | 8,000,000.00 |
| 19 | Ridigama | G-0557 | Providing tools to existing project entrepreneurs | 19 | 250 | 2,000,000.00 |
| 20 | Ridigama | G-0557 | Implementing drug prevention programs | 20 | 10 | 500,000.00 |
| 21 | Ridigama | G-0557 | Developing the tourism industry | 21 | 400 | 5,000,000.00 |
558 - wewegedara
| Inde+A975:G1009 | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Construction of a water treatment complex for the Ridigama Water Supply Board and the Ridi Vihara Water Project | 1 | 1182 | 15,000,000.00 |
| 2 | Providing water to Tijayapura colony | 2 | 75 | 10,000,000.00 |
| 3 | Development of the road from near the house of Sarath Kumarasiri to Ridviharaya | 3 | 20 | 1,000,000.00 |
| 4 | Development of the final section of the Kiridigalla road | 5 | 25 | 1,000,000.00 |
| 5 | Vijayapura Public Well Renovation | 6 | 75 | 5,000,000.00 |
| 6 | Deepening the Nilanthatituwa Lake by removing vegetation | 7 | 135 | 4,000,000.00 |
| 7 | Concreting of the Galkanda road ahead | 8 | 12 | 1,000,000.00 |
| 8 | Development of the side wall near the beginning of Pathumi Uyana Road | 9 | 46 | 300,000.00 |
| 9 | Widening and development of the culvert in Atebagasya | 10 | 34 | 3,000,000.00 |
| 10 | Silting of the Ekandaduwala Lake | 11 | 25 | 1,000,000.00 |
| 11 | Preparation of the drainage system on the road from the main road to Ridi Viharaya | 12 | 102 | 3,000,000.00 |
| 12 | Repairing the fence of Dodamigaspanda Government School, meeting the drinking water needs and meeting the toilet needs | 13 | 600 | 3,000,000.00 |
| 13 | Development of the Dekaduwala Tank Canal using anicuts | 14 | 25 | 1,000,000.00 |
| 14 | Installation of road signs in Vijayapura and Atabagasyaya areas | 15 | 185 | 400,000.00 |
| 15 | Development of the road from near the depot in Vijayapura Colony to Kongaha | 17 | 45 | 2,000,000.00 |
| 16 | Development of the Nilanthatuwa Diwa Kapumi Road and the Athuru Road in two phases | 18 | 88 | 3,000,000.00 |
| 17 | Construction of rain shelters for students in front of Nilanthatituwa School | 19 | 600 | 7,000,000.00 |
| 18 | Development of the drainage system of the Atebagasya road by using culverts at necessary locations | 20 | 34 | 1,000,000.00 |
| 19 | Concreting the necessary areas from the starting point to the final point of the Pathumi Uyana road | 21 | 44 | 2,000,000.00 |
| 20 | Renovation of the canal that carries water from the Nilanthatituwa tank | 22 | 88 | 3,000,000.00 |
| 21 | Renovation of the drainage system at the starting point of the Pathumi Uyana road | 23 | 44 | 1,000,000.00 |
| 22 | Development of the road from Vijayapura to Wagolla | 24 | 30 | 1,000,000.00 |
| 23 | Reconstruction of the Nilanthatituwa reservoir embankment road with gravel | 25 | 28 | 200,000.00 |
| 24 | Development of the road from near the depot to near Nimal Jayasuriya's house to Ridhi Viharaya | 26 | 10 | 4,000,000.00 |
| 25 | Development of the road running near KK, Motorway | 27 | 9 | 1,000,000.00 |
| 26 | Widening of the culvert near Uyanwatte on the Nilanthatituwa-Matale road and widening of both sides of the road | 28 | 600 | 6,000,000.00 |
| 27 | Construction of a toilet system for Ridigama town | 30 | 600 | 2,000,000.00 |
| 28 | Extensive development of the Pathumi Uyana Community Hall | 31 | 44 | 500,000.00 |
| 29 | Development of the path from the front of the neighboring house to the paddy field | 33 | 13 | 300,000.00 |
| 30 | Development of the road from the tank to Mrs. Renuka's house | 34 | 6 | 300,000.00 |
| 31 | Development of the road from in front of Palitha's house to in front of Mr. Lanka Thilaka's house | 35 | 6 | 100,000.00 |
| 32 | Development of the road from the Government Carpentry School to Premajayantha's house | 36 | 5 | 500,000.00 |
| 33 | Development of the access road to the depot | 37 | 2 | 200,000.00 |
| 34 | Paving, building repairs, and electrical repairs in front of the entrance of Dodamigaslanda Royal College | 38 | 600 | 3,000,000.00 |
| 35 | Providing a three-storey main hall to Royal College, Dodamigaslanda | 39 | 600 | 45,000,000.00 |
| 36 | Construction of a car park for Ridigama Hospital staff and patients | 40 | 1000 | 1,000,000.00 |
| 37 | Repair of all drainage systems around Ridigama Hospital | 41 | 1000 | 800,000.00 |
| 38 | Preparation of isolation rooms for Ridigama Hospital, rooms where infectious patients can be kept separately (for wards 2,3,4) | 42 | 1000 | 1,000,000.00 |
| 39 | Repair of the roofs of the Ridigama Hospital, including the Ward Building, and other buildings | 43 | 1000 | 1,000,000.00 |
| 40 | Renovation of the hospital's toilet system | 44 | 1000 | 500,000.00 |
| 41 | Renovation of the men's restroom at Ridigama Hospital | 45 | 25 | 500,000.00 |
| 42 | Construction of an official residence building for government officials | 46 | 460 | 200,000.00 |
559 - warakawehera
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Development of the road leading to the old village, starting in front of Sisira Stores, passing through Kaju Kella and passing near Mr. Priyantha's house. | 1 | 220 | 16,000,000.00 |
| 2 | Implementing an animal control project | 2 | 100 | 10,000,000.00 |
| 3 | Development of the final section of the Aganwela road | 3 | 150 | 20,000,000.00 |
| 4 | Improving the toilet system to complete the remaining work at the Warakawehera Muthatuamiman Kovil | 4 | 145 | 2,500,000.00 |
| 5 | Development of the playground at Warakawehera College | 5 | 500 | 5,000,000.00 |
| 6 | Upgrading the Ekamuthu Saviya Community Hall building for public services | 6 | 156 | 5,000,000.00 |
| 7 | Development of the road from near Sisira Stos to the end of the Catholic Church | 7 | 225 | 2,500,000.00 |
| 8 | Development of the road running from near the Royal Communication to the main road, passing through the Aramibha Vi Cemetery. | 8 | 256 | 20,000,000.00 |
| 9 | Development of the road from near the United Welfare Society via the Aramibha Vi Kovil to the playground of Ridvihara Vidyalaya. | 9 | 350 | 2,000,000.00 |
| 10 | Development of the road starting in front of Mr. Dhanuka's shop and ending near Mr. Sugathadasa's house | 10 | 405 | 2,000,000.00 |
| 11 | Construction of new houses for 05 low-income families who are currently homeless and completion of work on the houses of low-income beneficiaries that have already been constructed | 11 | 25 | 50,000,000.00 |
| 12 | Development and renovation of Warakawehera Tank and Sluice | 12 | 124 | 25,000,000.00 |
| 13 | Renovation of the Waraka Wehera Hidamada Anvil | 13 | 144 | 1,000,000.00 |
| 14 | To encourage entrepreneurs, three-phase electricity and equipment will be provided for the same business. | 14 | 68 | 3,000,000.00 |
| 15 | Providing sewing machines to entrepreneurs and trained newcomers involved in garment manufacturing to develop their businesses and start new ventures | 15 | 32 | 5,000,000.00 |
| 16 | Providing toilet facilities to families who do not have access to toilet facilities and are unable to use them. | 16 | 20 | 5,000,000.00 |
| 17 | Construction of a toilet system for the Kumburulena Temple | 17 | 350 | 2,000,000.00 |
| 18 | Repairing the plumbing system at the Kumburu Lena Temple | 18 | 345 | 2,000,000.00 |
| 19 | Construction of a toilet system for the Warakawehera Catholic Church | 19 | 65 | 1,000,000.00 |
| 20 | Providing desks and chairs for Dhamma schools in Kumburulena | 20 | 250 | 1,000,000.00 |
| 21 | Providing necessary equipment for Muslim and Christian religious centers in Warakawehera | 21 | 65 | 2,000,000.00 |
| 22 | Developing the road to the Muslim mosque | 22 | 65 | 1,000,000.00 |
| 23 | Development of the by-pass road running near Navasa to Mahawela | 23 | 157 | 1,000,000.00 |
| 24 | Development of the road leading into the village via Eluwalanda Road | 24 | 243 | 2,000,000.00 |
| 25 | Development of the road starting near Mr. Dharmasena's house | 25 | 234 | 1,000,000.00 |
| 26 | Providing an electricity extension to Mr. Chandana Siriwardena's house | 26 | 6 | 2,000,000.00 |
| 27 | Development of Susantha Bakery Bypass Road | 27 | 35 | 2,000,000.00 |
| 28 | Development of the road starting from Yamin Palmy House and ending near Mr. Jayakody's house | 28 | 45 | 2,000,000.00 |
| 29 | Development of the road near the Grand City Hotel | 29 | 120 | 2,000,000.00 |
| 30 | Providing training opportunities related to coconut shell weaving and batik | 30 | 25 | 1,000,000.00 |
| 31 | Development of the side road running near Mr. Khalil's house | 31 | 50 | 1,000,000.00 |
| 32 | Development of the road from Mr. Chandraratne's house to Mr. Ranjath Liyanage's house | 32 | 35 | 1,000,000.00 |
| 33 | Development of the road from near Mrs. Achaliya's house | 33 | 68 | 2,000,000.00 |
| 34 | Development of the road from near the house of the Rev. | 34 | 97 | 1,000,000.00 |
| 35 | Development of the road from near Mr. Nawaz's house to Mr. Juanis's house | 35 | 47 | 1,000,000.00 |
| 36 | Development of the road from near Mr. Senaka's house to Kathakka | 36 | 53 | 1,000,000.00 |
| 37 | Development of the road from near Mr. Ruwan Wijeratne's house to Mr. Dhanapala's house | 37 | 67 | 1,000,000.00 |
| 38 | Development of the Swarnamali Wattha road running near Ridi Kekulu Pre-School up to Dedurumbaya; | 38 | 80 | 1,000,000.00 |
| 39 | Starting a sewing class | 39 | 40 | 1,000,000.00 |
| 40 | Implementing a welfare project targeting the youth community | 40 | 176 | 1,000,000.00 |
| 41 | Development of the road starting from near Mr. Ananda's house and running near Laimi | 41 | 45 | 1,000,000.00 |
| 42 | Construction of a toilet system for the Warakawehera Catholic Church | 42 | 67 | 500,000.00 |
| 43 | Application of protective barriers to prevent erosion for the Deduru River boundary | 43 | 54 | 50,000,000.00 |
| 44 | Providing agricultural advisory services to farmers | 44 | 85 | 500,000.00 |
| 45 | Construction of a cultivation pit for the Siyambalakumbura farm in Warakawehera | 45 | 86 | 5,000,000.00 |
| 46 | Constructing an anvil across the Bakmale Canal | 46 | 90 | 5,000,000.00 |
| 47 | Implementation of a water project from Eluwalanda to Dalukwatta | 47 | 135 | 100,000,000.00 |
| 48 | Clearing the land on both sides of the road leading from Warakawehera to Kelanthagama and providing it to young farmers under a tax system to cultivate coconuts | 48 | 45 | 10,000,000.00 |
| 49 | Providing existing wasteland to agricultural entrepreneurs on a cultivation basis | 49 | 34 | 10,000,000.00 |
| 50 | Providing 15 unemployed women with the necessary equipment for self-employment (sandwiches and sweets) that can be done at home | 50 | 75 | 1,000,000.00 |
| 51 | Providing necessary financial facilities for the development of entrepreneurs | 51 | 15 | 1,000,000.00 |
| 52 | Implementing a water project for the old village of Warakawehera | 52 | 425 | 50,000,000.00 |
560 - Reddagoda
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Construction of a maternity clinic building for the division | 4 | 500 | 3,000,000.00 |
| 2 | Construction of a Dhamma school building | 5 | 473 | 2,000,000.00 |
| 3 | Dairy farming and poultry farming | 6 | 30 | 1,000,000.00 |
| 4 | Providing 2 electric water pumps | 7 | 800 | 200,000.00 |
| 5 | Development of the Reddegoda Watta-Kohumola road | 8 | 80 | 1,000,000.00 |
| 6 | Providing necessary equipment for self-employment | 9 | 10 | 2,000,000.00 |
| 7 | Providing water treatment systems for 3 water projects | 10 | 800 | 150,000.00 |
| 8 | Construction of a weir from Waduwawela to Aradana weir via Galpottha Nawana | 9 | 200 | 1,500,000.00 |
| 9 | Construction of a playground for Ruddegoda village | 10 | 545 | 1,000,000.00 |
| 10 | Development of St. Anne's Christian Church | 11 | 95 | 500,000.00 |
| 11 | Construction of 15 sanitary toilets | 12 | 45 | 4,500,000.00 |
| 12 | Development of the Pallehoromibuwa toll road from the Delhi access road | 13 | 800 | 5,000,000.00 |
| 13 | Construction of the side wall of the Raddegoda Temple | 14 | 473 | 2,000,000.00 |
| 14 | Development of Reddegoda School Road | 15 | 400 | 1,000,000.00 |
| 15 | Development of Lower Reddegoda Community | 16 | 150 | 500,000.00 |
| 16 | Development of the Reddegodawatte Public Library | 17 | 545 | 500,000.00 |
| 17 | Construction of a side wall around the temple at Reddegoda Estate | 18 | 450 | 1,000,000.00 |
| 18 | Development of the temple road | 19 | 473 | 15,000,000.00 |
| 19 | Development of the cemetery road | 20 | 473 | 500,000.00 |
| 20 | Concreting of necessary areas of Kadewatta Road | 21 | 50 | 500,000.00 |
| 21 | Development of the road from near Mr. Dharmaraja's house upwards | 23 | 50 | 1,000,000.00 |
| 22 | Development of the Reddegoda Estate Playground | 24 | 545 | 1,000,000.00 |
| 23 | Development of the road from the entrance road to Mr. Wijeratne's house | 25 | 40 | 1,000,000.00 |
| 24 | Development of necessary areas on the Lower Reddegoda Road | 26 | 150 | 1,500,000.00 |
| 25 | Makul Alliya Road Development | 27 | 30 | 1,000,000.00 |
| 26 | Developing the necessary places on the public road | 28 | 95 | 500,000.00 |
| 27 | Development of the Kuora road in Kotu | 29 | 50 | 1,000,000.00 |
| 28 | Construction of 04 new houses | 30 | 473 | 4,000,000.00 |
| 29 | Development of necessary places for Ruddegoda Junior College | 31 | 50 | 1,000,000.00 |
| 30 | Development of Reddegoda Wattha Road | 32 | 550 | 1,000,000.00 |
| 31 | Development of the Kadewatte Second Lane Road | 33 | 35 | 1,000,000.00 |
| 32 | Development of the Kovilawatte roundabout in Reddegoda | 34 | 550 | 1,000,000.00 |
| 33 | Development of Walaviwa Hotel Road | 35 | 30 | 1,000,000.00 |
| 34 | Development of the Reddegoda Gallena Kanda Road | 36 | 25 | 1,000,000.00 |
561 - Palle Horombuwa
| 1 | Development of the main road from Pallehorombuwa to Pallayaya | 1 | 800 | 40,000,000.00 |
| 2 | Development of Pallelehorombuwa Colony roundabouts. | 2 | 400 | 10,000,000.00 |
| 3 | Development of Pallelehorombuwa Egodamulla Road. | 3 | 300 | 10,000,000.00 |
| 4 | Development of the Pihilla Mountain Road. | 4 | 500 | 8,000,000.00 |
| 5 | Remaining work on the Sunday school building. | 5 | 300 | 5,000,000.00 |
| 6 | Development of Pallehorombuwa Estate Road | 6 | 45 | 5,000,000.00 |
| 7 | Development of the colony cemetery. | 7 | 200 | 2,000,000.00 |
| 8 | Development of Kukurumahana Bypass Road. | 8 | 150 | 3,000,000.00 |
| 9 | Development of the road leading to the colony cemetery | 9 | 200 | 2,500,000.00 |
| 10 | Development of Devalagammedda Road | 10 | 200 | 4,000,000.00 |
| 11 | Construction of a flood-proof side wall for the main water project | 11 | 175 | 1,000,000.00 |
| 12 | Dunkalahena Road Development | 12 | 350 | 2,000,000.00 |
| 13 | Pallehorombuwa Talagahakotuwa Alaveli arrangement | 13 | 100 | 2,000,000.00 |
| 14 | Development of the Pallehorombuwa-Talaghahakotuwa paddy field road | 14 | 100 | 2,500,000.00 |
| 15 | Sidewall preparation for the drinking water project | 15 | 175 | 1,000,000.00 |
| 16 | Development of the road leading to the Jambugahamula rice fields | 16 | 100 | 3,000,000.00 |
| 17 | Concreting the village road | 17 | 35 | 6,000,000.00 |
| 18 | Development of the Pallehorombuwa Pahalwela road | 18 | 100 | 1,000,000.00 |
| 19 | Development of the initial culvert on the Ranaviru Road | 19 | 50 | 1,000,000.00 |
| 20 | Expansion of mushroom cultivation. | 20 | 5 | 500,000.00 |
| 21 | Improving animal husbandry (goat husbandry) | 21 | 8 | 500,000.00 |
562 - Ginihiriya
| 1 | Development of the road starting from near the Buddha Temple on the Pahalwela road, along the side wall near Mr. Jayasinghe's shop, up to Mr. Gunathilaka's house in Pallehorombuwa and up to the Narangaha Ela paddy field. | 1 | 300 | 5,000,000.00 |
| 2 | Development of the road from near the Juliana bend in Ginihiriya to near the temple | 2 | 75 | 2,000,000.00 |
| 3 | Development of Mutthettuaya Samagi Mawatha with two embankments and a culvert | 3 | 80 | 3,000,000.00 |
| 4 | The road from the Pahalawela Water Project site to the Ale Kade shop has been developed with box culverts. | 4 | 300 | 5,000,000.00 |
| 5 | Expansion of cinnamon/betel nut/pepper cultivation for understory cultivation. | 5 | 10 | 1,000,000.00 |
| 6 | Development of 70 meters of the road from near Mr. Peiris' house to Kalahotuwawa Wela. | 6 | 20 | 1,800,000.00 |
| 7 | Concreting of 200 meters of the road leading to the Ginihiriya Cemetery with a culvert | 7 | 1294 | 4,000,000.00 |
| 8 | Renovation of the crumbling cloud wall around the pagoda of the Ginihiriya Temple. | 8 | 1294 | 1,000,000.00 |
| 9 | Development of the road with a bridge from near Ginihiriya Temple to the main road near Pallaya School | 9 | 150 | 4,000,000.00 |
| 10 | 200 meters of Mutthettuaya Devalaya road developed in Kirimba | 10 | 45 | 4,000,000.00 |
| 11 | Carrying out the necessary work to implement a water project for the village of Ginihiriya | 11 | 200 | 4,000,000.00 |
| 12 | Construction of a stock tank for the Pahalwela Water Project | 12 | 250 | 2,000,000.00 |
| 13 | Construction of a side embankment near Atamba Gaha on the road from Mutthettuaya to Dambaraya and construction of a side embankment on the road from Galgoda peak to Pol Kotuwa | 13 | 200 | 2,000,000.00 |
| 14 | Renovation of the Pahalwela Anvil with planking | 14 | 150 | 1,000,000.00 |
| 15 | Improvement of the Mutthettuaya Water Project | 15 | 200 | 3,000,000.00 |
| 16 | Development of 200 meters of the road leading up from Mr. Jagath's house | 16 | 160 | 3,500,000.00 |
| 17 | Renovation of the Mutthettuaya Galkathewa Anumana sidewall dam with new planks | 17 | 150 | 2,000,000.00 |
| 18 | Development of 150 meters of the road running near Mrs. Dabarayaya Pohodi's house with a culvert | 19 | 200 | 3,000,000.00 |
| 19 | Expansion of mushroom cultivation. | 20 | 6 | 1,200,000.00 |
| 20 | Development of a box culvert for the road that descends near the house of Mrs. Dabaraya Kanthi | 21 | 50 | 3,000,000.00 |
| 21 | Installation of necessary street lights to cover all villages in the domain | 22 | 1294 | 500,000.00 |
| 22 | Renovation of the Talahotuwawa anvil. | 23 | 150 | 2,000,000.00 |
| 23 | Construction of a service pavilion. | 24 | 1294 | 5,000,000.00 |
563 - Palleyaya
| 1 | The road from near the house of Dharmawansa Maya to Kahahena via the Pallekahahena fort | 1 | 300 | 10,000,000.00 |
| 2 | The road from Dabaraya water tank to Mr. Nimal's house via Kapuru Kaduwa | 2 | 150 | 5,000,000.00 |
| 3 | Development from near the house of Palalayaya Ranasinghe onwards | 3 | 150 | 4,000,000.00 |
| 4 | Development of the road from near Mr. Nimal's shop to Abhinavaramaya | 4 | 40 | 3,000,000.00 |
| 5 | Development of the road from near Mrs. Ramani's house to Kapuru Kaduwa via Themukolamada | 5 | 40 | 5,000,000.00 |
| 6 | Development of the Kapuru Kaduwa road from near Amarasooriya Maya's house to Tissa Maya's house in the required places | 6 | 35 | 3,000,000.00 |
| 7 | Development of the road from near Thilakaratne's shop to Keselwatte | 7 | 50 | 5,000,000.00 |
| 8 | Development of the road from near Mr. Milton's house in Pallaya to Mr. Gunathilaka's house | 8 | 20 | 3,000,000.00 |
| 9 | Development of the Pallehorombuwa road from near Palleyaya School | 9 | 130 | 5,000,000.00 |
| 10 | Development of the road leading to the canal near the Bodhi tree | 10 | 10 | 1,000,000.00 |
| 11 | Development of the inlet and dam leading to the Bogahamula paddy field | 11 | 20 | 2,500,000.00 |
| 12 | Construction of the Dhamma School building at Sri Bodhirukkharama Viharaya | 13 | 175 | 9,500,000.00 |
| 13 | Repair of the anvil in the Palleya area | 14 | 22 | 2,500,000.00 |
| 14 | Development of the road from near the stone quarry to Ranjith's house | 15 | 6 | 2,000,000.00 |
| 15 | Making dishes using leaves | 16 | 8 | 500,000.00 |
| 16 | Mushroom cultivation | 17 | 8 | 1,000,000.00 |
| 17 | Dairy farming | 18 | 2 | 2,000,000.00 |
| 18 | Development of side roads and access roads at necessary locations of Sri Vidyaraja Maha Vidyalaya | 19 | 850 | 5,000,000.00 |
| 19 | Repairing the school's water supply line | 20 | 850 | 100,000.00 |
| 20 | Commencing a water project covering the Pallaya division | 21 | 180 | 5,000,000.00 |
564 - Kahahena
| 1 | Construction of a communication tower | 1 | 500 | 50,000,000.00 |
| 2 | Renovation of the dilapidated bridge near Mr. Edirisinghe's house on the Kahahena-Unalegahella road | 2 | 150 | 4,000,000.00 |
| 3 | Development of the necessary places on the Medagodella road from the Kahahena junction to Eriyagolla | 3 | 150 | 7,500,000.00 |
| 4 | Developing existing cinnamon lands and initiating new ones | 4 | 275 | 2,500,000.00 |
| 5 | Construction of 4 new houses | 5 | 4 | 2,500,000.00 |
| 6 | Providing toilets for families without toilets | 6 | 7 | 1,400,000.00 |
| 7 | Developing a program to minimize animal damage to crops | 7 | 150 | 600,000.00 |
| 8 | Developing a suitable program to prepare post-harvest export crops and present them to the market | 8 | 237 | 2,500,000.00 |
| 9 | Development of the Ridikanda Senasana Forest Road from Keselwatte Bridge | 9 | 65 | 5,000,000.00 |
| 10 | Development of the Dehigashinna road from Matale border to Mr. Jayawardena's house | 10 | 10 | 2,500,000.00 |
| 11 | Development of Keselwatte Road from near Mr. Lasanna's shop to Mr. Saman's house | 10 | 65 | 5,000,000.00 |
| 12 | Development of Keselwatte Road from near Mr. Lasanna's shop to Mr. Saman's house | 11 | 65 | 5,000,000.00 |
| 13 | Renovation of the building for the new start of the weaving center | 12 | 230 | 2,000,000.00 |
| 14 | Development of the necessary areas of the gravel road from the Unalegahala junction to Dehigashinna | 13 | 150 | 5,000,000.00 |
| 15 | Obtaining a larger capacity electric motor for the Keselwatte Drinking Water Project | 14 | 65 | 500,000.00 |
| 16 | Development of the Mahayaya Road from near Mr. Jayawardena's house | 15 | 75 | 5,000,000.00 |
| 17 | Development of the road leading from near Mr. Cyril's house to Egodaha house | 16 | 30 | 5,000,000.00 |
| 18 | Planting of trees on both sides of the canal and the secondary canal in the division | 17 | 275 | 500,000.00 |
| 19 | Mahayaya Drinking Water Project Well Development | 18 | 75 | 2,000,000.00 |
| 20 | Development of the Pahala Aswedduma Paddy Field Bypass Road near Mr. Kumara's house | 19 | 15 | 2,000,000.00 |
| 21 | Development of the agricultural road from the beginning of Mr. Manel's estate to the Yatawatta road boundary | 20 | 15 | 2,000,000.00 |
| 22 | Preparing the anvil, ridge, and side wall of the cultivated field | 21 | 20 | 2,000,000.00 |
| 23 | Development of the agricultural road from Medagodella to Galpihilla paddy fields | 22 | 10 | 2,500,000.00 |
565 - Udahorombuwa
| 1 | Development of the Udahorombuwa village-centre road | 1 | 300 | 4,000,000.00 |
| 2 | Development of the Welikanda road from near Mr. Upali's house | 2 | 200 | 5,000,000.00 |
| 3 | Development of Welikanda roundabout | 3 | 150 | 5,500,000.00 |
| 4 | Development of the road from near Puhulidha to the house of Mr. B. G. Jayaweera | 4 | 75 | 3,000,000.00 |
| 5 | Development of the road from near the temple to Urathota well | 5 | 105 | 3,500,000.00 |
| 6 | Carpeting from near Udahorombuwa School to the main carpet road of Welikanda Roundabout | 6 | 150 | 10,000,000.00 |
| 7 | Getting a signal tower | 7 | 630 | 50,000,000.00 |
| 8 | Development of the Thalambugahagoda well | 8 | 150 | 1,500,000.00 |
| 9 | Development of Malwatte Road | 9 | 63 | 3,500,000.00 |
| 10 | Acquiring land from Delhena Estate and constructing a playground | 10 | 75 | 3,000,000.00 |
| 11 | Development of the Udahoro Mbuwa School playground | 11 | 55 | 1,500,000.00 |
| 12 | Obtaining a pumping system and motor for the water project | 12 | 450 | 1,200,000.00 |
| 13 | Development of the road from Thelambugahagoda to Mr. Ranji's house | 13 | 25 | 1,500,000.00 |
| 14 | Construction of canal dams | 14 | 25 | 2,000,000.00 |
| 15 | Providing agricultural equipment to the farmers' organization | 15 | 25 | 1,500,000.00 |
| 16 | Development of the road to the mountain courtyard shrine | 16 | 250 | 3,000,000.00 |
| 17 | Obtaining a water supply to the mountain courtyard shrine | 17 | 250 | 2,000,000.00 |
| 18 | Obtaining a Dhamma Hall and a toilet system for the Kandeh Maluwa Puja site | 18 | 250 | 5,000,000.00 |
| 19 | Development of the remaining works of the Dhamma School building | 19 | 80 | 2,000,000.00 |
| 20 | Providing a solar system to the temple | 20 | 300 | 15,000,000.00 |
| 21 | Development of the Habawatta road from near the Bodhi tree | 21 | 45 | 2,000,000.00 |
| 22 | Renovation of the Jana Sabha Office | 22 | 800 | 500,000.00 |
| 23 | Development of the road from Carpet Road to Mr. Nda Sinha's house | 23 | 65 | 3,000,000.00 |
| 24 | Development of Urumi Madittha Road | 24 | 15 | 20,000,000.00 |
| 25 | Development of the road from the upper part of the Ginihapuwa road to the house of Kanthi Miyya by installing a culvert | 25 | 30 | 3,000,000.00 |
| 26 | Development of the road from the community water well to the mountain courtyard | 26 | 25 | 2,000,000.00 |
| 27 | Development of the road from Welikanda Road to the house of Mr. Nihal Nanda Kumara | 27 | 10 | 1,500,000.00 |
| 28 | Building a clothing industry for women | 28 | 10 | 2,500,000.00 |
| 29 | Providing toilet facilities for 3 low-income families | 29 | 12 | 6,000,000.00 |
566 - Goraka Ela
| 1 | Construction of the bridge on Temple Road | 1 | 210 | 5,000,000.00 |
| 2 | Paving the road from Gorakaela Junction to Tuththiripitiya | 2 | 350 | 20,000,000.00 |
| 3 | Development of the road from near Gorakaela Temple to Mr. Wijeratne's house | 3 | 55 | 3,000,000.00 |
| 4 | Development of the Tuththiripitiya road via Galpaya Dehigashinna | 4 | 232 | 8,000,000.00 |
| 5 | Construction of a communication tower | 5 | 506 | 50,000,000.00 |
| 6 | Construction of Liyangahamula Dam | 6 | 12 | 2,500,000.00 |
| 7 | Implementing a drinking water project in the district | 7 | 370 | 5,000,000.00 |
| 8 | Development of the road from near Amarasinghe's house to Gunadeva's house on the temple road where necessary | 8 | 206 | 3,000,000.00 |
| 9 | Remediation of wildlife damage | 9 | 345 | 2,000,000.00 |
| 10 | Construction of the official shadow office | 10 | 492 | 1,000,000.00 |
| 11 | Construction of a drinking water project for the Dehigashinna and Galpaya areas | 11 | 221 | 5,000,000.00 |
| 12 | Construction of a community hall for Galpaya village | 12 | 21 | 1,000,000.00 |
| 13 | Development of the road through the village from near the house of Ashoka Maya in Dehigashinna | 13 | 122 | 2,500,000.00 |
| 14 | Construction of a Dhamma school building at Gorakaela Temple and procurement of equipment for the Dhamma school | 14 | 56 | 1,200,000.00 |
| 15 | Construction of a side wall around the temple | 15 | 210 | 3,000,000.00 |
| 16 | Construction of a public toilet for the monastery | 16 | 210 | 200,000.00 |
| 17 | Land clearing and construction of a playground | 17 | 45 | 150,000.00 |
| 18 | Development of the Kaluwala Amunei homestead | 18 | 12 | 2,000,000.00 |
| 19 | Building a bridge over the Kalawala | 19 | 210 | 5,000,000.00 |
| 20 | Building a small clothing store for women | 20 | 15 | 2,000,000.00 |
| 21 | Promotion of minor export crops | 21 | 75 | 200,000.00 |
| 22 | Development of the Kendagolla Road from near Hemachandra Maya's house | 22 | 15 | 2,000,000.00 |
| 23 | Developing the Kithul industry | 23 | 12 | 100,000.00 |
| 24 | Expanding dairy farming | 24 | 4 | 500,000.00 |
| 25 | Chicken control | 25 | 13 | 400,000.00 |
567 - Kiribathgalla
| 1 | Carpeting of Kandegama main road from Gorakaela to Tuththiripitiya | 1 | 260 | 30,000,000.00 |
| 2 | Development using embankments from Kiribathgalle to Rupp | 2 | 80 | 2,000,000.00 |
| 3 | Completion of the remaining work on the Kandegama Dhamma School building | 3 | 90 | 2,000,000.00 |
| 4 | Construction of a new building for the school's classrooms | 4 | 165 | 3,000,000.00 |
| 5 | Development of the Halgolla road from near the bus station | 5 | 200 | 2,000,000.00 |
| 6 | Construction of a public building | 6 | 300 | 3,000,000.00 |
| 7 | Obtaining land for a public cemetery in Kandegama | 7 | 300 | |
| 8 | Development from near Kiribathgalle Temple to the cemetery | 8 | 70 | 9,000,000.00 |
| 9 | Repair of the roof of the Dhamma School building at Kiribathgalle Temple | 9 | 150 | 500,000.00 |
| 10 | Carpeting of the Delwita road from near the bus stand to Egodamulla | 10 | 110 | 6,000,000.00 |
| 11 | Construction of a bridge to the Upper Halgolla River | 11 | 30 | 15,000,000.00 |
| 12 | Road development from near Mr. Wijesinghe's house to Mr. Manjula's house | 12 | 55 | 3,500,000.00 |
| 13 | Development of the road from near the school to the Egodamulla Rambukahena Cemetery | 13 | 75 | 4,000,000.00 |
| 14 | Development of the road from near Mr. Premaratne's shop to Palagala | 14 | 25 | 3,500,000.00 |
| 15 | Development of the road from Batuhena bend to Pallekanda Cemetery | 15 | 70 | 3,000,000.00 |
| 16 | Getting a computer room for the school | 16 | 165 | 8,000,000.00 |
| 17 | Constructing a playground for the school and obtaining sports equipment | 17 | 165 | 1,000,000.00 |
| 18 | Construction of a teacher's lounge for the school | 18 | 25 | 2,500,000.00 |
| 19 | Development of Polwatta Road from near Ariyawansa's shop in Kande | 19 | 35 | 5,000,000.00 |
| 20 | Development of the Rupp to Pallekanda road | 20 | 30 | 2,000,000.00 |
| 21 | Developing the existing playground at the school | 21 | 165 | 1,000,000.00 |
| 22 | The development of the Kithul industry | 22 | 15 | 750,000.00 |
| 23 | Obtaining a drinking water project for Kandegama | 23 | 110 | 5,000,000.00 |
| 24 | Construction of paddy fields and dams in the field | 24 | 75 | 3,000,000.00 |
| 25 | Improving cockroach control and obtaining credit facilities | 25 | 1 | 100,000.00 |
| 26 | Empowering small entrepreneurs | 26 | 10 | 1,000,000.00 |
| 27 | Providing loan facilities to the self-employed | 27 | 6 | 300,000.00 |
568 - Pallekanda
| 1 | Obtaining a water treatment plant for the Pallekanda Community Organization | 1 | 450 | 7,000,000.00 |
| 2 | Development of Garadigala Henyaya Road | 2 | 100 | 2,000,000.00 |
| 3 | Starting a self-employment project related to coir | 3 | 30 | 3,000,000.00 |
| 4 | Cinnamon cultivation | 4 | 20 | 1,000,000.00 |
| 5 | Providing financial assistance to confectionery production beneficiaries | 5 | 10 | 1,500,000.00 |
| 6 | Development of the road from near the temple to Rupp | 6 | 200 | 4,000,000.00 |
| 7 | Development of the Vel Eriyagolla Road near the Pallekanda Transformer | 7 | 200 | 3,000,000.00 |
| 8 | Taking action to prevent landslides in Pallayaya, Gamgodella | 8 | 43 | 500,000.00 |
| 9 | Renovation of the community hall building | 9 | 830 | 1,000,000.00 |
| 10 | Construction of the Seva Piyasa building | 10 | 830 | 2,500,000.00 |
| 11 | Concreting the necessary areas of the Siyambala Ella main interchange | 11 | 300 | 1,500,000.00 |
| 12 | Construction of a side wall around the playground | 12 | 250 | 3,000,000.00 |
| 13 | Construction of the side wall near the Bodhi tree at the Pallekanda Temple | 13 | 350 | 4,000,000.00 |
| 14 | Concreting the necessary areas on the Garadigala-Gamameda road | 14 | 80 | 3,000,000.00 |
| 15 | Concreting the coconut pickling road from near Mr. Susil's shop | 15 | 150 | 2,000,000.00 |
| 16 | Implementation of a drinking water project for the Pallekanda village building | 16 | 250 | 4,000,000.00 |
| 17 | Development of Siyambalaella Cemetery Road with a milking parlor | 17 | 350 | 3,000,000.00 |
| 18 | Cutting and developing the road from near the canal in front of Mr. S.G. Baba's house to Ruppa | 18 | 30 | 2,000,000.00 |
| 19 | Cutting and developing the road from Siyambala Ella to Ihalagama Oya | 19 | 70 | 1,000,000.00 |
| 20 | Concreting the necessary areas on the road in the middle of Hurigolla village | 20 | 150 | 2,000,000.00 |
| 21 | Obtaining electricity for the Pallekanda Samiti Hall and completing the remaining work | 21 | 200 | 2,000,000.00 |
| 22 | Development of the road near Mr. Thilakaratne's house in Siyambalaella | 22 | 50 | 1,500,000.00 |
| 23 | Construction of the Kumburukotuwa Amufan Dam | 23 | 150 | 3,000,000.00 |
| 24 | Construction of a drinking water project in Hurigolla | 24 | 100 | 5,000,000.00 |
| 25 | Development of the road from near Mr. Chandraweera's house on the Siyambalaella village road | 25 | 50 | 1,000,000.00 |
| 26 | Development of the road from near Mr. Shantha Ariyaratne's shop onwards | 26 | 20 | 1,000,000.00 |
| 27 | Development of the village road from near Mr. Jayawickrama's house | 27 | 25 | 2,000,000.00 |
| 28 | Development of Siyambalaella village road up to Waldeniya paddy field | 28 | 70 | 1,000,000.00 |
| 29 | Starting an animal husbandry project | 29 | 10 | 1,000,000.00 |
569 - Delvita
| 1 | Development of the necessary areas from the beginning to the end of the Heepitiya Dam belonging to the Heepitiya paddy fields that were affected | 1 | 60 | 5,000,000.00 |
| 2 | Development of the landslide areas on the road from near Mr. Kagara's house to the Eriyagolla S bend and the necessary areas from near Mrs. Indrani Adadenna's house towards Delwita division | 2 | 160 | 7,500,000.00 |
| 3 | Development of the road leading to Kalugahatenna via Siyambalagahamula Si Temple in Pahalagama by building a bridge over the river | 3 | 250 | 6,000,000.00 |
| 4 | Renovation of the Dalupotha Anvil and Dam in the required areas | 4 | 25 | 3,000,000.00 |
| 5 | Development of the Garadigala-Henyaya road | 5 | 30 | 1,000,000.00 |
| 6 | Construction of the side wall near Mr. GG Somadeva's house on the Kiribathgalle main road | 6 | 30 | 1,500,000.00 |
| 7 | Development of the road from near the house of Mr. Thilakaratne, Siyambalella, to the Samiti Hall | 7 | 75 | 1,500,000.00 |
| 8 | Development of a 10-acre public pond | 8 | 10 | 500,000.00 |
| 9 | Development of the necessary places on the Waldeniya road from Banda's house near Delwita Hospital | 9 | 15 | 500,000.00 |
| 10 | Construction of a side wall near Mrs. Thilaka Menike's house on the Garadigala Henyaya Road | 10 | 30 | 500,000.00 |
| 11 | Completion of remaining work on Malmiwala Society Hall | 11 | 50 | 1,000,000.00 |
| 12 | Development of necessary areas on the Munkotuwa road from near Mr. Samipath's house | 12 | 65 | 2,000,000.00 |
| 13 | Development of the Waldeniya Siyambalella village road | 13 | 15 | 500,000.00 |
| 14 | Development of necessary areas from near Samupakaraya to Siyaolella village road to Kiribathgalla road | 14 | 200 | 1,000,000.00 |
| 15 | Construction of new anvil and well for Sapugaslanda Kuoruyaya | 15 | 60 | 1,500,000.00 |
| 16 | Development of the Guradigala village median road | 16 | 30 | 1,000,000.00 |
| 17 | Development from near Mr. Hurigolla Ariyapala's house to Siripatula | 17 | 50 | 2,000,000.00 |
| 18 | Construction of a wall behind a public building | 18 | 150 | 2,000,000.00 |
| 19 | Development of the required areas of Angami Pitiya Dam | 19 | 56 | 2,500,000.00 |
| 20 | Construction of a footbridge across Malmiwala Oya on the Dunumawa main road | 20 | 21 | 500,000.00 |
| 21 | Construction of a public toilet in Delwita City | 21 | 250 | 2,000,000.00 |
| 22 | Construction of a security fence near the Dolosmahe Canal | 22 | 250 | 1,000,000.00 |
| 23 | Renovating the village rice fields | 23 | 75 | 2,000,000.00 |
| 24 | Construction of a side wall near the house of Mr. NWG Ananda Vijith Asoka | 24 | 252 | 2,000,000.00 |
| 25 | Construction of a dharma hall for the Hurigolla Siripatula Temple | 25 | 55 | 2,000,000.00 |
| 26 | Establishing garment factories to provide employment opportunities | 26 | 600 | 5,000,000.00 |
| 27 | Regularization of garbage disposal in the Delwita area | 27 | 30 | 500,000.00 |
| 28 | Delwita Hospital's Emergency Unit Expanded | 28 | 500 | 1,000,000.00 |
| 29 | Promoting gardening | 29 | 6 | 300,000.00 |
| 30 | Development of necessary areas on the road leading to Gami Uda from near the cooperative | 30 | 30 | 500,000.00 |
| 31 | Obtaining water for paddy fields from the well near Mr. Chaturanga's house | 31 | 35 | 500,000.00 |
| 32 | Construction of toilet system at Delwita Temple | 32 | 260 | 1,000,000.00 |
| 33 | Construction of the upper floor of the water pumping station | 33 | 267 | 2,000,000.00 |
| 34 | Promotion of cinnamon cultivation | 34 | 5 | 500,000.00 |
| 35 | Promoting the carpentry industry | 35 | 5 | 1,000,000.00 |
| 36 | Kirigawa control | 36 | 5 | 800,000.00 |
| 37 | Promotion of coir-based products | 37 | 1,000,000.00 | |
| 38 | Delwita Hospital's Emergency Unit Expanded | 38 | 500 | 500,000.00 |
| 39 | Developing agriculture | 39 | 10 | 500,000.00 |
| 40 | The sidewall of the Delvita College playground has been repaired. | 40 | 350 | 1,000,000.00 |
| 41 | Infrastructure development at Delwita School | 41 | 350 | 1,000,000.00 |
| 42 | Providing subject-related facilities at Delvita Vidyalaya | 42 | 350 | 1,000,000.00 |
570 - Kithulwala
| 1 | Development of the road from Jankure Junction to Kitulwala Lake. | 1 | 250 | 10,000,000.00 |
| 2 | Implementation of a Delhena Wattha drinking water project | 2 | 150 | 1,000,000.00 |
| 3 | Construction of Kuda Oya Bridge on Pinnagolla Morapanda Road | 3 | 250 | 7,000,000.00 |
| 4 | Development of the road from Kitulwala to Mapanwila Kuuru Yaya Haraya Cemetery | 4 | 100 | 5,000,000.00 |
| 5 | Construction of the Manpanwila Anvil in Kithulwala | 5 | 100 | 2,000,000.00 |
| 6 | Development of Welikanda Upper Road from Kuthulwala Welikanda Road | 6 | 40 | 6,000,000.00 |
| 7 | Development of the road from Kitulwala to the hot springs | 7 | 70 | 6,000,000.00 |
| 8 | Construction of anvil in Kithulwala | 8 | 150 | 3,000,000.00 |
| 9 | Reconstruction of the waterway from Welibora Dam to the lower paddy fields | 9 | 150 | 2,000,000.00 |
| 10 | Raising animal husbandry | 10 | 10 | 2,000,000.00 |
| 11 | Renovation of Kitulwala Tank and Tuththiri Fort Dam | 11 | 150 | 2,500,000.00 |
| 12 | Obtaining equipment required for the production of finished garments and bags | 12 | 10 | 1,000,000.00 |
| 13 | Renovation of the Kitulwala Tank and Wilkumbura Tank | 13 | 200 | 7,000,000.00 |
| 14 | Freshwater fish farming in the Kithulwala Lake | 14 | 85 | 500,000.00 |
| 15 | Expansion of banana cultivation | 15 | 15 | 500,000.00 |
| 16 | Construction of a community hall in Kitulwala | 16 | 100 | 2,000,000.00 |
| 17 | Development of necessary places on Pinnagolla Road | 17 | 250 | 7,000,000.00 |
| 18 | Improvement of the road from Muwandeniyahandiya to Pinnagolla with the Delhenwatte River | 18 | 150 | 5,000,000.00 |
| 19 | Construction of the side wall of the Delhenwatte Muthukumari Amman Kovil | 19 | 160 | 1,000,000.00 |
571 - Jankure
| 1 | Development of the road from Samagi Mawatha to Deduru Mbaya where necessary | 1 | 324 | 3,000,000.00 |
| 2 | Development of necessary areas on the main road from Pettimaduwa to Deduru Mawaya | 2 | 324 | 4,000,000.00 |
| 3 | Development of the road from Delwita main road to Muwandeniya | 3 | 324 | 4,000,000.00 |
| 4 | Development of the road from near the temple to the tube well | 4 | 324 | 1,000,000.00 |
| 5 | Development of the agricultural road from near Mr. Weda's house to Kongaha | 5 | 324 | 1,000,000.00 |
| 6 | Construction of Nimmal Lake | 6 | 150 | 3,000,000.00 |
| 7 | Raising dairy cattle | 7 | 5 | 1,500,000.00 |
| 8 | Development of the side road from near Kithsirimaya's house to the pond paddy field | 8 | 324 | 2,000,000.00 |
| 9 | Cultivation of vegetables in safe houses | 9 | 12 | 1,500,000.00 |
| 10 | Food dehydration technology is being developed | 10 | 5 | 1,000,000.00 |
| 11 | The development of the carpentry industry | 11 | 5 | 100,000.00 |
| 12 | Construction of a service building | 12 | 324 | 1,500,000.00 |
| 13 | Mushroom cultivation | 13 | 5 | 1,000,000.00 |
| 14 | Construction of a tourist zone around the Bodhimala Temple and Vishnu Temple | 14 | 324 | 2,000,000.00 |
| 15 | Building a preschool | 15 | 324 | 1,500,000.00 |
| 16 | Cultivation of Kumbuk plants in the Welikanda Reserve | 16 | 324 | 100,000.00 |
| 17 | Construction of a toilet system at the Bodhimalu Temple in Jankure | 17 | 324 | 1,500,000.00 |
| 18 | Development of the agricultural road from Pethamaga to Ambagaha field | 18 | 324 | 1,000,000.00 |
| 19 | Development of the side road from near Mr. Kissiri's house to the pond paddy field | 19 | 324 | 1,000,000.00 |
| 20 | Development of the path around the temple | 20 | 324 | 1,500,000.00 |
572 - Dunumawa
| 1 | Development of the Dunumawa main road damaged by the disaster | 1 | 800 | 80,000,000.00 |
| 2 | Reconstruction of the building used as the Dunumawa Community Hall, Dharma School and Dharma Hall, which was completely destroyed due to the disaster | 2 | 550 | 5,000,000.00 |
| 3 | Development of the road to Mirissala via the disaster-damaged Eriyagolla Road | 3 | 800 | 50,000,000.00 |
| 4 | Construction of a footpath from Parawatte to Kotikunuga, which was damaged by the disaster, near Mr. Pubudu's land. | 4 | 75 | 1,000,000.00 |
| 5 | Development of the disaster-damaged Dunumava Siridhamma Visuddharama Temple | 5 | 550 | 5,000,000.00 |
| 6 | Development of the disaster-damaged Dunumawa Old Stone Temple | 6 | 550 | 5,000,000.00 |
| 7 | SLTB bus to Ankumbura via Ridigama, Delwita and Dunumawa | 7 | 1000 | |
| 8 | Construction of the Gallanawatte Road Bridge | 8 | 200 | 10,000,000.00 |
| 9 | Construction of a communication tower | 9 | 450 | 20,000,000.00 |
| 10 | Construction of a multi-storey building | 10 | 450 | 10,000,000.00 |
| 11 | Side wall construction near Mr. Siriwardena's land on the Dunumawa Grant Road | 11 | 450 | 5,000,000.00 |
| 12 | Clearing and developing the road from the bend near Bilingaha to Maha Aramba | 12 | 100 | 8,000,000.00 |
| 13 | Development of the Dunumawa-Heenakanda road | 13 | 200 | 20,000,000.00 |
| 14 | Clearing and developing the Gallanawatte Road | 14 | 200 | 10,000,000.00 |
| 15 | Providing resources and equipment for self-employment | 15 | 50 | 4,000,000.00 |
| 16 | Providing assistance and equipment for ongoing self-employment | 16 | 60 | 8,000,000.00 |
| 17 | Construction of a new transformer in the Heenathenna section | 17 | 200 | 20,000,000.00 |
| 18 | Providing housing for low-income earners | 18 | 5 | 10,000,000.00 |
| 19 | Construction of a spice-related product assembly center | 19 | 450 | 10,000,000.00 |
| 20 | Extension of the Mahaweli Water Project to Dunumawa | 20 | 450 | 20,000,000.00 |
| 21 | Development of the new city road | 21 | 200 | 10,000,000.00 |
| 22 | Providing air rifles to repel wild animals | 22 | 8 | 400,000.00 |
| 23 | Development of Heenanthena Society Hall | 23 | 200 | 2,000,000.00 |
| 24 | Providing toilets for low-income earners | 24 | 8 | 4,000,000.00 |
| 25 | Referring young people for NVQ training | 25 | 20 | 1,000,000.00 |
| 26 | Providing land deeds to those who do not have land deeds | 26 | 50 | 100,000.00 |
| 27 | Providing training for cinnamon crushers | 27 | 30 | 150,000.00 |
| 28 | Planting Kumbuk trees on both sides of Dunumawa River and on both sides of Polkatuela | 28 | 450 | 50,000.00 |
| 29 | Providing more than 100 RIR type chickens | 29 | 2 | 200,000.00 |
| 30 | Providing bee boxes for beekeeping | 30 | 15 | 100,000.00 |
573 - Kithulgolla
| 1 | Development of necessary areas on the Kitulgolla main road damaged by landslides (with side walls) | 1 | 1500 | 10,000,000.00 |
| 2 | Implementing a drinking water project for the district | 2 | 440 | 5,000,000.00 |
| 3 | Construction of a new bridge for the Kitulgolla Dikhena Stairway | 3 | 500 | 5,000,000.00 |
| 4 | Completion of the remaining work on the playground under construction | 4 | 450 | 4,000,000.00 |
| 5 | Construction of a new temple for the division, formalization of religious education | 5 | 440 | 8,000,000.00 |
| 6 | Getting a bus for public transportation to Ankumbura via Kitulgolla | 6 | 50 | 2,000,000.00 |
| 7 | Stone-pelting from the entrance to the hall of Dunumawa Primary School | 7 | 440 | 4,000,000.00 |
| 8 | Construction of an international preschool for the Kitulgolla division | 8 | 440 | 5,000,000.00 |
| 9 | Providing housing facilities to families living in vulnerable areas | 9 | 120 | 10,000,000.00 |
| 10 | Installation of street lamps at required locations on both sides of the Kitulgolla main road | 10 | 440 | 4,000,000.00 |
| 11 | Development of the public cemetery | 11 | 440 | 3,000,000.00 |
| 12 | Completing the remaining work at the house of Mr. S.G. Premaratne, a low-income family | 12 | 5 | 5,000,000.00 |
| 13 | Kali Farm Poultry Farm Development | 13 | 250 | 300,000.00 |
| 14 | Development of the road section belonging to Kitulgolla division on the Riyagolla-Mirissala road | 14 | 800 | 6,000,000.00 |
| 15 | Providing a small export crop drying machine to Mr. Ishara Chathuranga Abeythilaka | 15 | 200 | 500,000.00 |
| 16 | Creating new self-employment opportunities for the people of the region | 16 | 150 | 200,000.00 |
| 17 | Development of the road from near Mr. Karunapala's house to Kalugahathenna | 17 | 50 | 8,000,000.00 |
| 18 | Development of communication facilities and provision of solar power facilities for the region | 18 | 500 | 2,000,000.00 |
| 19 | Construction of an official shadow office for government officials | 19 | 440 | 4,000,000.00 |
| 20 | Providing necessary equipment for the existing clinic center in the domain | 20 | 200 | |
| 21 | Providing toilet facilities to families who do not have toilet facilities in the division | 21 | 15 | 3,000,000.00 |
| 22 | Implementing advisory services on attitude development for the community | 22 | 440 | 20,000.00 |
| 23 | Construction of a teachers' lounge for Dunumawa Primary School | 23 | 440 | 2,000,000.00 |
| 24 | Development of the Eriyagolla Rotupihilla Agricultural Road | 24 | 200 | 8,000,000.00 |
| 25 | Taking appropriate measures to prevent wildlife damage | 25 | 440 | 500,000.00 |
| 26 | Construction of a new road from Kitulgolla to Eriyagolla via Dikhena | 26 | 500 | 8,000,000.00 |
574 - Bambaragahakanda
| 1 | Development of the road from Bambaragagahakanda to Dunumawa | 1 | 400 | 3,000,000.00 |
| 2 | Obtaining a drinking water project for the currently constructed Gedarawela school | 2 | 300 | 5,000,000.00 |
| 3 | Develop the road to the cemetery and construct a building at the cemetery. | 3 | 620 | 2,000,000.00 |
| 4 | ||||
| 5 | Arrangement of drainage system on the main road | 4 | 500 | 2,000,000.00 |
| 6 | Providing electricity to the Bambara Gahakanda Community Hall | 5 | 400 | 150,000.00 |
| 7 | Construction of a communication tower | 6 | 2000 | 5,000,000.00 |
| 8 | Construction of a service area and toilet system | 7 | 650 | 3,000,000.00 |
| 9 | Construction of a playground and security fence for the preschool | 8 | 50 | 500,000.00 |
| 10 | Providing desks and chairs for the Dhamma school | 9 | 100 | 200,000.00 |
| 11 | Construction of protective walls at Bambara Gahakanda Temple | 10 | 300 | 2,000,000.00 |
| 12 | Extension of the Alawatta Water Project | 11 | 100 | 3,000,000.00 |
| 13 | Development of the Galgodahena road | 12 | 50 | 1,500,000.00 |
| 14 | Taking action against wildlife damage | 13 | 200 | 1,000,000.00 |
| 15 | Providing self-employment training and equipment | 14 | 100 | 1,500,000.00 |
| 16 | Completion of the remaining works on the Bambara Gahakanda Igurugolla road | 15 | 70 | 1,000,000.00 |
| 17 | Construction of a tank in the upper part of Bambara Gahakanda | 16 | 200 | 5,000,000.00 |
| 18 | Renovation of the pond near Mr. Gunapala's house | 17 | 50 | 500,000.00 |
| 19 | Providing housing for disaster-affected households | 18 | 25 | 2,000,000.00 |
| 20 | Implementing soil conservation programs throughout the region | 19 | 200 | 1,500,000.00 |
| 21 | Development of the road from near Mr. Wijedewa's house onwards | 20 | 15 | 2,000,000.00 |
| 22 | Implementation of a Minor Export Crop Consolidation Center and Marketing System | 21 | 100 | 5,000,000.00 |
| 23 | Development of the road from the main road to Mr. Kulasuriya's house | 22 | 20 | 1,000,000.00 |
| 24 | Development of the remaining part of the road through the village | 23 | 30 | 2,000,000.00 |
| 25 | Development of the road from near Mr. K. D. Piyadasa's house to Egalahena | 24 | 30 | 2,000,000.00 |
| 26 | Development of Kalugahathenna College educational activities up to A/L with all facilities | 25 | 200 | 5,000,000.00 |
575 - Klugahathenna
| 1 | Construction of safety fences for accident spots on main roads | 1 | 60,000,000.00 | |
| 2 | Obtaining a water filter for Kalugahathenna College | 2 | 2,000,000.00 | |
| 3 | Providing solutions for animal damage | 3 | 5,000,000.00 | |
| 4 | Development of the Pallekanda Road from near Mr. Piyasena's house | 4 | 2,500,000.00 | |
| 5 | Renovation of the roof of Kalugahathenna College | 5 | 2,000,000.00 | |
| 6 | Development of the road leading to Rambukahena from near Mr. Ariyapala's shop | 6 | 2,000,000.00 | |
| 7 | Reconstruction of unsafe wall and construction of safety fence for preschool | 7 | 3,000,000.00 | |
| 8 | Cutting and development of Udakanda Road from near Mr. G.G. Piyasena's house to Udakanda Public Well | 8 | 5,000,000.00 | |
| 9 | Renovation of the Udakanda Staircase | 9 | 3,000,000.00 | |
| 10 | Renovating the Udakanda public well and constructing a water project | 10 | 3,000,000.00 | |
| 11 | Completion of the remaining work on the Sangha building at Kalugahathenna Temple | 11 | 3,000,000.00 | |
| 12 | Development of the Bomamaluwa Road from near the house of Mr. Udakanda Nandasena | 12 | 2,500,000.00 | |
| 13 | Construction and concreting of a side wall near Mr. Sunil Jayawardena's house on Udagedara Road | 13 | 2,500,000.00 | |
| 14 | Improving the cultivation of minor export crops and providing necessary technical training (cinnamon pepper) | 14 | 700,000.00 | |
| 15 | Construction of a side wall along the Udageda Public Well Road | 15 | 2,500,000.00 | |
| 16 | Construction of a dormitory on the upper floor of the community hall | 16 | 2,500,000.00 | |
| 17 | Renovation of dug wells | 17 | 3,000,000.00 | |
| 18 | Renovation of the Udagedara public well | 18 | 2,500,000.00 | |
| 19 | Obtaining drinking water for the school | 19 | 2,500,000.00 | |
| 20 | Providing equipment to improve the carpentry industry | 20 | 3,000,000.00 | |
| 21 | Construction of the remaining portion of the side wall adjacent to the entrance road of Kalugahathenna College | 21 | 3,000,000.00 | |
| 22 | Providing a small export crop dehydrator to the farmers' organization | 22 | 3,000,000.00 | |
| 23 | Construction of the remaining portion of the side wall leading to the Kalugahatenna school grounds | 23 | 3,000,000.00 | |
| 24 | Construction of cemetery fence and land clearing | 24 | 3,000,000.00 | |
| 25 | Improving pest control 06 beneficiaries | 25 | 2,500,000.00 | |
| 26 | The rise of confectionery production | 26 | 3,000,000.00 | |
| 27 | Mushroom cultivation for 05 beneficiaries | 27 | 3,000,000.00 | |
| 28 | Development of the road leading from the main road to the temple | 28 | 3,000,000.00 | |
| 29 | Providing relief to houses at risk of landslides | 29 | 3,000,000.00 | |
| 30 | Construction of a 20-20 activity room (Suhuru) at the school | 30 | 1,500,000.00 | |
| 31 | Formally beautifying the side wall adjacent to the playground of Kalugahathenna College | 31 | 500,000.00 | |
| 32 | 49 beneficiaries receiving relief for landslide-affected lands | 32 | 60,000,000.00 | |
| 33 | Construction of stairs on the main road from between the two mango trees to Udakanda | 33 | 3,000,000.00 |
576 - Gallawa
| 1 | Development and carpeting of the road from Guru Madala Junction to Mr. Egodamulla Tissa's shop via Gallawa | 1 | 1850 | 60,000,000.00 |
| 2 | Egodamulla Clinic Center Improvement | 2 | 2520 | 2,500,000.00 |
| 3 | Concreting of the Egodamul School Road | 3 | 250 | 3,000,000.00 |
| 4 | Construction of the Gallawa Multipurpose Building | 4 | 250 | 5,000,000.00 |
| 5 | Construction of safety barriers at Egodamulla Primary School | 5 | 1083 | 2,500,000.00 |
| 6 | Developing self-employment opportunities (garments, batik products, confectionery, animal husbandry) | 6 | 42 | 2,500,000.00 |
| 7 | Clearing and allowing the Egodamulla cemetery to be used | 7 | 525 | 500,000.00 |
| 8 | Development of Gallawa Cemetery | 8 | 672 | 1,500,000.00 |
| 9 | Development of the Aswedduma Yayata Dam | 9 | 180 | 1,500,000.00 |
| 10 | Development of Gallawa Community Hall Road | 10 | 652 | 2,000,000.00 |
| 11 | Construction of a minor export crop collection center | 11 | 420 | 3,000,000.00 |
| 12 | Getting a SLTB bus to Mirissa via Rideegama Gallawa Egodamulla | 12 | 1500 | - |
| 13 | Development of the Gallawa Dodamgaslanda Dam | 13 | 120 | 1,500,000.00 |
| 14 | Development of the Gallawa Udagahatenna road | 14 | 64 | 2,000,000.00 |
| 15 | Getting a SLTB bus to Ankumbura via Rideegama, Wegama, Egodamulla, Mirissala | 15 | 1180 | 0.00 |
| 16 | Development of the Gallawa Egodawela road | 16 | 85 | 1,500,000.00 |
| 17 | Concreting of the Gallawa Ihalagama road | 17 | 150 | 2,000,000.00 |
| 18 | Development of the ancient temple at Gallawa Tampita | 18 | 720 | 2,000,000.00 |
| 19 | Concreting the access road to Welikanda | 19 | 120 | 2,500,000.00 |
| 20 | Development of the Egodamulla-Dehihena road | 20 | 85 | 2,000,000.00 |
| 21 | Development of Ratwatte Road | 21 | 25 | 2,000,000.00 |
| 22 | Concreting, developing and preparing the starting points of the two Egodamulla and Samaganwatte roads and concreting from near Mr. Mahinda's house onwards | 22 | 64 | 2,500,000.00 |
| 23 | Development of the Egodamulla Sugatarama Temple | 23 | 525 | 2,000,000.00 |
| 24 | Development of Egodamulla Pre-School | 24 | 250 | 1,000,000.00 |
| 25 | Development of the Egodamulla-Eriyagolla road | 25 | 75 | 2,000,000.00 |
| 26 | Development of the Gallawa Pragnasagara Temple | 26 | 520 | 2,000,000.00 |
| 27 | Implementation of a Gallawa drinking water scheme | 27 | 420 | 2,500,000.00 |
| 28 | Clearing and developing the road up to Gallawa Pangala | 28 | 85 | 1,500,000.00 |
| 29 | Development of the road from Eriyagolla Road to Koswatehena Farm | 29 | 45 | 2,000,000.00 |
| 30 | Development of the road from Bali Ela to Eriyagolla | 30 | 120 | 2,000,000.00 |
| 31 | Concreting of the Ambagahahena road | 31 | 150 | 2,000,000.00 |
| 32 | Creating a forest plantation on both sides of the Gallawa Canal | 32 | 1082 | 100,000.00 |
| 33 | Air rifles and other measures to prevent damage to coconut and fruit crops caused by the shrike | 33 | 1082 | 2,500,000.00 |
| 34 | Conducting job NVQ training courses for young people | 34 | 220 | 100,000.00 |
577 - Iriyagolla
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Development of the Eriyagolla main road | 1 | 2000 | 8,000,000.00 |
| 2 | Improving public transport services | 2 | 1000 | 200,000.00 |
| 3 | Taking action to prevent damage to wildlife | 3 | 80 | 1,000,000.00 |
| 4 | Establishment of a skills development center for the region | 4 | 500 | 10,000,000.00 |
| 5 | Development of Kalamaduwawa well | 5 | 150 | 500,000.00 |
| 6 | Starting a Minor Export Crop Planning Center | 6 | 1500 | 15,000,000.00 |
| 7 | Repairing the electrical extension in the Eriyagolla area by installing black wires | 7 | 380 | 5,000,000.00 |
| 8 | Obtaining a water project for the Eriyagolla division | 8 | 300 | 1,500,000.00 |
| 9 | Development of the agricultural road from Indigahahena to Paragahahena | 9 | 750 | 3,000,000.00 |
| 10 | Development of the Eriyagolla Colony Ace Bend South Side Road | 10 | 100 | 1,500,000.00 |
| 11 | Conducting drug prevention programs | 11 | 73 | 500,000.00 |
| 12 | Conducting promotional programs for new entrepreneurs | 12 | 30 | 15,000,000.00 |
| 13 | Plantation agro-industrial programs for export crops | 13 | 150 | 1,000,000.00 |
| 14 | Opening of an Early Childhood Development Center in the Riyagolla Division | 14 | 250 | 500,000.00 |
| 15 | Development of Eriyagolla Cemetery Road | 15 | 400 | 4,000,000.00 |
| 16 | Development of the Eriyagolla Egodamulla Road | 16 | 250 | 2,500,000.00 |
| 17 | Self-help program: clothing, furniture, tiles, telephones, and other items | 17 | 75 | 4,000,000.00 |
| 18 | Development of the Kalamadumawa-Gallawa road | 18 | 100 | 15,000,000.00 |
| 19 | Development of the Lower Eriyagolla Road | 19 | 600 | 3,500,000.00 |
| 20 | Providing electricity to homes without electricity | 20 | 25 | 500,000.00 |
| 21 | Development of the road running near the Grama Niladhari office | 21 | 100 | 3,000,000.00 |
| 22 | Development of gravel roads where necessary | 22 | 800 | 3,000,000.00 |
| 23 | Development of Eriyagolla College | 23 | 1200 | 10,000,000.00 |
| 24 | Animal husbandry (chickens, dairy cows, goats) | 24 | 20 | 1,000,000.00 |
| 25 | Development of the road leading to the Egodagammedda public well | 25 | 50 | 4,000,000.00 |
| 26 | Improving sanitation facilities in the district | 26 | 15 | 500,000.00 |
| 27 | Further development of the Ankereppuwa road | 27 | 75 | 4,000,000.00 |
| 28 | Development of the Kukuruwatta road running near the temple | 28 | 220 | 5,000,000.00 |
| 29 | Development of the gravel road through Eriyagolla Welikanda | 29 | 125 | 3,500,000.00 |
| 30 | Renovation of the Kalamaduwawa playground | 30 | 25 | 1,000,000.00 |
| 31 | Development of the Old Gallawa Road | 31 | 100 | 4,000,000.00 |
578 - Mirissala
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Development of dilapidated areas on the carpet road from Mirissala to Egodamulla | 1 | 300 | 20,000,000.00 |
| 2 | Extension of the existing water supply line to Kotikanuga | 2 | 20 | 800,000.00 |
| 3 | Development of the Pubukanda Road | 3 | 20 | 3,000,000.00 |
| 4 | Providing a SLTB bus from Ridigama via Panagamuwa | 4 | 300 | |
| 5 | Providing air rifles for the suppression of riots | 5 | 200 | 3,000,000.00 |
| 6 | Animal husbandry (chicken husbandry, goat husbandry) | 6.1 | 7 | 400,000.00 |
| 7 | Obtaining equipment needed for food production | 6.2 | 2 | 300,000.00 |
| 8 | Obtaining equipment required for the production of coconut shell-based decorative items | 6.3 | 1 | 200,000.00 |
| 9 | Obtaining necessary facilities for the sewing industry | 6.4 | 15 | 800,000.00 |
| 10 | Obtaining equipment needed for carpentry | 6.5 | 1 | 200,000.00 |
| 11 | Obtaining necessary equipment for the Kithul industry-related manufacturing industry | 6.6 | 14 | 300,000.00 |
| 12 | Obtaining equipment for the milling industry | 6.7 | 2 | 500,000.00 |
| 13 | Construction of Godawela Bridge on Ambatenna Road | 7 | 200 | 9,000,000.00 |
| 14 | Development of the road from Mirissala to Ambatenna | 8 | 200 | 2,000,000.00 |
| 15 | Development of the Weligoda-Egodamulla road | 9 | 80 | 3,000,000.00 |
| 16 | Development work at Mirissala College | 10 | 130 | 1,000,000.00 |
| 17 | Development of Udagapitiya Road | 11 | 30 | 500,000.00 |
| 18 | Providing services provided by the clinic center | 12 | 200 | 0.00 |
| 19 | Extension of the electricity line on the Kotikanuga main road to Mr. Hemantha's house | 13 | 2 | 300,000.00 |
| 20 | Development of the existing community hall building | 14 | 150 | 1,000,000.00 |
| 21 | Installation of street lamps in necessary places in Mirissa Division | 15 | 150 | 0.00 |
| 22 | Development of the access road to the clinic center | 16 | 130 | 500,000.00 |
| 23 | Development of the road running near Mirissala College up to Galbidina Stream | 17 | 150 | 2,000,000.00 |
| 24 | Construction of a staircase on the road near Mr. Milton Jayatissa's house | 18 | 20 | 300,000.00 |
| 25 | Development of the road near the clinic center to the houses below the community hall | 19 | 30 | 1,000,000.00 |
| 26 | Issuing deeds for government lands without deeds | 20 | 17 | 0.00 |
| 27 | Development of the road from Mirissala Junction to the cemetery | 21 | 30 | 3,000,000.00 |
| 28 | Resolving land issues of residents of Mirissala Cemetery | 22 | 7 | 0.00 |
| 29 | Establishing a Minor Export Crops Assembly Center | 23 | 250 | 5,000,000.00 |
| 30 | Providing a computer to the Mirissala Sub-Post Office | 24 | 300 | 300,000.00 |
| 31 | Providing equipment for crushing cinnamon | 25 | 10 | 350,000.00 |
579 - Galbidinaela
| 1 | Culverting and carpeting the road from near Mr. P.G. Samarasinghe's house to Siyambarahena | 1 | 600 | 12,000,000.00 |
| 2 | Providing air rifles for wildlife protection | 2 | 154 | |
| 3 | Extension of the existing water scheme in the Galbidina Ela division to ten acres of Galbidina Ela | 3 | 100 | 2,000,000.00 |
| 4 | Construction and development of a culvert and side wall on the road near Mr. P.G. Samarasinghe's house | 4 | 600 | 5,000,000.00 |
| 5 | Completion of the remaining work on houses for three low-income families | 5 | 12 | 1,500,000.00 |
| 6 | Construction of a staircase at the bottom of the road from near Mr. Weerasuriya's house | 6 | 20 | 400,000.00 |
| 7 | Is there a public transport service from Ridigama to Galbidinaela (bus)? | 7 | 300 | |
| 8 | Construction of the upper floor of the Galbidinaela Community Hall | 8 | 500 | 2,000,000.00 |
| 9 | Construction of the upper floor of the Vijayarama Temple | 9 | 450 | 3,000,000.00 |
| 10 | Construction of a small export crop collection factory | 10 | 150 | 5,000,000.00 |
| 11 | Construction of a drying center for minor export crops | 11 | 150 | 5,000,000.00 |
| 12 | Construction of a clinic center | 12 | 154 | 3,000,000.00 |
580 - Kanadeniyawala
| #NAME? | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Drug prevention programs | 1 | 100 | 200,000.00 |
| 2 | Development of Kanadeniyawala Pre-School | 2 | 1000 | 500,000.00 |
| 3 | Development of the road in the middle of the village of Kanadeniyawala | 3 | 35 | 1,000,000.00 |
| 4 | Installing filters for water projects of Nildiya community-based organizations | 4 | 120 | 1,500,000.00 |
| 5 | Construction of a clean drinking water project for the Kandeniyawala division | 5 | 300 | 2,000,000.00 |
| 6 | Developing, surveying and clearing the road leading to the public cemetery | 6 | 1500 | 8,000,000.00 |
| 7 | Development of the road from Keppitigala to Kotagedara | 7 | 350 | 2,000,000.00 |
| 8 | Construction of a community hall and official house for the Kanadeniwala division | 8 | 1500 | 2,000,000.00 |
| 9 | Developing the canal by constructing the embankment | 9 | 50 | 800,000.00 |
| 10 | Development of the Keppitigala Watta Devalaya road up to Ambagahawala | 10 | 100 | 1,000,000.00 |
| 11 | Development of the road from Changuwe in the middle of Walawwatta village to Deduru Mbaya | 11 | 50 | 1,000,000.00 |
| 12 | Obtaining a playground for the Kanadeniwala area | 12 | 500 | 1,000,000.00 |
| 13 | The road leading to the Kanadeniyawala paddy field will be developed (well road). | 13 | 100 | 1,000,000.00 |
| 14 | Development of the Keppitigala-Kotagedara road | 14 | 100 | 1,000,000.00 |
| 15 | Construction of a drainage system on both sides of the Keppitigala main road | 15 | 100 | 3,000,000.00 |
| 16 | Development of a culvert by using a side wall at the bend of the Walawwatta main road | 16 | 1500 | 15,000,000.00 |
| 17 | Construction of a garment and textile industry for the Kandeniyawala division | 17 | 1000 | 2,000,000.00 |
| 18 | Development of the coir industry | 18 | 130 | 1,000,000.00 |
| 19 | Construction of a public toilet and shelter for the Keppitigala public bus terminal | 19 | 1500 | 2,000,000.00 |
| 20 | Development of the post office road | 20 | 150 | 800,000.00 |
| 21 | Construction of a higher education center | 21 | 100 | 1,000,000.00 |
| 22 | Establishment of a garbage collection center at the Keppitigala intersection | 22 | 1000 | 500,000.00 |
| 23 | Issuance of deeds for lands of the Land Reforms Council | 23 | 100 | 10,000,050.00 |
| 24 | Provision of public transport services to Keppitigala Niyangama (bus) | 24 | 1000 | 3,000,000.00 |
| 25 | Widening the culvert on the Akkara Colony Road and developing the road up to Niyangama School | 25 | 300 | 2,000,000.00 |
| 26 | Development of the road from near Mr. Bauddsara's house to the threshing floor | 26 | 500 | 15,000,000.00 |
581 - Noyangama
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Construction of the Galahitiyawa Bridge on the main road | 1 | 5000 | 5,000,000.00 |
| 2 | Removal and reconstruction of the culvert in the Dehigolla Canal across the main road | 2 | 5000 | 3,500,000.00 |
| 3 | Obtaining a cemetery for Niyangama village | 3 | 1000 | 2,000,000.00 |
| 4 | Arrangement of drainage system on the main road | 4 | 3000 | 1,000,000.00 |
| 5 | Construction of the side wall of Niyangama School | 5 | 600 | 2,000,000.00 |
| 6 | Obtaining a drinking water project for Niyangama village | 6 | 800 | 5,000,000.00 |
| 7 | Construction of a new road to the Wagale Acres colony | 7 | 50 | 2,000,000.00 |
| 8 | Development of the Udakappitigala road via Paldeniya to be finalized | 8 | 400 | 10,000,000.00 |
| 9 | Repair of the Dehigolla Canal | 9 | 200 | 1,000,000.00 |
| 10 | Development of Udakappitigala main road | 10 | 90 | 2,000,000.00 |
| 11 | Development of the road between Pinnapotha village | 11 | 60 | 2,000,000.00 |
| 12 | Providing a water treatment plant and equipment to the Niyangama Community Water Project | 12 | 600 | 2,000,000.00 |
| 13 | Development of necessary areas on Paldeniya Road | 13 | 400 | 3,000,000.00 |
| 14 | Development of temple parking lot | 14 | 300 | 2,000,000.00 |
| 15 | Construction of a new road from near Niyangama Temple to Gampihilla | 15 | 100 | 2,000,000.00 |
| 16 | Three Bridges Road Development | 16 | 1500 | 10,000,000.00 |
| 17 | Construction of a new road from near Mr. Premachandra's house on the Galgoda road to Aspotha | 17 | 30 | 1,000,000.00 |
| 18 | Construction of Egodawela Anvil | 18 | 50 | 3,000,000.00 |
| 19 | Development of the Neelanga Road | 19 | 50 | 4,000,000.00 |
| 20 | Getting housing assistance | 20 | 10 | 3,000,000.00 |
| 21 | Installing a side wall at the water intake point for Godawela Yaya | 21 | 100 | 3,000,000.00 |
| 22 | Development of Pinnapotha-Aspotha road | 22 | 25 | 1,500,000.00 |
| 23 | Development of the Dog Canal | 23 | 70 | 1,000,000.00 |
| 24 | Construction of a safety fence for the bridge on the Neelanga road | 24 | 300 | 500,000.00 |
| 25 | Development of the Niyangama-Doramitiyawa road | 25 | 60 | 1,000,000.00 |
| 26 | Development of the Udakappitigala Bypass Road | 26 | 100 | 3,000,000.00 |
| 27 | Construction of a safety fence for the Paldeniya Bridge | 27 | 300 | 500,000.00 |
| 28 | Construction of the Walwala Canal Anvil | 28 | 50 | 3,000,000.00 |
| 29 | Construction of Egodawela Annex | 29 | 50 | 3,000,000.00 |
| 30 | Dairy cattle management | 30 | 20 | 2,000,000.00 |
| 31 | Chicken control | 31 | 100 | 2,000,000.00 |
| 32 | Obtaining necessary equipment for the garment sector | 32 | 50 | 5,000,000.00 |
| 33 | A dairy production center | 33 | 600 | 10,000,000.00 |
| 34 | Obtaining the necessary equipment for packing tea leaves | 34 | 25 | 1,000,000.00 |
| 35 | Planting trees on both sides of canals | 35 | 600 | 1,000,000.00 |
| 36 | Starting a garment manufacturing company | 36 | 1500 | 15,000,000.00 |
| 37 | Providing technical knowledge and facilities for handicrafts and carpentry industries | 37 | 1500 | 1,000,000.00 |
| 38 | Drug prevention | 38 | 1500 | 500,000.00 |
| 39 | Providing toilet assistance | 39 | 7 | 1,000,000.00 |
| 40 | Renovation of Imbulgodamada Anvil | 40 | 50 | 1,000,000.00 |
582 - Paragoda
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Development of the road from Paragoda to Dodamgalawa | 1 | 385 | 7,000,000.00 |
| 2 | Construction of a Paragoda drinking water project | 2 | 80 | 1,000,000.00 |
| 3 | Development of the road up to the Paragoda Ehelagolla Public Cemetery | 3 | 385 | 1,000,000.00 |
| 4 | Development of the road from Paragoda Weligoda to Kottawetiya | 4 | 30 | 3,000,000.00 |
| 5 | Development of the road from Paragoda to Alawatta by creating a bay | 5 | 20 | 4,000,000.00 |
| 6 | Obtaining a water treatment plant for the Dodamtalawa Water Project | 6 | 67 | 300,000.00 |
| 7 | Getting electricity to the Paragoda Community Hall | 7 | 150 | 200,000.00 |
| 8 | Development of necessary areas on the road from Ganegoda to Malliyagoda | 8 | 200 | 3,500,000.00 |
| 9 | Development of the Kottawetiya road to Dodamtalawa | 9 | 35 | 6,000,000.00 |
| 10 | Development of the Dodamtalawa-Pussella road | 10 | 20 | 6,000,000.00 |
| 11 | Construction of the bay and side wall near Mr. B.G. Karunadasa's shop in Paragoda. | 11 | 300 | 1,500,000.00 |
| 12 | Development of the road from near Mr. D.M. Rambanda's house to Mrs. D. M.K. Manike's house | 12 | 20 | 2,000,000.00 |
| 13 | Development of the water pipe system near Mr. Karunadasa's house | 13 | 30 | 200,000.00 |
| 14 | Providing excellent facilities for the work | 14 | 15 | 1,000,000.00 |
| 15 | Development of Karadagollewella and the irrigation system | 15 | 20 | 1,000,000.00 |
| 16 | Construction of a side wall in front of Mr. Nilantha's house opposite the temple on the Paragoda main road | 16 | 160 | 2,000,000.00 |
| 17 | Reconstruction of the Galmulla Dam | 17 | 160 | 2,000,000.00 |
| 18 | Development of Paragoda and Dodamthalawa playgrounds | 18 | 100 | 2,500,000.00 |
| 19 | Building houses for the homeless | 19 | 2 | 2,500,000.00 |
| 20 | Development of the road from near Mr. Weranga's house to Kottavetiya via Aluthkella | 20 | 20 | 1,000,000.00 |
| 21 | Development of Ruppe Well and Wagale Well | 21 | 65 | 500,000.00 |
| 22 | Development of the road to the house of Mrs. N.A. Sumanawathi near Paragoda Bodhi tree | 22 | 20 | 100,000.00 |
| 23 | Development of public wells on Dodamtalawa road | 23 | 10 | 200,000.00 |
| 24 | Development of the road from Dambagahamula to Mrs. Wimalawathi's house on the Dodamtalawa-Pussella road | 24 | 15 | 2,000,000.00 |
| 25 | Development of the road from Dodamtalawa junction to the house of Mr. P.R. Tikiri Bandara | 25 | 12 | 2,500,000.00 |
| 26 | Development of the road from near Mr. B.G. Dayananda's house to Mrs. D.M. Chammika's house | 26 | 8 | 4,000,000.00 |
| 27 | Construction of a side wall near Mr. Rajapaksa's house | 27 | 150 | 500,000.00 |
| 28 | Self-employment assistance | 28 | 10 | 3,000,000.00 |
| 29 | Construction of the Dodamtalawa Multipurpose Building | 29 | 155 | 2,500,000.00 |
| 30 | Getting training for the sewing industry | 30 | 60 | 100,000.00 |
| 31 | Training programs for export crop cultivation | 31 | 70 | 100,000.00 |
| 32 | Providing LRC land parcels | 32 | 120 | 1,500,000.00 |
| 33 | Implementing drug prevention programs | 33 | 155 | 100,000.00 |
| 34 | Animal Damage Prevention Programs | 34 | 700 | 1,000,000.00 |
| 35 | Animal husbandry development | 35 | 80 | 100,000.00 |
| 36 | Preventing environmental destruction | 36 | 300 | 200,000.00 |
583 - Ikiriyawaththa
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Reconstruction and reconstruction of the Kongahahena road landslide site | 1 | 60 | 10,000,000.00 |
| 2 | Re-establishing and providing electricity to the electricity system that was disconnected due to the disaster on the Kongahahena road | 2 | 60 | 200,000.00 |
| 3 | Repairing the bridge damaged by the disaster on the Ranamukhyathenne road | 3 | 80 | 5,000,000.00 |
| 4 | Construction of the road leading to Bokaniya Deduru Mawata | 4 | 30 | 5,000,000.00 |
| 5 | Construction of the road from the upper end of Polgolla to Niyangama via Welihiriya and renovation of the Kalamitiya Bridge | 5 | 150 | 4,000,000.00 |
| 6 | Concreting the road from Polgolla New Colony to Dedurumbaya | 6 | 100 | 2,000,000.00 |
| 7 | Renovation of Imbulgodamada Dam | 7 | 150 | 5,000,000.00 |
| 8 | Development of the road leading to the Ikirivatta Cemetery | 8 | 175 | 5,000,000.00 |
| 9 | Development of Katugallakotuwa and Kattaketuwa forts | 9 | 150 | 600,000.00 |
| 10 | Development of the New Colony Kattiketuwa Road | 10 | 60 | 5,000,000.00 |
| 11 | Concreting the road leading to the Ranamukayathenna Community Hall | 11 | 170 | 3,000,000.00 |
| 12 | Construction of a bridge over the Deduru River on the road from Thoraya to Kalamitiya | 12 | 60 | 5,000,000.00 |
| 13 | Development of the road leading from near Mr. T.G. Premadasa's house to Deduru Mawatha | 13 | 25 | 3,000,000.00 |
| 14 | The need for a drinking water project | 14 | 1000 | 30,000,000.00 |
| 15 | Concreting the road from near Mr. Samarapala's shop to Alawatta Hena | 15 | 30 | 4,000,000.00 |
| 16 | Completion of the remaining works of the Ikiriwatte Multipurpose Community Hall with sanitary facilities | 16 | 300 | 10,000,000.00 |
| 17 | Development of Kirimatiya Ella Road (from Naranmure) | 17 | 28 | 2,000,000.00 |
| 18 | Establishing a milk collection center and obtaining cooling facilities along with training | 18 | 6 | 1,500,000.00 |
| 19 | Obtaining high-quality animals for dairy farming and providing the necessary financial assistance and equipment for that purpose | 19 | 6 | 3,000,000.00 |
| 20 | Construction of a bridge over the canal on the road from Bokaniya to Wellagodalla | 20 | 20 | 3,000,000.00 |
| 21 | Culverting and concreting the road leading to Polgolla Cemetery | 21 | 60 | 250,000.00 |
| 22 | Development of the road from Bokaniya main road to Deduruambaya | 22 | 30 | 3,000,000.00 |
| 23 | Financial assistance and other assistance to prepare the necessary cowsheds for goat husbandry | 23 | 4 | 500,000.00 |
| 24 | Concreting of necessary areas on the road from Wellagodella to Dombagolla | 24 | 1000 | 1,000,000.00 |
| 25 | Concreting of the Ikiriwatta to Nokosgahatenna road | 25 | 20 | 4,000,000.00 |
| 26 | Renovation of the Naranmure Ale embankment (from near Mr. Piyal's house) | 26 | 100 | 2,500,000.00 |
| 27 | Development of the road from Wellagodella to Deduru Mawatha using concrete | 27 | 50 | 5,000,000.00 |
| 28 | Starting a garment manufacturing company | 28 | 20 | 10,000,000.00 |
| 29 | Starting a batik industry | 29 | 10 | 1,200,000.00 |
| 30 | Carrying out temple development activities | 30 | 983 | 1,000,000.00 |
| 31 | Assistance for equipment required for self-employment in the production of hoppers | 31 | 2 | 60,000.00 |
| 32 | Obtaining material assistance for self-employed coir production | 32 | 1 | 150,000.00 |
| 33 | Obtaining sewing machines to assist in sewing and selling clothes as self-employment | 33 | 3 | 500,000.00 |
| 34 | Getting chicks for poultry farming as a self-employment activity | 34 | 5 | 200,000.00 |
| 35 | Mushroom potting machines are being acquired to promote mushroom cultivation as a self-employment activity. | 35 | 1 | 400,000.00 |
| 36 | Financial and material support for coir brush production | 36 | 5 | 500,000.00 |
584 - Meeliyadda
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Implementation of a drinking water project for the Mileedda division | 1 | 850 | 10,000,000.00 |
| 2 | Development of the disaster-damaged Kotagedara Junction to Bodhiakotuwa road with a bridge | 2 | 150 | 7,500,000.00 |
| 3 | Reconstruction of the Tara Canal embankment and canal line damaged by the disaster | 3 | 100 | 5,000,000.00 |
| 4 | Making the Mileedda Division a drug-free zone | 4 | 1000 | |
| 5 | Development of Gonigoda road via Mileedda Dehigaspitiya | 5 | 2000 | 5,000,000.00 |
| 6 | Development of the road from Mileedda to Keppitigala via Kotagedara, where necessary | 6 | 750 | 2,500,000.00 |
| 7 | Development of the Ihalagama road from Bodhiya Fort Junction by installing a culvert | 7 | 750 | 2,500,000.00 |
| 8 | Construction of a public building with a blue roof warehouse | 8 | 1000 | 5,000,000.00 |
| 9 | Clearing the land of the Mileedda Cemetery and developing the old buildings of the cemetery | 9 | 1000 | 500,000.00 |
| 10 | Development of the agricultural road leading to the lower Wannipola paddy fields via the Mileedda Cemetery | 10 | 75 | 1,000,000.00 |
| 11 | Construction of a communication tower and extension of the telephone cable system from Illukpitiya to Mileedda | 11 | 1000 | 5,000,000.00 |
| 12 | Development of Wegama Kanda Road | 12 | 45 | 2,500,000.00 |
| 13 | Development of a public well on the road from Wellagodella to Dedurumbwa | 13 | 100 | 500,000.00 |
| 14 | Establishing a daycare center with a playground and children's park | 14 | 1000 | 2,500,000.00 |
| 15 | Renovation of the anicut in Lower Wannipola | 15 | 75 | 1,000,000.00 |
| 16 | Minimizing damage to crops by animals | 16 | 900 | |
| 17 | The developer is paving the road from Mileedda to Wellagodella in front of Mr. Sarath's house with a drainage system. | 17 | 50 | 1,000,000.00 |
| 18 | Concreting the front section of Kurukekotuwa Road opposite Sanasa | 18 | 50 | 1,000,000.00 |
| 19 | Development of the Deduru Mbaya access road near the Keppitigala bridge | 19 | 100 | 5,000,000.00 |
| 20 | Establish a waste management system | 20 | 450 | 200,000.00 |
| 21 | Resolving issues related to lands belonging to the palace | 21 | 400 | 200,000.00 |
| 22 | Developing a process to make the library usable | 22 | 1000 | 500,000.00 |
| 23 | Establishing a clothing company based on the domain | 23 | 25 | 5,000,000.00 |
| 24 | Establishing a coconut shell-based production village | 24 | 50 | 1,000,000.00 |
| 25 | Establishing a value addition center for collecting minor export crops | 25 | 50 | 2,500,000.00 |
| 26 | Creating a food dehydration project | 26 | 10 | 5,000,000.00 |
| 27 | Providing assistance to establish new animal husbandry projects and improve existing projects | 27 | 100 | 10,000,000.00 |
| 28 | Providing assistance and equipment for self-employment | 28 | 100 | 5,000,000.00 |
| 29 | Construction of a new bridge over Deduru River via the by-pass connecting Bodhiya Kotuwa and Keppitigala Kurunegala main road | 29 | 400 | 10,000,000.00 |
585 - Kosgolla
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Development of the road from Ihalagama to Bodhiya Fort | 1 | 500 | 3,000,000.00 |
| 2 | Developing the remaining section of Ihalagama Road | 2 | 200 | 3,000,000.00 |
| 3 | Development of the damaged area of the Wegama Kanda Galbidinaela road | 3 | 50 | 3,000,000.00 |
| 4 | Providing drinking water | 4 | 500 | 3,000,000.00 |
| 5 | Construction of an anvil near Siyambalagaha in Kosgolla Ale | 5 | 30 | 1,000,000.00 |
| 6 | Renovation of the Pussapihilla Canal Anicut | 6 | 30 | 1,000,000.00 |
| 7 | Development of Tara Ella Canal | 7 | 35 | 1,000,000.00 |
| 8 | Development of the road leading to the entrance by building side walls | 8 | 50 | 1,000,000.00 |
| 9 | Development of Kollanwalapitiya Road | 9 | 15 | 1,000,000.00 |
| 10 | Development of the remaining section of Kosgolla Road | 10 | 20 | 2,000,000.00 |
| 11 | Dusty Water Lift Project | 11 | 1000 | 5,000,000.00 |
| 12 | All road measurements and allocations | 12 | 500 | 500,000.00 |
| 13 | Completion of partial house work | 13 | 5 | 1,000,000.00 |
| 14 | Conducting a soap production program | 14 | 15 | 100,000.00 |
| 15 | Food dehydration programs | 15 | 1 | 100,000.00 |
| 16 | Improving village poultry farms | 16 | 1 | 100,000.00 |
| 17 | Improving Idal Coir Production | 17 | 1 | 200,000.00 |
| 18 | Spice production | 18 | 1 | 100,000.00 |
| 19 | Ornamental flower cultivation | 19 | 1 | 150,000.00 |
| 20 | Cinnamon cultivation | 20 | 1 | 100,000.00 |
| 21 | Improving goat management | 21 | 1 | 200,000.00 |
| 22 | Improving the existing garment factory | 22 | 7 | 500,000.00 |
| 23 | Construction of a preschool building | 23 | 200 | 2,000,000.00 |
| 24 | Construction of a children's park | 24 | 500 | 2,000,000.00 |
| 25 | Obtaining a playground for Kosgolla Division | 25 | 3,000,000.00 | |
| 26 | Conservation of areas where the Dedurumbaya is eroding | 26 | 1,000,000.00 | |
| 27 | Providing grants for LRC lands | 27 | 500,000.00 |
586 - Mahawela
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Carpeting of the main road from Wegama to Mahawela and Gurumada | 1 | 2000 | 200,000,000.00 |
| 2 | Concreting of the road from the Dedurumbaya Bridge near Ella Kadulla to the Mahayaya Middle Road | 2 | 1000 | 50,000,000.00 |
| 3 | Development of the Batalamale agricultural road through Mahawela Hodarawala Pitiya | 3 | 750 | 25,000,000.00 |
| 4 | Implementation of a new drinking water project | 4 | 350 | 10,000,000.00 |
| 5 | Renovation of Malburuthagahamula Anvil | 5 | 130 | 1,000,000.00 |
| 6 | Carrying out road surveying activities within the domain | 6 | 1839 | 1,000,000.00 |
| 7 | Implementing a lift irrigation scheme using the Dedurumbaya River | 7 | 100 | 10,000,000.00 |
| 8 | Establishing an irrigation project and road facilities for the Mahawela Gamawela paddy field | 8 | 100 | 8,000,000.00 |
| 9 | Development of religious places of worship such as Veheragala Viharaya, Wilgamvehera Viharaya, Sri Muthuthamari Amman Kovil and Alu Rahma Masjid | 9 | 1839 | |
| 10 | Development of the road from Nelligala Amuna to Veheragala Temple by installing a side wall | 9.1 | 250 | 5,000,000.00 |
| 11 | Construction of a protective fence around the rock on which the Veheragala Viharaya is located | 9.2 | 350 | 2,000,000.00 |
| 12 | Construction of the upper floor of the Sangha residence at the Veheragala Monastery | 9.3 | 350 | 5,000,000.00 |
| 13 | Construction of the walls of the Veheragala Viharaya monastery | 9.4 | 350 | 2,500,000.00 |
| 14 | Improving the Dharmashala at the Veheragala Monastery | 9.5 | 350 | 1,000,000.00 |
| 15 | Laying interlocks in the courtyard of the Veheragala Viharaya | 9.6 | 350 | 2,000,000.00 |
| 16 | Provision of funds to start an early childhood development center at the Veheragala Temple | 9.7 | 75 | 1,000,000.00 |
| 17 | Setting up the Dhamma School Library at Wilgamwehera Monastery | 9.8 | 300 | 1,000,000.00 |
| 18 | Providing toilet facilities for Wilgamwehera Dhamma School | 9.9 | 150 | 500,000.00 |
| 19 | Preparation of Dhamma school buildings and tables and chairs at Wilgamwehera Dhamma School | 9.1 | 250 | 2,000,000.00 |
| 20 | Construction of the Wilgamwehera Temple Road | 9.11 | 350 | |
| 21 | Construction of the Wilgamvehera temple pagoda | 9.12 | 350 | 2,500,000.00 |
| 22 | Establishing a housing scheme for estate houses | 10 | 77 | 20,000,000.00 |
| 23 | Concreting the path to the line rooms | 11 | 77 | 2,500,000.00 |
| 24 | Division of Mahawela Division into two parts | 12 | 1839 | 2,500,000.00 |
| 25 | Establishing a clothing company for the Mahawela Division | 13 | 100 | 5,000,000.00 |
| 26 | Development of Padeniya Road up to Nihal's shop | 14 | 275 | 5,000,000.00 |
| 27 | Concreting of the road from near the house of Mahayaya B.D. Seneviratne to near the house of E.D. Gunaratne | 15 | 300 | 6,500,000.00 |
| 28 | Construction of a cross-dam across the Pol Kotu Canal | 16 | 60 | 2,500,000.00 |
| 29 | Construction of a central dispensary | 17 | 3000 | 8,000,000.00 |
| 30 | Construction of a playground in the Mahayaya area | 18 | 60 | 1,000,000.00 |
| 31 | Concreting of the road starting from near the Mahawela Society Hall to Kosgollawatte | 19 | 60 | 80,000,000.00 |
| 32 | Concreting of the Unagahakatuwa road from near Mr. Veda's shop | 20 | 36 | 8,000,000.00 |
| 33 | Concrete paving of the road from near Mr. Nimal's house to Chamara Mudalali's shop | 21 | 75 | 3,500,000.00 |
| 34 | Renovation of Mahawela Community Hall and Community Hall grounds | 22 | 600 | 2,500,000.00 |
| 35 | Concrete pouring on the upper part of Dalukgala Road | 23 | 75 | 8,000,000.00 |
| 36 | Concreting of the Keselwara road from Egodamulla Carpet Road to the house of Mr. Jayathilaka, near the Welseniya Paddy Field. | 24 | 75 | 150,000,000.00 |
| 37 | Application of street lights | 25 | 1839 | 300,000.00 |
| 38 | Development of the road from the Mahawela main road to Kosgolla Watta and the road running near the rice fields to Alegoda | 26 | 60 | 10,000,000.00 |
| 39 | Concreting of the road from near the house of Mr. Serugaharuppa Sugathadasa to Keselwaraya | 27 | 100 | 15,000,000.00 |
| 40 | .Lower part of Bachchimale is an electricity project | 28 | 5 | 500,000.00 |
| 41 | Renovation of the Mahawela Volleyball Court | 29 | 1500 | 500,000.00 |
| 42 | Concreting the road between 24 houses and the church | 30 | 106 | 6,000,000.00 |
| 43 | Concreting the road from near the house of the Kirimahatthas in Bachchmale | 31 | 60 | 7,500,000.00 |
| 44 | Construction of a public toilet at the Mahawela Society Hall | 32 | 600 | 500,000.00 |
| 45 | Concreting the remaining sections of the Bachchmale road | 33 | 75 | 15,000,000.00 |
| 46 | Providing facilities for the cultivation of fenugreek | 34 | 75 | 700,000.00 |
| 47 | Concreting the road near Mr. Abeyratne's shop | 35 | 90 | 7,500,000.00 |
| 48 | Concreting of necessary areas on Mahawela Meekandana Road | 36 | 600 | 6,000,000.00 |
| 49 | Improving the coir industry and establishing coconut-related production facilities | 37 | 25 | 1,500,000.00 |
| 50 | Providing the necessary facilities to run a nursery | 38 | 2 | 200,000.00 |
| 51 | Upgrading livestock projects such as poultry farming and dairy farming as livelihood development projects | 39 | 20 | 1,000,000.00 |
| 52 | Providing necessary facilities for cinnamon cultivation | 40 | 75 | 500,000.00 |
| 53 | Establishing a milk collection center | 41 | 10 | 400,000.00 |
587 - Ganegoda
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Development of necessary areas on the road from Ganegoda Junction to Arunodagama | 1 | 150 | 3,000,000.00 |
| 2 | Development of the road in front of Mr. Weerakoon's shop | 2 | 15 | 1,000,000.00 |
| 3 | Development of the necessary places along the Gallida Dewata road | 3 | 20 | 1,000,000.00 |
| 4 | Development of the public building at Ganegoda Public Cemetery | 4 | 150 | 500,000.00 |
| 5 | Surveying, clearing and developing the road to Dombagolla Public Cemetery | 5 | 50 | 1,500,000.00 |
| 6 | Development of Bowatta Wela Road | 6 | 20 | 1,000,000.00 |
| 7 | Development of necessary places on the Weheragoda road | 7 | 20 | 1,000,000.00 |
| 8 | Development of the dam from Gedarekotuwa Ale to Kekulawala | 8 | 25 | 5,000,000.00 |
| 9 | Construction of a drinking water project for Ganegoda Division | 9 | 150 | 2,000,000.00 |
| 10 | Carrying out tree planting programs in Ganegoda Division | 10 | 150 | 50,000.00 |
| 11 | Development of the road from near Mrs. Indrakumari's house to Ranasinghe Estate | 11 | 20 | 1,000,000.00 |
| 12 | Development of the canal dam side wall near Mr. Nisham's house | 12 | 5 | 500,000.00 |
| 13 | Getting assistance for self-employment | 13 | 4 | 500,000.00 |
| 14 | Clearing the unpaved roads in Ganegoda Grama Niladhari Division | 14 | 75 | 300,000.00 |
| 15 | Construction of an agricultural road from Ganegoda to Mutthettuwa paddy field | 15 | 20 | 500,000.00 |
| 16 | Construction of anvils on the Gallida River | 16 | 50 | 1,000,000.00 |
| 17 | Development of the dam from Dombagolla to Dambekumbura | 17 | 50 | 2,500,000.00 |
| 18 | Renovation of the upper embankment of the Ganegoda Welimadana rice field | 18 | 50 | 1,000,000.00 |
| 19 | Development of the agricultural road from Dombagolla to Welimadana paddy field | 19 | 50 | 1,000,000.00 |
| 20 | Clearing and developing the road from near Mr. Nisham's house onwards | 20 | 5 | 1,000,000.00 |
| 21 | Renovation of old tube wells | 21 | 75 | 500,000.00 |
| 22 | Reconstruction of the dams of the Dombagolla Galamuna Stream | 22 | 50 | 1,500,000.00 |
| 23 | Obtaining housing assistance for low-income families | 23 | 2 | 1,000,000.00 |
| 24 | Providing support for animal husbandry | 24 | 22 | 1,000,000.00 |
| 25 | Obtaining assistance for minor export crops | 25 | 5 | 500,000.00 |
| 26 | Renovation of toilet facilities in low-income families | 26 | 3 | 200,000.00 |
| 27 | Conducting drug prevention programs in Ganegoda Division | 27 | 25 | 100,000.00 |
588 - Gonigoda
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Construction of a water project for the villages of Walagama, Miyanadeniya, and Arunodagama | 1 | 195 | 5,000,000.00 |
| 2 | Development of the road from Dehigaspitiya to Gonigoda Hospital | 2 | 1200 | 7,500,000.00 |
| 3 | Development of the road from Gonigoda to Arunodagama via Walagama | 3 | 120 | 4,000,000.00 |
| 4 | Development of the first Dehigaspitiya crossing | 4 | 25 | 2,000,000.00 |
| 5 | Development of Arunodagama Tank | 5 | 280 | 1,500,000.00 |
| 6 | Building toilets for those without toilet facilities | 6 | 54 | 400,000.00 |
| 7 | Development of the road from Walagama to Miyanadeniya by constructing a culvert | 7 | 55 | 3,000,000.00 |
| 8 | Construction of the side wall near the Narandana Ale Bridge | 8 | 1200 | 5,000,000.00 |
| 9 | Covering electrical wires | 9 | 280 | 1,000,000.00 |
| 10 | Development of the road from Walagama to Ganegoda | 10 | 75 | 1,000,000.00 |
| 11 | Construction of a bridge over the canal near the house of Mrs. H.M. Bisomanike, Miyanadeniya | 11 | 3 | 1,500,000.00 |
| 12 | Development of the Miyanadeniya-Thalawa road | 12 | 35 | 2,500,000.00 |
| 13 | Development of the road from near the school to Miyanadeniya | 13 | 75 | 3,000,000.00 |
| 14 | Construction of a bridge over the canal on the road running near Gonigoda Bogasa | 14 | 3 | 5,000,000.00 |
| 15 | Development of the road leading from the Gonigoda School playground to Wegama by installing a culvert | 15 | 1200 | 10,000,000.00 |
| 16 | Development of the road running from Gonigoda main road to Mr. Amarasinghe's shop | 16 | 10 | 2,000,000.00 |
| 17 | Development of the second Dehigaspitiya crossing | 17 | 12 | 2,500,000.00 |
| 18 | Development of Gonigoda Lebadapitiya Road | 18 | 10 | 1,000,000.00 |
| 19 | Construction of an anvil to draw water from the Urumade Canal to the Miyanadeniya paddy fields | 19 | 3,000,000.00 | |
| 20 | Development of the school playground and construction of a sports complex | 20 | 710 | 2,000,000.00 |
| 21 | Construction of the hospital fence | 21 | 1200 | 1,000,000.00 |
| 22 | Development of the toilet system at Gonigoda Hospital | 22 | 1200 | 500,000.00 |
| 23 | Construction of fence at Gonigoda School | 23 | 710 | 300,000.00 |
| 24 | Construction of a building for the primary section of Gonigoda College | 24 | 710 | 5,000,000.00 |
| 25 | Carrying out tree planting programs in and around the Galgoda Temple and Arunodagama Temples | 25 | 280 | 30,000.00 |
| 26 | Obtaining the necessary goods for the Arunodagama Kala Institute | 26 | 2 | 100,000.00 |
| 27 | Obtaining necessary equipment for the salon | 27 | 2 | 50,000.00 |
| 28 | Getting a sewing machine | 28 | 10 | 700,000.00 |
| 29 | Providing the necessary inputs for the production of Tawashi brushes | 29 | 10 | 200,000.00 |
| 30 | Providing equipment needed for the masonry industry | 30 | 2 | 50,000.00 |
| 31 | Getting help for chicken farming | 31 | 10 | 1,000,000.00 |
| 32 | Providing assistance and necessary equipment for anthurium cultivation | 32 | 2 | 400,000.00 |
| 33 | Conservation of the Miyanadeniya Thotupola Pitiya Canal Dams | 33 | 280 | 50,000.00 |
| 34 | Implementing drug prevention programs | 34 | 837 | 100,000.00 |
| 35 | Providing assistance for the production of decorative hair bands | 35 | 1 | 100,000.00 |
| 36 | Machines and aids needed for sewing bags, tent fabrics, and vehicle covers | 36 | 5 | 500,000.00 |
589 - Maspotha
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Development of necessary areas of Pannalgoda roundabout | 1 | 150 | 3,000,000.00 |
| 2 | Development of Kirimatiya Road | 2 | 100 | 3,000,000.00 |
| 3 | Development of the Pannalgoda Drinking Water Project | 3 | 200 | 5,000,000.00 |
| 4 | Development of the Maspotha village-center road | 4 | 250 | 5,000,000.00 |
| 5 | Development of the road from near Mr. Inidika's house to Mr. Kalugamuwa's house | 5 | 200 | 3,000,000.00 |
| 6 | Construction of a service building | 6 | 652 | 2,500,000.00 |
| 7 | Development of Lumbiniwatte Road | 7 | 652 | 5,000,000.00 |
| 8 | Development of the Kalotuwawa Road | 8 | 100 | 5,000,000.00 |
| 9 | Attitude development, drug prevention, youth clubs and sports clubs | 9 | 652 | 3,000,000.00 |
| 10 | Development of the road from near Mr. Dharmasinghe's house to Rane Mudalali's house | 10 | 150 | 5,000,000.00 |
| 11 | Obtaining a filter for the Maspotha water project | 11 | 20 | 1,000,000.00 |
| 12 | Improving sanitation facilities (including 7 toilets) | 12 | 100 | 5,000,000.00 |
| 13 | Development of the road from near Mr. Dharmasena's house to Mr. Dassanayake's house | 13 | 20 | 4,000,000.00 |
| 14 | Development of the Kalotuwawa Drinking Water Project | 14 | 35 | 7,000,000.00 |
| 15 | Developing the canal by constructing the Maspotha Anvil | 15 | 150 | 10,000,000.00 |
| 16 | Extension of Maspotha power line system | 16 | 100 | 10,000,000.00 |
| 17 | Dehydrating and producing food | 17 | 5 | 4,000,000.00 |
| 18 | Development of the road from near Mr. Pannalgoda Piyasena's land to Deduru Mbaya | 18 | 5 | 5,000,000.00 |
| 19 | Obtaining beauty salon equipment | 19 | 1 | 300,000.00 |
| 20 | Starting a coir-based production project | 20 | 8 | 10,000,000.00 |
| 21 | Obtaining a coconut husk cutting machine for Mrs. A.D.C. Maleni | 21 | 1 | 2,300,000.00 |
| 22 | Development of the dam near Mr. Nimal's shop | 22 | 60 | 4,000,000.00 |
| 23 | Providing financial assistance to Mr. Sampath's currently running clothing company | 23 | 10 | 5,000,000.00 |
| 24 | Implementing a self-employment training program | 24 | 50 | 3,000,000.00 |
| 25 | Obtaining a feed grinder for poultry farming | 25 | 5 | 5,000,000.00 |
| 26 | Obtaining a machine for making slats | 26 | 1 | 4,000,000.00 |
| 27 | Implementing environmental conservation and tree planting programs | 27 | 652 | 2,500,000.00 |
| 28 | Construction of 05 houses for low-income earners | 28 | 10 | 10,000,000.00 |
| 29 | Providing electrical equipment | 29 | 1 | 5,000,000.00 |
590 - Pihimbuwa
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Development of the section of the Kalotuwawa road up to Kalugala Pihilla, which was damaged due to the disaster | 1 | 160 | 5,000,000.00 |
| 2 | Construction of a side wall near the Polwatta junction on the disaster-damaged Watawanarama road | 2 | 800 | 5,000,000.00 |
| 3 | Development of the Nungamuwa road from the Keppetigala main road | 3 | 125 | 7,000,000.00 |
| 4 | Development of the Watawanarama road starting from near the Wagahamula bus stand | 4 | 500 | 10,000,000.00 |
| 5 | Providing assistance for self-employment | 5 | 16 | 16,000,000.00 |
| 6 | Construction of a vocational training center | 6 | 891 | 5,000,000.00 |
| 7 | Preventing wildlife damage | 7 | 891 | 1,500,000.00 |
| 8 | Providing modern agricultural equipment for modern farming methods | 8 | 5 | 5,000,000.00 |
| 9 | Drug elimination | 9 | 891 | 500,000.00 |
| 10 | Development of the road from near Mr. Handungoda's house to Uncle Kalu's house | 10 | 350 | 7,000,000.00 |
| 11 | Development of the Koloniya Road from near Kalugala Pihilla to Mr. Namadeva's house | 11 | 200 | 5,000,000.00 |
| 12 | Providing housing assistance | 12 | 10 | 10,000,000.00 |
| 13 | Construction of a drinking water scheme for Pihimbuwa division | 13 | 891 | 8,000,000.00 |
| 14 | Land settlement | 14 | 12 | 50,000.00 |
| 15 | Construction of the anvil and dam at Nukadanda Yaya | 15 | 8 | 5,000,000.00 |
| 16 | Development of the road between thirty houses | 16 | 75 | 4,000,000.00 |
| 17 | Development of 45 acres of Malbay Colony Road from near Mrs. Seelawathi's house | 17 | 75 | 5,000,000.00 |
| 18 | Development of the road from near Mr. Joseigno's house to Dewata | 18 | 60 | 7,000,000.00 |
| 19 | Bundling the Pihimbuwa electrical system | 19 | 891 | 7,000,000.00 |
| 20 | Providing animal husbandry assistance | 20 | 10 | 6,000,000.00 |
| 21 | Development of the road from near Mrs. Deepthi's house onwards | 21 | 65 | 7,000,000.00 |
| 22 | Development of the side wall, culvert and canal near Mr. Peiris' house | 22 | 500 | 8,000,000.00 |
| 23 | Development of Sri Atthadassee Early Childhood Center | 23 | 4 | 2,000,000.00 |
| 24 | Development of the playground in the housing scheme | 24 | 300 | 5,000,000.00 |
| 25 | Completion of the remaining work on the Watavanarama Dhamma School building | 25 | 260 | 4,000,000.00 |
| 26 | Development of the Ilukpitiya Devalaya Road | 26 | 30 | 3,000,000.00 |
| 27 | Development of the common building of the housing scheme | 27 | 300 | 8,000,000.00 |
| 28 | Development of 02 side roads starting from Mr. Peiris' house | 28 | 60 | 3,000,000.00 |
| 29 | Construction of a protective fence around the side wall and well of Pubudu Pre-School | 29 | 5 | 3,000,000.00 |
| 30 | Development of the crossing above Pubudu Pre-School | 30 | 40 | 2,000,000.00 |
| 31 | Completing the remaining work in the official residence | 31 | 891 | 1,000,000.00 |
591 - Malbe
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Development of the Maha Yaya Agricultural Road from near Mr. Wimale's shop | 1 | 750 | 5,000,000.00 |
| 2 | Development of the Palle Watta agricultural road running near the water tank | 2 | 250 | 5,000,000.00 |
| 3 | Development of the Malbay Folk Path | 3 | 450 | 2,500,000.00 |
| 4 | Development of the road from Thirteen Acre Junction to the cemetery | 4 | 350 | 2,500,000.00 |
| 5 | Development of the Koloniya Rubber Estate Road | 5 | 450 | 2,500,000.00 |
| 6 | Development of the upper road from near Thelambugaha | 6 | 60 | 1,000,000.00 |
| 7 | Development of the crossing near Mr. Anura's house | 7 | 30 | 1,000,000.00 |
| 8 | Development of the road from near Mr. Perera's house to the upper roundabout | 8 | 30 | 1,000,000.00 |
| 9 | Development of the Mayiwela Canal Dam | 9 | 250 | 5,000,000.00 |
| 10 | Development of the necessary areas of the canal dam running from the main channel in Patulamulla through Palle Wattha | 10 | 400 | 7,500,000.00 |
| 11 | Providing a water treatment plant and preparing the pipeline system for the Malbay Water Project | 11 | 350 | 2,500,000.00 |
| 12 | Providing machinery and assistance to the garment industry (providing sewing machines) | 12 | 4 | 1,000,000.00 |
| 13 | Providing equipment for blacksmiths | 13 | 5 | 500,000.00 |
| 14 | Development of coir-related workshops and provision of equipment | 14 | 15 | 1,500,000.00 |
| 15 | Providing equipment for the construction industry (masonry) | 15 | 10 | 200,000.00 |
| 16 | Providing support equipment for beekeeping | 16 | 10 | 200,000.00 |
| 17 | Providing assistance for pest control | 17 | 3 | 175,000.00 |
| 18 | Providing assistance for poultry farming | 18 | 5 | 50,000.00 |
| 19 | Establishing a Vocational Training Skills Center (multiple languages) | 19 | 600 | 5,000,000.00 |
| 20 | Providing housing for low-income earners | 20 | 6 | 1,000,000.00 |
| 21 | Developing programs to eradicate drugs | 21 | 350 | 20,000.00 |
| 22 | Taking measures to prevent wild animal threats | 22 | 350 | 50,000.00 |
| 23 | A livestock farm standardization program | 23 | 10 | 20,000.00 |
592 - Gurumada
| 1 | Construction of a new bridge over the Deduru Oya on the Gurumada main road, which was damaged due to Cyclone Ditva and floods, and development of the road at the site | 1 | 1800 | 10,000,000.00 |
| 2 | Reconstruction of the water supply system near Gurumada Bridge that was damaged due to the disaster | 2 | 1110 | 400,000.00 |
| 3 | Reconstruction of the old embankment near the Gallawa Oya of the Garumada Regamuwa Dam that collapsed due to the disaster | 3 | 190 | 1,200,000.00 |
| 4 | Development of the damaged areas of the dam that carries water from the Garumada Regamuwa Amun to the Regamuwa paddy fields due to the disaster and preparation of a place to release excess water | 4 | 190 | 600,000.00 |
| 5 | Development of the damaged areas of the dam where water comes from the Gurumada Mirang Fort due to the disaster | 5 | 45 | 2,000,000.00 |
| 6 | Implementing a drug prevention program in Gurumada Wasatam | 6 | 25 | 8,000.00 |
| 7 | Assigning the responsibility of collecting garbage from Deduru Oya on the Gurumada main road to the final boundary of the division to the Regional Council | 7 | 677 | 0.00 |
| 8 | Construction of an official shelter and clinic center for Gurumada division | 8 | 677 | 2,000,000.00 |
| 9 | Directing children who have completed their school education to vocational training courses | 9 | 5 | 0.00 |
| 10 | Providing assistance for the construction of cages for animal husbandry and providing animals under new and existing entrepreneurship schemes | 10 | 8 | 730,000.00 |
| 11 | Providing assistance and equipment for self-employment under new entrepreneurship and existing entrepreneurship schemes | 11 | 29 | 3,600,000.00 |
| 12 | Extension of the existing water project in Gurumada Division to both the Gurumada Gallawa main road and the Thalgala Wattha road | 12 | 170 | 2,500,000.00 |
| 13 | Construction of houses for low-income earners in Gurumada Division and completion of the remaining work on half-completed houses | 13 | 12 | 12,000,000.00 |
| 14 | Development of the remaining section of the road up to Gurumada Al Amin Pre-School | 14 | 250 | 300,000.00 |
| 15 | Construction and renovation of toilets for low-income families in Gurumada Division | 15 | 6 | 750,000.00 |
| 16 | Development of the broken section near Mr. H.M. Samun's house on the Gurumada Kalgala Wattha road | 16 | 50 | 200,000.00 |
| 17 | Widening and carpeting of Gurumada main road | 17 | 1800 | 6,000,000.00 |
| 18 | Construction of drainage system on both sides of Gurumada main road | 18 | 1800 | 3,000,000.00 |
| 19 | Development of the road by constructing a drainage system on both sides of the road from the main road to Gurumada Palliya Road, Tuththiripitiya | 19 | 300 | 4,000,000.00 |
| 20 | Development of the main road from Gurumada to Gallawa using drains on both sides (including the bridge) | 20 | 950 | 9,000,000.00 |
| 21 | Development of the road from the starting point of the road from Gurumada to Gallawa Welikanda | 21 | 90 | 1,500,000.00 |
| 22 | Development of the road inside the Gurumada Cemetery | 22 | 650 | 2,000,000.00 |
| 23 | Development of the road from near the house of Mr. N.L. Rahamathulla, Gurumada to the house of Mrs. I.L. Sitthi Masuda | 23 | 12 | 1,000,000.00 |
| 24 | Development of the road from Gurumada Gallawa main road towards Mr. S. Anandan's house | 24 | 17 | 1,000,000.00 |
| 25 | Development work at Gurumada Jamiat Thowheed Jumma Mosque | 25 | 220 | 500,000.00 |
| 26 | Development of the remaining section of the Gurumada Upper Watta Road up to Mr. A.H.S. Ahmadu's house | 26 | 10 | 700,000.00 |
| 27 | Development of the remaining section of the road from Gurumada Jumma Mosque to the Meerankotuwa Dam | 27 | 35 | 1,000,000.00 |
| 28 | Development of the road from Gurumada main road to the house of Mr. A.R.M. Muharis | 28 | 9 | 1,000,000.00 |
| 29 | Providing necessary equipment to Gurumada Al Amin Preschool and developing the children's park | 29 | 250 | 1,200,000.00 |
| 30 | Providing electricity to Gurumada Al Amin Pre-School | 30 | 250 | 70,000.00 |
| 31 | Development of the road from near the house of Mr. Gurumada A.M. Masood along the Meerang Fort Dam to Meerang Fort Anum | 31 | 50 | 8,000,000.00 |
| 32 | Development of the road from near Mrs. S. Nasrina's house to Mr. H. Ayees' house on the Gurumada-Tuththiripitiya road | 32 | 11 | 400,000.00 |
593 - Welikanda
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Drug elimination | 1 | 100 | 100,000.00 |
| 2 | Development of the road from the housing scheme to Morapanda | 2 | 300 | 5,000,000.00 |
| 3 | Issuance of land deeds | 3 | 20 | 0.00 |
| 4 | Development of the Welikanda Deduru Oya Bridge | 4 | 300 | 5,000,000.00 |
| 5 | Providing public transportation facilities | 5 | 169 | 8,000,000.00 |
| 6 | Development of the 50-acre Pallama road | 6 | 50 | 3,000,000.00 |
| 7 | Meeting the drinking water needs of the 50 acre area | 7 | 20 | 2,000,000.00 |
| 8 | Providing land for the construction of houses to the landless | 8 | 50 | 8,000,000.00 |
| 9 | Construction of an official house for the Welikanda division | 9 | 169 | 1,000,000.00 |
| 10 | Development of Mr. Dharmadasa's land on the Welikanda Jankure road from the boundary to Mr. Amin's land | 10 | 50 | 3,000,000.00 |
| 11 | Development of the Panagamuwa Road from near the Gurumada Road Fisheries Center to the Eriyagolla Main Road | 11 | 400 | 8,000,000.00 |
| 12 | Establishing an estate housing project | 12 | 60 | 5,000,000.00 |
| 13 | Development of the Panagamuwa Estate Muthumari Amman Temple | 13 | 80 | 1,000,000.00 |
| 14 | Providing sanitation facilities to families without sanitation facilities | 14 | 6 | 500,000.00 |
| 15 | Development of the Welikanda Mahindarama Temple | 15 | 35 | 1,500,000.00 |
| 16 | Construction of a clinic center | 16 | 169 | 2,000,000.00 |
| 17 | Assistance for self-employment | 17 | 20 | 2,000,000.00 |
| 18 | Establishing a vocational training center | 18 | 150 | 5,000,000.00 |
| 19 | Providing assistance for the cultivation of minor export crops | 19 | 20 | 1,000,000.00 |
| 20 | Establishment of an animal husbandry and milk collection center | 20 | 20 | 3,000,000.00 |
| 21 | Developing the Anicut for watershed protection | 21 | 100 | 1,000,000.00 |
| 22 | Development of the 100-acre Panagamuwa Estate road from Laima to the main road in Jankure | 22 | 300 | 8,000,000.00 |
| 23 | Electrical extension | 23 | 1 | 200,000.00 |
594 - Hadiramulla
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Development of the Ranthetikanda Kottanga Road | 1 | 500 | 2,000,000.00 |
| 2 | Development of the road from near Mr. Taslim's house onwards | 2 | 70 | 1,500,000.00 |
| 3 | Development of the road from near Altaf's house in Hadiramulla onwards | 3 | 50 | 1,500,000.00 |
| 4 | Construction of a side wall to the Bogahawela Canal | 4 | 120 | 200,000.00 |
| 5 | Construction of a side wall to the Muthukeliya Canal | 5 | 90 | 1,500,000.00 |
| 6 | Self-employment | 6 | 45 | 1,500,000.00 |
| 7 | Development of Hadiramulla to Pillawa road (sidewall) | 7 | 150 | 1,500,000.00 |
| 8 | Development of Pillawa Road | 8 | 150 | 2,000,000.00 |
| 9 | Development of the road from near Mrs. Shakila's house on the Hadiramulla by-pass road onwards | 9 | 70 | 500,000.00 |
| 10 | Extension of drinking water lines required for the district | 10 | 90 | 500,000.00 |
| 11 | Drug prevention programs | 11 | 184 | 5,000.00 |
| 12 | Construction of a drinking water treatment plant in Hadiramulla Kottan | 12 | 210 | 1,000,000.00 |
| 13 | Construction of a children's park (for the primary section of the school) | 13 | 700 | 500,000.00 |
| 14 | Installation of solar panels at Kottan Church | 14 | 40 | 700,000.00 |
| 15 | Construction of drainage system on Panagamu-Eriyagolla road up to Ilukwehera | 15 | 1000 | 3,000,000.00 |
| 16 | Development of the road from near Mr. M.M.Uwais's house onwards | 16 | 50 | 1,500,000.00 |
| 17 | Concrete paving of Hadiramulla Bypass Road (from near Mr. Sevi's house to Mr. Sainullah's house) | 17 | 60 | 1,000,000.00 |
| 18 | Development of the Kottan-Kandegedara road | 18 | 70 | 1,000,000.00 |
| 19 | Arrangement of drainage systems on school roads | 19 | 90 | 1,000,000.00 |
| 20 | Developing the inactive electricity system of Kottan | 20 | 20 | 500,000.00 |
| 21 | Construction of a shoe drain by covering the carpeted road and wall from the main entrance of the school to the second entrance | 21 | 170 | 1,000,000.00 |
| 22 | Covering the concrete drain constructed from the main entrance of the school to the canal with concrete blocks | 22 | 170 | 1,000,000.00 |
| 23 | Development of necessary places from near Mr. Jawpar's house in Kurugodapitiya onwards | 23 | 42 | 500,000.00 |
| 24 | Development of Kottan Church Road | 24 | 40 | 300,000.00 |
| 25 | Construction of a side wall to the Kottange Canal | 25 | 22 | 1,000,000.00 |
| 26 | Development of the road up to Asmiya's house on the Hadiramulla main road | 26 | 20 | 1,000,000.00 |
| 27 | Providing toilet facilities | 27 | 8 | 2,000,000.00 |
| 28 | Animal husbandry | 28 | 50 | 400,000.00 |
595 - Pitiyegedara
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Development of the Bhuliadena Watta road leading to Mr. Mohammed Ali's house by installing a culvert | 1 | 30 | 2,000,000.00 |
| 2 | Developing the needs of Al Iqra Preschool | 2 | 50 | 2,000,000.00 |
| 3 | Developing the road to Al Iqra Preschool | 3 | 50 | 2,000,000.00 |
| 4 | Implementing waste management programs | 4 | 750 | 500,000.00 |
| 5 | Setting up the main road drainage system in the yard | 5 | 1500 | 4,000,000.00 |
| 6 | Development of the road leading from near Mr. Mustaqeen's house | 6 | 750 | 500,000.00 |
| 7 | Providing equipment for self-employment | 7 | 50 | 4,000,000.00 |
| 8 | Implementation of social welfare programs | 8 | 750 | 1,000,000.00 |
| 9 | Development of the road from near Mr. Samin's house to Mr. Senpad's house | 9 | 750 | 1,000,000.00 |
| 10 | Construction of a box culvert for the canal near the Tawheed Nazkia Mosque | 10 | 350 | 1,000,000.00 |
| 11 | Extension of the water project for families without drinking water | 11 | 300 | 1,000,000.00 |
| 12 | Development of the road with the side wall of the Badulla Kada bypass road | 12 | 750 | 1,500,000.00 |
| 13 | Development of the Pitiyegedara Canal | 13 | 300 | 500,000.00 |
| 14 | Development of volleyball court | 14 | 300 | 500,000.00 |
| 15 | Providing housing assistance to low-income earners | 15 | 50 | 1,000,000.00 |
| 16 | Development of the road to Kandegedara | 16 | 350 | 1,000,000.00 |
| 17 | Providing assistance for animal control | 17 | 7 | 300,000.00 |
| 18 | Providing computers for education | 18 | 2 | 2,000,000.00 |
596 - Panagmuwa
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Development of the drainage system on the road from the main road to Udamulla | 1 | 850 | 3,500,000.00 |
| 2 | Development of the drainage system on Gopala Gedara Road | 2 | 450 | 2,500,000.00 |
| 3 | Obtaining a drinking water purifier | 3 | 650 | 3,000,000.00 |
| 4 | Construction of a side wall along the canal from near the Puslim Public Cemetery to Pradana Road | 4 | 35 | 1,500,000.00 |
| 5 | A clothing training center for the district | 5 | 20 | 6,500,000.00 |
| 6 | Development of the canal from Gopalagedara to the main road | 6 | 75 | 1,000,000.00 |
| 7 | Construction of a children's park on the clinic center grounds | 7 | 350 | 500,000.00 |
| 8 | Construction of an official shelter center for government officials | 8 | 650 | 3,000,000.00 |
| 9 | Development of the road leading from behind the Muslim cemetery towards E.E. Abeywardena's house. | 9 | 45 | 1,500,000.00 |
| 10 | Concreting the road from near dMRasmi's house to S Siraj's house | 10 | 25 | 1,000,000.00 |
| 11 | Renovating a dilapidated well in the Hommara paddy field into a cultivation well | 11 | 40 | 500,000.00 |
| 12 | Providing drinking water facilities to the Gopalagedara area on the road from Mahagama to Annur College | 12 | 150 | 2,500,000.00 |
| 13 | Extension of the drinking water pipe system on the road from near DM Rasmi's house to S. Siraj's house | 13 | 25 | 500,000.00 |
| 14 | Providing equipment for the iron welding industry | 14 | 1 | 200,000.00 |
| 15 | Providing equipment for the aluminum fittings industry | 15 | 1 | 200,000.00 |
| 16 | Development of the culvert in front of M.S. Safir's house | 16 | 60 | 300,000.00 |
| 17 | Concreting the road from near M Manas's house to MM Nilham's house | 17 | 25 | 500,000.00 |
| 18 | Providing assistance for goat husbandry | 18 | 10 | 2,000,000.00 |
| 19 | Providing sanitation facilities to homes without sanitation facilities | 19 | 8 | 200,000.00 |
| 20 | Providing assistance for dairy cattle management | 20 | 2 | 500,000.00 |
| 21 | Providing assistance for self-employment | 21 | 7 | 500,000.00 |
597 - Polwaththa
| 1 | Water supply extension to 19 acres by the Water Supply Board | 1 | 100 | 2,000,000.00 |
| 2 | Construction of the embankment of the Kovilalanda Canal | 2 | 32 | 1,000,000.00 |
| 3 | 19 acres Development of the road from Nalin's house to Ganesh's house and preparation of the drainage system | 3 | 50 | 8,000,000.00 |
| 4 | Repairing the drainage system on Kovilalanda Road | 4 | 20 | 5,000,000.00 |
| 5 | Development of the road from the Keppitigala main road through the paddy fields to Eriyagolla | 5 | 800 | 9,000,000.00 |
| 6 | Introducing self-employment opportunities and providing equipment to those who run them | 6 | 30 | 8,000,000.00 |
| 7 | Obtaining a water treatment plant for water supplied by the Water Supply Board | 7 | 1406 | 4,000,000.00 |
| 8 | Renovation of the Polwatta Ranninda Anvil | 8 | 30 | 6,000,000.00 |
| 9 | Development of the 19-acre road in front of the Nizam's house to the end | 9 | 40 | 6,000,000.00 |
| 10 | Providing an ATM machine for Panagamuwa City | 10 | 1406 | 5,000,000.00 |
| 11 | Initiation of a waste management project for Polwatta Division | 11 | 1406 | 3,000,000.00 |
| 12 | Development of the Polwatta main road up to Mr. Siraj's house | 12 | 200 | 2,000,000.00 |
| 13 | Providing toilet facilities for low-income earners | 13 | 8 | 8,000,000.00 |
| 14 | Renovation of Polgahawela Anvil | 14 | 30 | 6,000,000.00 |
| 15 | Repairing the drainage system on the Polwatta main road | 15 | 200 | 8,000,000.00 |
| 16 | Construction and improvement of houses for low-income people | 16 | 10 | 10,000,000.00 |
| 17 | Development of the road from Kovilalanda area to Udamulla Cemetery | 17 | 300 | 4,000,000.00 |
| 18 | Development of the road from in front of Mr. Lebbe's house in Nikapitiya to the end | 18 | 100 | 5,000,000.00 |
598 - Haliyamulla
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Construction of a service building in Haliyamulla Division | 1 | 900 | 2,500,000.00 |
| 2 | Providing equipment for those currently engaged in self-employment and those hoping to engage in it | 2 | 40 | 1,500,000.00 |
| 3 | Repairing the drainage system of the domain and removing garbage and waste | 3 | 225 | 1,000,000.00 |
| 4 | Formulating methods to prevent drug use, trafficking and transportation in the region | 4 | 30 | 500,000.00 |
| 5 | Setting up a water treatment plant | 5 | 850 | 1,000,000.00 |
| 6 | Concreting the necessary areas on the church road | 6 | 250 | 500,000.00 |
| 7 | Providing equipment to trained workers | 7 | 12 | 600,000.00 |
| 8 | Development of the road from near Manoramma's house in Nikapitiya to the Association Hall by constructing a culvert | 8 | 85 | 1,500,000.00 |
| 9 | Development of the road from Mr. Najeem's house to Mr. Ansar's house in Atikukulpitiya | 9 | 30 | 800,000.00 |
| 10 | Starting a vocational training center (near the rural bank) | 10 | 20 | 600,000.00 |
| 11 | Development of the Elhanpitiya Mountain Road | 11 | 30 | 800,000.00 |
| 12 | Development of wells near the Nikapitiya Sri Sitthi Vigneshwara Temple | 12 | 30 | 1,500,000.00 |
| 13 | Development of the drainage system in the housing scheme (near Mr. Asim's house) | 13 | 34 | 800,000.00 |
| 14 | Concreting the canal from near Mr. Kovilalande Rizmi's house to Mrs. Pathura's house | 14 | 38 | 1,000,000.00 |
| 15 | Development of the road from Aslam's house to Sameer Mohamed's house | 15 | 40 | 1,000,000.00 |
| 16 | Development of the required area of Hijra Mawatta | 16 | 350 | 800,000.00 |
| 17 | Starting beauty, cake, and sewing courses | 17 | 40 | 500,000.00 |
| 18 | Providing housing and sanitation needs | 18 | 6 | 2,000,000.00 |
| 19 | Providing a water extension from Hyeria's house to Pavmia's house | 19 | 30 | 1,000,000.00 |
| 20 | Providing street lamps for the side roads of the division | 20 | 750 | 1,500,000.00 |
| 21 | Development of the road from Hyeria's house to Pavmiya's house in Atakukulpitiya | 21 | 50 | 1,000,000.00 |
| 22 | Development of the required area on the road to the Nikapitiya Devalaya | 22 | 61 | 1,500,000.00 |
| 23 | Development of the irrigation canal near Panagamuwa Rural Bank | 23 | 92 | 1,000,000.00 |
| 24 | Development of Nikapitiya Bypass Road | 24 | 43 | 1,000,000.00 |
| 25 | Concreting from near Mr. Rahula's house in Atikukulpitiya to the public well | 25 | 35 | 1,500,000.00 |
| 26 | Development of the road from near Mr. Nihal Premasiri's house in Nikapitiya to Mr. Muthukumar's house | 26 | 51 | 800,000.00 |
| 27 | Transfer of land belonging to the Housing Development Authority to the Welfare Committee of the Housing Scheme | 27 | 60 | 0.00 |
| 28 | Development of the road from the main road to Annurpura | 28 | 50 | 2,000,000.00 |
| 29 | Development of Kovilanda Bypass Road (from near Mr. Pasil's house) | 29 | 28 | 1,000,000.00 |
| 30 | Development of the road near the Alhanpitiya Bakehouse | 30 | 41 | 1,500,000.00 |
| 31 | Building half-built houses | 31 | 20 | 2,000,000.00 |
599 - Kandegedara
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Development of necessary areas along the Deniyakotuwa - Baorowa Kandegedara to Elhenapitiya road with side walls, culverts, drainage system. | 1 | 450 | 5,000,000.00 |
| 2 | Taking necessary measures to prevent animal harm | 2 | 245 | 200,000.00 |
| 3 | Development of the Rajakanda Road. | 3 | 30 | 2,000,000.00 |
| 4 | Development of the Bisogalkanda Road | 4 | 35 | 1,500,000.00 |
| 5 | Development of Udamulla Cemetery Road | 5 | 120 | 2,000,000.00 |
| 6 | Development of the Udamulla to Galpihilla road | 6 | 100 | 2,000,000.00 |
| 7 | Construction of a community hall for Udamulla village | 7 | 380 | 3,500,000.00 |
| 8 | Installation of safe electrical cables for the electrical wiring system from Baorowa, Udamulla, to Kandegedara | 8 | 600 | 2,000,000.00 |
| 9 | Development of the road from opposite the Baoruwa Cooperative to the Community Hall | 9 | 150 | 1,500,000.00 |
| 10 | Reserving a cemetery for the Rajakanda village section | 10 | 28 | 0.00 |
| 11 | Sidewalling and construction of a chamber at Udumulla Cemetery | 11 | 380 | 3,500,000.00 |
| 12 | Renovation of the Kandegedara public well and construction of a side wall and protective cover | 12 | 170 | 2,500,000.00 |
| 13 | Development of the stone walkway through the cemetery | 13 | 75 | 1,500,000.00 |
| 14 | Development of the Garadiella Yaya Agricultural Road | 14 | 100 | 2,000,000.00 |
| 15 | Renovation of the Meegaslanda Anvil at Baoruwa Yaya | 15 | 100 | 2,500,000.00 |
| 16 | Development of the Pihilikumbura road to Koskotuwa | 16 | 70 | 1,500,000.00 |
| 17 | Provision of water supply extension from Mahagama to Udamulla by the Water Supply Board | 17 | 150 | 2,500,000.00 |
| 18 | Development of the Baoruwaiya Alaweli | 18 | 100 | 1,500,000.00 |
| 19 | Providing technical knowledge, training, financial assistance and market development for mushroom cultivation | 19 | 5 | 11,000,000.00 |
| 20 | Implementing an animal husbandry project targeting needy families as self-employment | 20 | 10 | 1,500,000.00 |
| 21 | Preparing a shed for coir rice production | 21 | 15 | 2,000,000.00 |
| 22 | Providing sewing machines and credit facilities to develop entrepreneurs | 22 | 10 | 3,000,000.00 |
600 - Ranthetikanda
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Development of landslide sites in the Ilukathenna section of the Ranthetikanda road | 1 | 288 | 5,000,000.00 |
| 2 | Development of necessary areas on the main road leading to Ranthetikanda village | 2 | 288 | 5,000,000.00 |
| 3 | Taking relevant measures to prevent damage to wild animals (Rila squirrels) | 3 | 288 | 500,000.00 |
| 4 | Development of the access road to Ranthetikanda Cemetery | 4 | 288 | 2,000,000.00 |
| 5 | Renovation of the teacher's house at Ranthetikanda Primary School | 5 | 288 | 1,500,000.00 |
| 6 | Construction of a side wall in front of the main hall of Ranthetikanda College | 6 | 288 | 2,000,000.00 |
| 7 | Development of Rajakanda Road | 7 | 288 | 2,000,000.00 |
| 8 | Construction of a side wall for the safety of the Dharma Hall and the road | 8 | 288 | 1,500,000.00 |
| 9 | Identifying and preserving landslide-prone areas in the region | 9 | 50 | 1,000,000.00 |
| 10 | Development of the road from near Mr. Upali's house in Udagama to Mr. Surasena's house | 10 | 20 | 2,000,000.00 |
| 11 | Development of the road from Gonamada to Janawasama | 11 | 15 | 150,000.00 |
| 12 | Development of the village council footpath from near the temple to the Ambagahamula bend using steps | 12 | 288 | 1,000,000.00 |
| 13 | Development of the road from near the temple to Galahabadahena via the Samithi Hall | 13 | 15 | 1,000,000.00 |
| 14 | Construction of a side wall for the protection of the pagoda courtyard | 14 | 288 | 1,500,000.00 |
| 15 | Development of the road from near the school to Mr. Susil's house | 15 | 30 | 1,500,000.00 |
| 16 | Providing sewing equipment for Mrs. W.G. Sumanawathi | 16 | 1 | 200,000.00 |
| 17 | Providing a dehydrator to Mr. T.D. Dhanushka Kelum for drying domestic export crops | 17 | 1 | 200,000.00 |
| 18 | Providing a set of carpentry tools to Mr. T.D. Ajithlal | 18 | 1 | 200,000.00 |
| 19 | Providing a set of carpentry tools to Mr. TD Sudesh Lakshan | 19 | 1 | 200,000.00 |
| 20 | Construction of a protective wall to prevent OG Siriwardena's house from being encroached upon | 20 | 5 | 1,000,000.00 |
601 - Ogodapola
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Renovation of the dilapidated bridge across the entrance road to the Upper Ogodapola Temple | 1 | 1000 | 2,000,000.00 |
| 2 | Development of the remaining section of the Ogodapola Cemetery Road to completion | 2 | 1150 | 4,000,000.00 |
| 3 | Carpeting of Ogodapola main road | 3 | 900 | 25,000,000.00 |
| 4 | Carpeting of the section of the Hentenna road up to the bridge | 4 | 1500 | 10,000,000.00 |
| 5 | Obtaining a purification plant for Ogodapola drinking water needs | 5 | 1255 | 5,000,000.00 |
| 6 | Surveying all roads belonging to the Pradeshiya Sabha | 6 | 1255 | 200,000.00 |
| 7 | Preparing the electrical extension from Lower Ogodapola to Upper Ogodapola using black wire | 7 | 850 | 1,000,000.00 |
| 8 | Construction of a bridge across the Nelaulla Canal, connecting the Cemetery Road and Nelaulla Road | 8 | 1150 | 10,000,000.00 |
| 9 | Obtaining drinking water needs for 50 families in the Upper Ogodapola area | 9 | 150 | 2,500,000.00 |
| 10 | Transferring the Ogodapola Tank to the government for development and concreting the dam | 10 | 200 | 2,500,000.00 |
| 11 | Effective use of the Ogodapola Clinic Center | 11 | 1255 | 100,000.00 |
| 12 | Conducting drug prevention programs | 12 | 1255 | 200,000.00 |
| 13 | Concreting of the Pahala Ogodapola Ambagaha Kumbura road | 13 | 50 | 2,000,000.00 |
| 14 | Development of the entrance road to the Upper Ogodapola Temple | 14 | 1050 | 1,000,000.00 |
| 15 | Implementing an animal husbandry project targeting needy families as self-employment | 15 | 75 | 4,000,000.00 |
| 16 | Renovation of Ogodapola Anvil and its Dams | 16 | 250 | 1,500,000.00 |
| 17 | Developing the remaining part of the temple road | 17 | 1075 | 1,500,000.00 |
| 18 | Installation of street lights in necessary places in Ogodapola Division and renovation of existing ones | 18 | 1255 | 200,000.00 |
| 19 | Development of the road from near Ogodapola tank towards Ranthetikanda road and towards Upper Ogodapola | 19 | 850 | 3,000,000.00 |
| 20 | Development of the road in front of the clinic center | 20 | 1255 | 1,500,000.00 |
| 21 | Concreting of necessary areas on the Dehigolla Pitiya road | 21 | 70 | 2,000,000.00 |
| 22 | Development of Katupiti Wattha Road | 22 | 45 | 2,000,000.00 |
| 23 | Construction of drainage system at Ogodapola College playground | 23 | 750 | 2,500,000.00 |
| 24 | Construction of a volleyball court on the community hall grounds | 24 | 750 | 1,000,000.00 |
| 25 | Development of the road to Ilukathenna via Dematawatta | 25 | 10 | 200,000.00 |
| 26 | Streamlining and streamlining the waste collection system of the Pradeshiya Sabha | 26 | 850 | 100,000.00 |
| 27 | Construction of a road to the Kotuhena village area | 27 | 18 | 3,000,000.00 |
602 - Nelawulla
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Development of the agricultural road from Kongahamula to Mukalanhena | 1 | 80 | 1,500,000.00 |
| 2 | Widening and carpeting of the road from Ogodapola Junction to Nelawulla Wattha Wattha | 1 | 750 | 25,000,000.00 |
| 3 | Development of necessary areas along the Nelawullawatte Donation Road up to Mrs. Charitha Gamlath's shop | 2 | 160 | 6,000,000.00 |
| 4 | Development of the road from near Mr. Dayanandasiri's house to Mr. Janaka's house | 3 | 55 | 7,000,000.00 |
| 5 | Development of the road from Kon Gaha Mul to Medagala | 4 | 80 | 7,000,000.00 |
| 6 | Development of necessary areas on the road from Pettah Junction to Hapugasthenna | 5 | 75 | 3,000,000.00 |
| 7 | Construction of a dam to retain water in the Nelawulla estate and construction of canal dams to transport that water to the paddy fields | 6 | 850 | 20,000,000.00 |
| 8 | Development of the road from Meegaha Mulahena to Amunahena with the side embankment | 7 | 450 | 3,000,000.00 |
| 9 | Development of the road from near the temple to Pallekanda | 8 | 60 | 3,500,000.00 |
| 10 | Development of Udalida Road up to Belek Gedera | 9 | 20 | 4,000,000.00 |
| 11 | Construction of a water treatment plant for the Diya Suwa Community-Based Drinking Water Project | 10 | 90 | 7,000,000.00 |
| 12 | Development of the road from near the transformer to the cemetery | 11 | 210 | 7,000,000.00 |
| 13 | Development of the road from near the shop to Mr. Eranga's house | 12 | 30 | 2,000,000.00 |
| 14 | Providing land to farmers for Nelawulla estate cultivation | 13 | 85 | 1,000,000.00 |
| 15 | Preventing animal damage | 14 | 700 | 1,000,000.00 |
| 16 | Animal control | 15 | 11 | 2,000,000.00 |
| 17 | Providing the necessary technical knowledge and equipment for self-employment | 16 | 15 | 1,000,000.00 |
| 18 | Development of the access road to the Dombagahamada rice field | 17 | 35 | 2,000,000.00 |
| 19 | Renovation of Hikmuna Anvil | 18 | 30 | 2,000,000.00 |
| 20 | Development of the dam from Paragahapotawa Amune to the middle of the village | 19 | 45 | 2,500,000.00 |
| 21 | Development of the Udakanda road from near the shop | 20 | 30 | 3,000,000.00 |
| 22 | Developing housing and sanitation facilities for low-income families | 21 | 35 | 7,000,000.00 |
| 23 | Development of the road from near the school to Mr. Lionel's house | 22 | 20 | 9,000,000.00 |
| 24 | Development of the Niyangolla Road | 23 | 5 | 10,000,000.00 |
| 25 | Replacing aluminum electrical wires with wire bundles in Nalawulla Division | 24 | 550 | 5,000,000.00 |
| 26 | Obtaining the necessary equipment for coconut oil production | 25 | 1 | 500,000.00 |
| 27 | Providing agricultural equipment at subsidized prices | 26 | 65 | 8,000,000.00 |
| 28 | Installation of street lights in the required locations in Nelawulla Division | 27 | 500 | 700,000.00 |
603 - Rambadagalla
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Development of the road from Rambadagalle Junction to Waduressa | 1 | 250 | 5,000,000.00 |
| 2 | Development of the road behind the courthouse to Gamakanda | 2 | 160 | 1,000,000.00 |
| 3 | Development of Jayamawata Road up to Beeriwewa Road | 3 | 250 | 3,000,000.00 |
| 4 | Construction of a new Dhamma School building at the Rambadagalle Raja Maha Viharaya | 4 | 652 | 2,000,000.00 |
| 5 | Development of the remaining section of the Rambadagalle-Gedarawela road | 5 | 60 | 2,000,000.00 |
| 6 | Suppression of drug trafficking and trafficking | 6 | 176 | 200,000.00 |
| 7 | Construction of the Eriyagahamula Canal embankment | 7 | 150 | 1,000,000.00 |
| 8 | Development of the road from Jaya Mawatha to Ruddagoda Watta | 8 | 150 | 3,000,000.00 |
| 9 | Construction of necessary places and side embankments on the Ramibadagala-Ihalagama road | 9 | 70 | 2,500,000.00 |
| 10 | Development of the Walakumbura Road | 10 | 25 | 3,000,000.00 |
| 11 | Providing equipment, training, and capital for enterprise development | 11 | 8 | 1,000,000.00 |
| 12 | Development of a public kitchen behind the Matiala Watta Bakery | 12 | 30 | 500,000.00 |
| 13 | Developing the Rambadagalle Tank and Agricultural Canal and establishing freshwater fish farming | 13 | 30 | 1,500,000.00 |
| 14 | Repair of the broken sidewall of the road from Rambadagalle School to Matiyalawatta | 14 | 26 | 3,000,000.00 |
| 15 | Development of the road in the middle of the village of Beeriwewa | 15 | 268 | 3,000,000.00 |
| 16 | Ura Fort Public Well Development | 16 | 15 | 500,000.00 |
| 17 | Development of the Rambadagalle Ihalagama Cemetery Road | 17 | 260 | 1,500,000.00 |
| 18 | Development of Rambodagalle Market near the housing scheme | 18 | 15 | 500,000.00 |
| 19 | Development of the remaining section of the Alhempitiya road | 19 | 18 | 2,500,000.00 |
604 - Nahalla
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Construction of a service building for Nahalla Division | 1 | 1819 | 7,500,000.00 |
| 2 | Construction of a water control dam for the Deduru Canal on the road to the Nelligala Temple | 2 | 50 | 2,500,000.00 |
| 3 | Development of the Delwita to Kaduboda road | 3 | 150 | 2,000,000.00 |
| 4 | The Katupilagolla road, from opposite Pallemulla house on the Nahalla-Katupilagolla road, has been developed by constructing a culvert. | 4 | 70 | 2,500,000.00 |
| 5 | Development of the Nahalla Hagarankotawa Cemetery | 5 | 30 | 2,000,000.00 |
| 6 | Development of the Godadalupothe Vendesi Estate Road using culverts | 6 | 30 | 2,000,000.00 |
| 7 | Development of the side road leading to the Polkumbura Embalawa Cemetery | 7 | 70 | 1,000,000.00 |
| 8 | Development of the road from Kaduboda Road to Samurdhi Lidh | 8 | 50 | 1,000,000.00 |
| 9 | Providing tools and promoting self-employment for those currently self-employed | 9 | 20 | 1,000,000.00 |
| 10 | Development of the Nelligala Mountain Road | 10 | 50 | 3,000,000.00 |
| 11 | Construction of houses for low-income earners | 11 | 15 | 1,000,000.00 |
| 12 | Providing electricity to low-income earners | 12 | 2 | 500,000.00 |
| 13 | Providing toilets for low-income families | 13 | 4 | 500,000.00 |
| 14 | Development of the road from Katupilagolla Junction through the middle of Wela to Gamakanda | 14 | 30 | 2,000,000.00 |
| 15 | Development of the Nelligala Mountain-Kongaha Mula Road | 15 | 50 | 2,000,000.00 |
| 16 | Construction of the Shaila Bimmaramaya Temple | 16 | 50 | 1,000,000.00 |
| 17 | Development of the side road from Delwiwita Road to Keppitigala Road in front of Mr. Susantha's house | 17 | 150 | 1,000,000.00 |
| 18 | Development of Nahalla Public Library | 18 | 30 | 500,000.00 |
| 19 | Development of the road in the Katupilagollanaya area | 19 | 30 | 2,000,000.00 |
| 20 | Preparation of the canal leading to the lower paddy fields cultivated under the Polkukkumbura tank | 20 | 60 | 3,000,000.00 |
| 21 | Development of Nahallamunai Ela Dam | 21 | 30 | 1,500,000.00 |
| 22 | Deduru Oya Water Project inaugurated | 22 | 800 | 10,000,000.00 |
| 23 | Development of the by-pass road from Hagarankotawa to Madithiyawa | 23 | 75 | 3,000,000.00 |
| 24 | Development of public well and road near Polkumbura Lake | 24 | 20 | 1,000,000.00 |
| 25 | Development of the road from Polkumbura Gamini's house in front of Peiris' house to Kaduboda Road | 25 | 15 | 1,500,000.00 |
| 26 | Development of the side road running from near Mrs. Gaya's house | 26 | 15 | 1,000,000.00 |
| 27 | Development of the culvert leading from near the Sagalpura residence to the paddy fields below | 27 | 15 | 1,000,000.00 |
| 28 | Developing the remaining part of Samagi Mawatha | 28 | 20 | 2,000,000.00 |
| 29 | Development of Nahalla Warellagolla Colony Road | 29 | 20 | 2,000,000.00 |
| 30 | Development of Katupilagolla Kabulagoda Road | 30 | 15 | 1,000,000.00 |
| 31 | Development of the Hettiyawatta road from Mrs. Karunathi's house with carpeting | 31 | 120 | 5,000,000.00 |
| 32 | Agricultural road from Polkumbura Junction to Olagama Junction | 32 | 15 | 1,000,000.00 |
| 33 | Development of the road from Embalawa Society Hall to Deduru Oya | 33 | 65 | 2,000,000.00 |
| 34 | Development of the remaining section of the Polkumbura Dam Road | 34 | 110 | 1,000,000.00 |
| 35 | Development of the road leading to Shailabimbarama | 35 | 30 | 1,000,000.00 |
| 36 | Development of the Embalawa-Kuratiyawatta road | 36 | 50 | 2,000,000.00 |
| 37 | Construction of a Milko Milk Purchasing Center | 37 | 5 | 1,000,000.00 |
| 38 | Providing tools and promoting self-employment for those currently self-employed | 38 | 20 | 1,000,000.00 |
| 39 | Developing a systematic program to market agricultural products | 39 | 30 | 1,000,000.00 |
| 40 | Developing animal husbandry programs | 40 | 10 | 1,000,000.00 |
| 41 | Developing a drug prevention program | 41 | 800 | 1,000,000.00 |
| 42 | Construction of a fertilizer warehouse for the Samagi Farmers' Association | 42 | 150 | 2,000,000.00 |
| 43 | Construction of an IT center | 43 | 200 | 3,000,000.00 |
| 44 | Establishing a community hall and volleyball court for the auction estate | 44 | 40 | 3,000,000.00 |
| 45 | Setting up a storage room to store the equipment owned by the water association | 45 | 102 | 2,000,000.00 |
| 46 | The existing volleyball court has been renovated into a day and night court. | 46 | 50 | 1,000,000.00 |
| 47 | Renovation of the Embalawa Tank | 47 | 60 | 1,000,000.00 |
| 48 | Introducing a cinnamon cultivation project for the Nahalla season | 48 | 100 | 500,000.00 |
| 49 | Renovation of the Youth Society building on Nelligala Temple Road | 49 | 50 | 1,000,000.00 |
605 - Olagama
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Implementing a drinking water project | 1 | 450 | 8,000,000.00 |
| 2 | Development of the culvert on the main road from Olagama to Gama Kanda | 2 | 600 | 3,500,000.00 |
| 3 | Construction of a cross-dam on the Papolapitiya Canal | 3 | 35 | 1,000,000.00 |
| 4 | Development of the road from near the Gama Kanda Temple to Mr. Ranji's house | 4 | 30 | 3,000,000.00 |
| 5 | Development of the road from near the house of Mrs. Araba Renuka, Polgolla to Ritigahawatta | 5 | 50 | 2,000,000.00 |
| 6 | Development of the road from near Visakha Meheni Monastery to Rubber Estate | 6 | 40 | 2,500,000.00 |
| 7 | Development of the wooden Kolagala road | 7 | 34 | 2,000,000.00 |
| 8 | Creating self-employment opportunities for unemployed women in Olagama Division | 8 | 40 | 1,200,000.00 |
| 9 | Stone carving from the entrance of Gamakanda Visuddharama Temple to the Bodhi courtyard | 9 | 600 | 1,000,000.00 |
| 10 | Development of the road from near Mr. Sunil's house to Werella Golla | 10 | 30 | 3,500,000.00 |
| 11 | Development of the Eriyagahawatte road from near Mr. Rane's house at the top of the hill | 11 | 25 | 3,500,000.00 |
| 12 | Providing desks for children at Wimaladharma Dhamma School, Olagama | 12 | 40 | 2,000,000.00 |
| 13 | Providing equipment and loans to promote Mrs. B.D. Leelawathi's poultry farming project | 13 | 1 | 500,000.00 |
| 14 | Development of the road from near Visakha Meheni Monastery to Rubber Estate | 14 | 270 | 2,500,000.00 |
| 15 | Developing the remaining portion of the Hawandana Road | 15 | 40 | 3,500,000.00 |
| 16 | Development of the canal that supplies water to the Galpotthawa paddy fields | 16 | 35 | 2,000,000.00 |
| 17 | Construction of the side wall of the Vishuddharama Temple | 17 | 600 | 3,000,000.00 |
| 18 | Construction of a side wall on the road near the house of Mr. A.D. Suminda Kumara Nandasiri | 18 | 40 | 3,500,000.00 |
| 19 | Development of Gamakanda Road from near Mr. A.D. Wimalaratne's house | 19 | 60 | 4,000,000.00 |
| 20 | Construction of a box culvert on the Dahanakgahahena Canal | 20 | 40 | 1,500,000.00 |
| 21 | Providing electricity to the Rambadagalle Sub-District Office | 21 | 800 | 50,000.00 |
| 22 | Construction of a well to obtain drinking water at the Rambadagalle Cattle Breeding Center | 22 | 1500 | 1,200,000.00 |
606 - Rambukandana
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Development of Maussapitiya Road with side roads | 6 | 250 | 3,000,000.00 |
| 2 | Development of Welikumbura main road with side roads | 10 | 350 | 3,000,000.00 |
| 3 | Development of Eluwalanda Road with side roads | 14 | 150 | 5,000,000.00 |
| 4 | Development of Henamulla Road with Interstate Roads | 7 | 85 | 3,000,000.00 |
| 5 | Development of the road leading to Mr. Nizabidin's house | 22 | 35 | 3,000,000.00 |
| 6 | Development of the road leading from Kumburulena Temple main road towards Mr. Lahiru's house | 21 | 25 | 1,000,000.00 |
| 7 | Development of Vidana Mawatha Road | 28 | 20 | 3,000,000.00 |
| 8 | Development of the road leading to Mr. Suheibu's house | 19 | 50 | 3,000,000.00 |
| 9 | Development of the road in front of the Jumma Mosque | 29 | 50 | 500,000.00 |
| 10 | Development of the Rambukankotuwa road | 13 | 100 | 3,500,000.00 |
| 11 | Developing the road to Mr. Ansar's house | 16 | 15 | 1,000,000.00 |
| 12 | Development of side roads on the EAG Office Road | 25 | 50 | 2,000,000.00 |
| 13 | Development of the road leading to Nisrullah's house | 15 | 30 | 4,000,000.00 |
| 14 | Alhuda School Road Development | 9 | 650 | 3,000,000.00 |
| 15 | Providing toilet facilities to Rasida Mahatami | 17 | 5 | 100,000.00 |
| 16 | Providing drinking water and electricity to preschools | 4 | 40 | 2,000,000.00 |
| 17 | Water Resources Board extends water supply to six houses in Maussapitiya | 20 | 25 | 1,000,000.00 |
| 18 | Construction of a house for Mr. T. Alavidin | 34 | 3 | 1,000,000.00 |
| 19 | Construction of a house for Mr. S. Vijaya Kumar | 31 | 5 | 1,000,000.00 |
| 20 | Construction of a house for Mrs. Maheshwari | 32 | 5 | 1,000,000.00 |
| 21 | Providing water to the roads leading to WordVision | 33 | 30 | 1,000,000.00 |
| 22 | Providing equipment for Mr. T. Alavidin's confectionery production | 11 | 3 | 200,000.00 |
| 23 | Providing equipment for the production of sweets by Mrs. A.M.I. Kumarihamy | 12 | 2 | 100,000.00 |
| 24 | Provision of transformers on the Rambukandana Magaspitiya road (for plastic workshops) | 8 | 20 | 5,000,000.00 |
| 25 | Construction of the Ihaga Malaya of the Pre-School and development of it as a multi-purpose building | 21 | 30 | 200,000.00 |
| 26 | Taking appropriate measures to prevent erosion of Deduru Oya | 24 | 20 | 2,000,000.00 |
| 27 | Providing farming equipment to Rahumath Farmers' Organization | 18 | 50 | 200,000.00 |
| 28 | Build a side wall to divert water from the paddy field | 27 | 50 | 2,000,000.00 |
| 29 | Renovation of the channels through which water flows from the lake | 1 | 100 | 1,000,000.00 |
| 30 | Construction of fence and repair of gates at Ridi Vihara Vidyalaya | 3 | 700 | 3,000,000.00 |
| 31 | Repair of the toilet system in the primary section of Riddhivihara College | 26 | 250 | 1,000,000.00 |
| 32 | Development and renovation of the playground at Riddhivihara Vidyalaya | 30 | 700 | 1,000,000.00 |
| 33 | Construction of a main water tank using poles (Rideevihara College) | 5 | 700 | 1,000,000.00 |
| 34 | Developing the drainage system in the middle of the school at Alhuda Muslim College as needed | 2 | 700 | 2,000,000.00 |
| 35 | Construction of a 90*25 three-storey building for Ridvihara College | 36 | 600 | 1,500,000.00 |
| 36 | Repairing and constructing the main gate and guardhouse of the school and developing the surrounding area by laying paving stones (Alhuda Muslim College) | 35 | 600 | 2,000,000.00 |
| 37 | Development of the main hall of the Ridvihara | 37 | 700 | 1,000,000.00 |
| 38 | Preparation of the primary section assembly ground and playground at Ridvihara Vidyalaya | 38 | 250 | 3,000,000.00 |
| 39 | Renovation of old buildings at Ridvihara College | 39 | 700 | 1,000,000.00 |
| 40 | Construction of an assembly hall and a two-storey building for Ridvihara Maha Vidyalaya | 40 | 700 | 10,000,000.00 |
| 41 | Gravel laying for the remaining parts of the yard of the Ridigama Divisional Office | 41 | 50 | 200,000.00 |
| 42 | Construction of a public toilet at the Ridigama Divisional Office | 42 | 50 | 200,000.00 |
607 - Hunugalkadulla
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Development of the road from Alakolamada to Morathiha School. | 1 | 600 | 2,000,000.00 |
| 2 | Development of necessary areas on the Perawatta road from near the engineering office. | 4 | 600 | 2,000,000.00 |
| 3 | Development of the necessary areas of the by-road running from near the Mahaiyawa Community Hall to Mayammulla. | 5 | 450 | 1,000,000.00 |
| 4 | Development of the road from near Mr. Sugath Kumara's house to Mr. Pathmakumara's house. | 6 | 300 | 1,000,000.00 |
| 5 | Development from near Mr. Susantha Gamini's house to the canal road. | 11 | 200 | 1,500,000.00 |
| 6 | Development from near Mrs. Hema's house to the canal road. | 8 | 250 | 2,000,000.00 |
| 7 | Development of the road from near Mr. Thushara's house to Bakkarawatte. | 7 | 200 | 1,500,000.00 |
| 8 | Extension of the Ridigama urban water supply system to Kavisigamuwa. | 9 | 350 | 3,500,000.00 |
| 9 | Drug prevention. | 10 | 600 | 2,000,000.00 |
| 10 | Crossing the Walpola Canal and constructing an anvil near Hewana to provide water to the Galpogu farm. | 13 | 200 | 2,500,000.00 |
| 11 | Development of the Mahaiyawa playground. | 3 | 500 | 1,000,000.00 |
| 12 | Providing finance, equipment and training for self-employment and small business development. | 2 | 30 | 5,000,000.00 |
| 13 | Implementing an animal control project. | 22 | 20 | 3,000,000.00 |
| 14 | Development of the Kottakella Bypass Road. | 14 | 150 | 1,500,000.00 |
| 15 | Development of the road from near Mr. P.G. Jayaratne's house to Mr. Jayasinghe's house in Labuhena. | 15 | 150 | 2,000,000.00 |
| 16 | Development of the canal near the Ketlagolla Yaya farm. | 12 | 150 | 2,000,000.00 |
| 17 | Development of the road from near Prabath Garment to Mr. Wickramarachchi's house | 16 | 80 | 1,500,000.00 |
| 18 | Development of the remaining parts from near Mr. Balasuriya's house. | 20 | 150 | 2,000,000.00 |
| 19 | Development and provision of equipment to Sri Siddhartha Dhamma School. | 17 | 600 | 1,000,000.00 |
| 20 | Development of the road from near Mr. Sunil Ratnayake's house to Mr. Sarath's house. | 18 | 150 | 2,000,000.00 |
| 21 | Providing a water pump to the Pubudu Farmers' Organization to obtain water for the temple paddy fields. | 21 | 300 | 3,000,000.00 |
| 22 | Construction of side walls at places where houses are damaged along the Perawatta Canal. | 19 | 150 | 3,000,000.00 |
608 - Morathiha
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | New construction of Bambaragala Bridge | 1 | 30 | 8,000,000.00 |
| 2 | Development of the Pallegedara village road. | 2 | 30 | 1,500,000.00 |
| 3 | Concreting of the Morathiha Thisahara Meegaha Kumbura road. | 10 | 20 | 700,000.00 |
| 4 | Development of the road from near Mr. Balasuriya's house to Bambaragala | 11 | 25 | 2,000,000.00 |
| 5 | Development of the road leading to the school around the Morathiha cemetery. | 12 | 20 | 2,000,000.00 |
| 6 | Development of the Idalapitiya road. | 14 | 15 | 1,000,000.00 |
| 7 | Construction of safety fences for unsafe areas on the Hunugalkadulla-Katupilagolla main road. | 18 | 349 | 1,500,000.00 |
| 8 | Providing agricultural equipment needed for upland farming. | 20 | 15 | 400,000.00 |
| 9 | Providing equipment for home-based industries and self-employment. | 8 | 45 | 1,500,000.00 |
| 10 | Implementation of dairy cattle, poultry and goat management projects | 17 | 15 | 1,500,000.00 |
| 11 | Providing vocational training courses and NVQ certificates to those engaged in the carpentry, masonry and wiring industries in the region. | 21 | 12 | 400,000.00 |
| 12 | Developing sports facilities for children and youth with the aim of drug prevention. | 4 | 100 | 200,000.00 |
| 13 | Construction of a cemetery for the Thirty-Four Cemetery. | 5 | 349 | 1,000,000.00 |
| 14 | Providing an electric water motor and electricity for the Praja Shakthi Water Scheme. | 6 | 122 | 300,000.00 |
| 15 | Construction of side walls on both sides of the Naranggaha Canal from near the Dimuthu Pre-School in Morathiha. | 13 | 20 | 4,000,000.00 |
| 16 | Construction of the water tank at Morathiha School. | 3 | 113 | 800,000.00 |
| 17 | Concreting the dam leading to the Gedarwela paddy field. | 9 | 30 | 1,000,000.00 |
| 18 | Implementing a public transport service through Morathiha village. | 7 | 1425 | - |
| 19 | Using water from the Walpola Canal, a Meegaha paddy field was constructed to provide water to the Galpothu farm. | 15 | 30 | 3,000,000.00 |
| 20 | Construction of the side wall of the Erabadu Gaha Liyada Dam in Pallekottowa. | 16 | 15 | 1,000,000.00 |
| 21 | Construction of a toilet and latrines system at Morathiha College. | 19 | 113 | 2,000,000.00 |
609 - Gabadagama
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Development of the road from Kongahamulahena to Udamulla | 1 | 60 | 3,000,000.00 |
| 2 | Construction of a side wall for the road near Gunasekaramahatha's shop in Ambagahakumbura | 2 | 90 | 2,000,000.00 |
| 3 | Development of the Pitavane Canal of the Narangaha Tank | 3 | 150 | 2,000,000.00 |
| 4 | Directing the youth to professional sectors and sports to free them from the dangers of drugs | 4 | 100 | 6,000,000.00 |
| 5 | Construction of a safety fence for the bridge near the temple | 5 | 900 | 1,000,000.00 |
| 6 | Development of the remaining sections of the Old Temple Road from Ambagahakumbura Road | 6 | 80 | 2,000,000.00 |
| 7 | Development of the remaining sections of the road from near Morathiha Lake to Bogahalanda via the Yaeralugaspitiya | 7 | 160 | 2,000,000.00 |
| 8 | Renovation of the library building. | 8 | 700 | 1,000,000.00 |
| 9 | Implementation of animal husbandry projects in the domain (beekeeping) | 9 | 20 | 500,000.00 |
| 10 | Water supply for homes from Thalakolawatta to Udumulla through the Community Water Project | 10 | 50 | 3,000,000.00 |
| 11 | Development of existing entrepreneurs and provision of necessary equipment. | 11 | 12 | 1,500,000.00 |
| 12 | Introducing new entrepreneurship courses and providing the necessary financial support and equipment for them. | 12 | 15 | 700,000.00 |
| 13 | Construction of embankment near Kongahamula Bridge | 13 | 70 | 1,000,000.00 |
| 14 | Promoting the cultivation of minor export crops | 14 | 20 | 800,000.00 |
| 15 | Implementing education and training programs for senior citizens | 15 | 60 | 100,000.00 |
| 16 | Cutting and developing the road leading to Vijayapura Estate | 16 | 100 | 7,000,000.00 |
| 17 | Developing Vijayapura Estate as a model farm and promoting tourism | 17 | 100 | 9,000,000.00 |
| 18 | Getting a public transportation service for the village | 18 | 1000 | 200,000.00 |
| 19 | Streamlining the electrical wiring system within the domain | 19 | 370 | 1,000,000.00 |
| 20 | Implementing tree planting programs within the domain | 20 | 380 | 100,000.00 |
610 - Kawisigamuwa
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Development of the side embankment on the road leading to Kavisigamuwa Primary School. | 1 | 2000 | 3,000,000.00 |
| 2 | Drug prevention. | 2 | 150 | 500,000.00 |
| 3 | Development of the remaining sections of the Bollagala road. | 3 | 200 | 3,000,000.00 |
| 4 | Development of the Kavisigamuwa Cemetery Road. | 4 | 100 | 1,500,000.00 |
| 5 | Construction of a new building to replace the dilapidated old building at Kavisigamuwa Primary School. | 5 | 600 | 3,000,000.00 |
| 6 | Developing the Pallegama Anvil and preparing the dam system. | 6 | 150 | 2,000,000.00 |
| 7 | Construction of a concrete cover for the canal that passes through the grounds of Sri Gamini Central College. | 7 | 1600 | 2,000,000.00 |
| 8 | Development of the road from near the Kavisagama Sri Sudharmarama Viharaya to the Boraluwa Auction Estate. | 8 | 200 | 3,000,000.00 |
| 9 | Construction of the side wall on the road leading to the Sri Sudharmarama Temple in Kavisagamuwa. | 9 | 500 | 2,000,000.00 |
| 10 | Development of the side road running near the Kavisigamuwa Hardware. | 10 | 75 | 1,500,000.00 |
| 11 | Renovating the roof of Sri Sudarshanarama Dhamma School and providing equipment to the Dhamma School. | 11 | 150 | 1,500,000.00 |
| 12 | Providing training, credit facilities and equipment to uplift entrepreneurs | 12 | 20 | 2,000,000.00 |
| 13 | Establishing an animal control project for the domain | 13 | 10 | 2,000,000.00 |
| 14 | Providing air rifles to farmers' organizations to prevent wildlife damage | 14 | 10 | 500,000.00 |
| 15 | Development of the Bollegala-Labuhena bypass road. | 15 | 200 | 2,000,000.00 |
| 16 | Development of the side embankment of the Udagama Gallindawatta road. | 16 | 75 | 1,000,000.00 |
| 17 | Development of the remaining sections of the Uyanwatte Road. | 17 | 100 | 1,500,000.00 |
| 18 | Construction of an outdoor stage at Kavisigamuwa Primary School. | 18 | 600 | 2,500,000.00 |
| 19 | Construction of a building for the Udagama Welfare Society. | 19 | 75 | 1,500,000.00 |
| 20 | Construction of a service pavilion at the Sri Sudarshanaramaya Temple. | 20 | 1200 | 2,000,000.00 |
611 - Dedurunadeegama
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Completion of the remaining work on the safety fence at the Migasthanna Sports Ground | 3 | 150 | 1,000,000.00 |
| 2 | Construction of a multi-purpose building for Migasthenna Temple | 5 | 250 | 5,000,000.00 |
| 3 | Renovation of water tanks in the water project and implementation of a water extension | 6 | 400 | 3,000,000.00 |
| 4 | Construction of a bund for the canal near Mrs. H.G. Nandawathi's house | 8 | 50 | 2,000,000.00 |
| 5 | Development of the remaining section of the Dedurenadigama Kakanath Road | 9 | 460 | 1,000,000.00 |
| 6 | Development of the road to Kemanhetha Canal near the Tenth House | 10 | 160 | 2,000,000.00 |
| 7 | Development of the road from near Mr. D.D. Somarathka's house to Mr. S.D. Sethu's house | 11 | 100 | 2,000,000.00 |
| 8 | Construction of a culvert near Mr. Amala's garage | 12 | 150 | 2,000,000.00 |
| 9 | Development of the road from Mr. Narasinghe's house to Asala Oya | 13 | 150 | 2,000,000.00 |
| 10 | Concreting of Mr. S.R.G. Wickramarachchi's house from SALA to Mr. Gemunu Tangalle's house | 14 | 150 | 2,000,000.00 |
| 11 | Development of the remaining section of the road from near Mrs. Chithra Wijesuriya's house | 15 | 150 | 2,000,000.00 |
| 12 | Repair of the houses of J.L. Jayasekara, R.D. Dilshan, Kosala, and W.D. Jayaratne. | 16 | 20 | 7,000,000.00 |
| 13 | Repair of the drain leading from Migasthenna Temple to the bridge | 17 | 100 | 1,000,000.00 |
| 14 | Repair of the culvert on the SAA road at Mrs. Inoka's house | 18 | 20 | 100,000.00 |
| 15 | Development of the road from Mr. W.G. Piyadasa's house in Dedurunadigama to Mr. Podi Appu's house | 19 | 150 | 2,000,000.00 |
| 16 | Reconstruction of the culvert on the road from near Mr. R.D. Munasinghe's house | 20 | 50 | 1,500,000.00 |
| 17 | Construction of a toilet for the Dedurunadi Village Mortuary Aid Society Hall | 21 | 150 | 1,000,000.00 |
| 18 | Providing innovative machinery and equipment to empower entrepreneurs | 4 | 20 | 200,000.00 |
| 19 | Drug prevention | 1 | 200 | 0.00 |
| 20 | Providing musical instruments for the Dedurunadigama Elders' Association | 22 | 110 | 200,000.00 |
| 21 | Taking further steps to take over the cemetery | 7 | 500 | 0.00 |
| 22 | Providing new technology and machinery for planting turmeric in home gardening | 23 | 50 | 500,000.00 |
| 23 | Providing vocational education to children after completing school education | 2 | 25 | 0.00 |
612 - Kukurumahana
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | The road from near Meegasthenna Temple to Mogoda Badagane is being developed from near Mr. Wijesinghe's house. | 4 | 400 | 2,000,000.00 |
| 2 | Construction and development of a culvert on the Wela Meda road from near Meegasthenna Temple to Mogoda Badagane. | 5 | 400 | 500,000.00 |
| 3 | Extending and developing the side wall of the commercial road up to Ambakote | 1 | 800 | 4,000,000.00 |
| 4 | Development of the by-road from near Mr. Janaka Kumara's house | 6 | 250 | 1,000,000.00 |
| 5 | Development of the village road from near Mr. Kumara's house | 8 | 500 | 2,000,000.00 |
| 6 | Narangaspitiya Road development from near Mr. Gamini's house onwards | 9 | 200 | 1,000,000.00 |
| 7 | Repairing the road from near Mrs. Samantha's house to behind the Emjay Garment Factory. | 11 | 50 | 700,000.00 |
| 8 | Development of the by-road from near Mr. Sunil Chandrapala's house | 18 | 250 | 1,000,000.00 |
| 9 | Implementing a drinking water scheme. | 15 | 781 | 2,000,000.00 |
| 10 | Development of the road from near Mr. Anura's house in Meegastenna to Mr. Udagama's house | 17 | 100 | 1,500,000.00 |
| 11 | Development of the side road from near Mr. Sunil's house. | 13 | 75 | 800,000.00 |
| 12 | Providing machines to entrepreneurs engaged in garment production. | 7 | 10 | 1,000,000.00 |
| 13 | Providing equipment to those engaged in the carpentry and masonry industries. | 10 | 10 | 400,000.00 |
| 14 | Providing equipment to Mr. Sugath Kumara's coconut oil mill. | 12 | 3 | 800,000.00 |
| 15 | Providing a machine for the production of seed rice to Mr. Atman for the Senadhira Seeds business. | 14 | 3 | 300,000.00 |
| 16 | Providing equipment required for brick production | 16 | 3 | 500,000.00 |
| 17 | Providing equipment to entrepreneurs engaged in agricultural production. | 19 | 15 | 300,000.00 |
| 18 | Drug prevention | 2 | 50 | |
| 19 | Construction of a clinic center. | 3 | 300 | 5,000,000.00 |
613 - Kandepola
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Completion of the remaining portion of the side embankment of the Kandepola-Hunupolagedara road and development of the road | 2 | 100 | 2,000,000.00 |
| 2 | Repairing and restoring the first section of the Kahakotuwa Maralanda Watta Canal to allow water to flow | 4 | 15 | 300,000.00 |
| 3 | Repairing and cutting the blocked canal system on the Kandepola-Kama road to allow water to drain | 5 | 25 | 200,000.00 |
| 4 | Development of the side road near Mr. Karunathilaka's shop | 6 | 15 | 200,000.00 |
| 5 | Development of the Kandepola Koslanda road | 9 | 15 | 500,000.00 |
| 6 | Completion of the remaining work at Mr. T.M. Nilantha Lakshman's house | 11 | 4 | 1,000,000.00 |
| 7 | Development of the remaining part of the road leading to Mr. Nimal Mohotti's house in Kandepola | 14 | 5 | 200,000.00 |
| 8 | Development of the remaining section of the Galle Estate Road | 12 | 15 | 300,000.00 |
| 9 | Providing necessary equipment to promote entrepreneurs engaged in garment manufacturing | 7 | 4 | 200,000.00 |
| 10 | Construction of a cowshed for Mr. S. M. Samarakoon's dairy cattle | 10 | 4 | 100,000.00 |
| 11 | Construction of a multi-purpose building | 1 | 160 | 3,000,000.00 |
| 12 | Completion of the remaining work on the library building of the Udalupola Sri Bodhimalu Temple | 13 | 3000 | 100,000.00 |
| 13 | Drug prevention | 8 | 50 | 100,000.00 |
| 14 | Starting a cinnamon project | 3 | 15 | 100,000.00 |
614 - Hunupolagedara
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Development of the remaining section of the Hunupolagedara-Anganmeeya Atawalla road. | 9 | 400 | 1,500,000.00 |
| 2 | Development of the Hunupolagedara Ambakote Estate Road | 1 | 50 | 1,500,000.00 |
| 3 | Development of the village road from Udalupola to Kandepola, Hunupolagedara | 8 | 400 | 2,000,000.00 |
| 4 | Development of the agricultural road running from near the house of Mr. Udalupola Rambanda, Hunupolagedara | 4 | 60 | 1,500,000.00 |
| 5 | Completion of the remaining part of the Hunupolagedara Multipurpose Building. | 5 | 800 | 4,000,000.00 |
| 6 | Renovation and development of dilapidated areas on the Hunupolagedara-Batuwatte road. | 12 | 300 | 1,000,000.00 |
| 7 | Completion of the remaining portion of the Hunupolagedara-Gerakmedilla road embankment and development of that road. | 18 | 80 | 1,500,000.00 |
| 8 | Increasing the water capacity of the Doranepola Dam and constructing embankments. | 3 | 160 | 1,500,000.00 |
| 9 | Cutting and developing the road from near the house of Mr. Hunupolagedaraseneviratne to the Polgahakotuwa cemetery. | 16 | 300 | 1,000,000.00 |
| 10 | Construction of a drinking water treatment plant for the Hunupolagedara division. | 6 | 800 | 2,000,000.00 |
| 11 | Implementing a dairy cow management project for the Hunupolagedara division. | 15 | 8 | 1,000,000.00 |
| 12 | Implementing an entrepreneurship development project for the Hunupolagedara division (clothing tailoring, ornamental flower cultivation, ornamental goods production) | 10 | 10 | 1,000,000.00 |
| 13 | Development of the Thoragolla Anvil at Hunupolagedara. | 17 | 150 | 2,000,000.00 |
| 14 | Development of the canal dams running from Udalupola to Anganmeeya in Hunupolagedara. | 13 | 200 | 2,000,000.00 |
| 15 | Development of canals and dams from the Midiatta paddy field in Hunupolagedara to the Aswedduma paddy field. | 14 | 150 | 1,200,000.00 |
| 16 | Providing 05 high-speed machines for the garment sewing business of Mrs. K.J. Priyanka of Hunupolagedara. | 11 | 5 | 700,000.00 |
| 17 | Implementing drug prevention programs for the Hunupolagedara division. | 2 | 200 | 300,000.00 |
| 18 | Introducing new technology and providing agricultural equipment for agricultural cultivation in Hunupolagedara Division. | 7 | 200 | 1,000,000.00 |
| 19 | Obtaining material assistance for the ornamental flower and plant nursery in Hunupolagedara Division. | 19 | 5 | 500,000.00 |
| 20 | Implementing tree plantation programs along the Deduru Oya in Hunupolagedara Division. | 20 | 200 | 100,000.00 |
| 21 | Implementation as a home gardening project for the Hunupolagedara division. | 21 | 265 | 200,000.00 |
| 22 | Completion of the remaining work on the Udalupola Sri Sumanasara Dhamma School building in Hunupolagedara. | 22 | 150 | 1,000,000.00 |
| 23 | Development of the access road near Post 9 on the Keppitigala-Kurunegala road in Hunupolagedara division. | 23 | 30 | 1,000,000.00 |
| 24 | Improvement of the Hunupolagedara Mullekella road | 24 | 20 | 1,500,000.00 |
615 - Doranepola
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Development of Danapala Mawatha | 1 | 300 | 2,000,000.00 |
| 2 | Development of the Hitigedara Road | 2 | 60 | 2,000,000.00 |
| 3 | Developing the Anum by merging the Doranapola Anum and Deniya sections | 3 | 300 | 3,000,000.00 |
| 4 | Construction of the main dam on the Doranapola River | 4 | 200 | 2,000,000.00 |
| 5 | Construction of the side wall of the outlet section of the Doranapola junction | 5 | 200 | 3,000,000.00 |
| 6 | Development of dams in the paddy fields belonging to Anuma | 6 | 60 | 1,000,000.00 |
| 7 | Development of the remaining section of the road from Doranepola village to Hettige Watta public road | 7 | 95 | 1,800,000.00 |
| 8 | Development of the Hunupolakanda Road | 8 | 60 | 4,000,000.00 |
| 9 | Development of Bowatthegedara Road | 9 | 30 | 1,500,000.00 |
| 10 | Preparation of the Doranepola Main Dam Water Control Station | 10 | 60 | 1,000,000.00 |
| 11 | Development of Hettige Wattha Public Well | 11 | 20 | 500,000.00 |
| 12 | Development of the side road towards Anuna on the Doranepola village road | 12 | 20 | 1,000,000.00 |
| 13 | Development of the agricultural road in front of the Doranepola Society Hall | 13 | 20 | 1,000,000.00 |
| 14 | Development of the agricultural road leading to the Galahitiyawa rice fields | 14 | 18 | 1,000,000.00 |
| 15 | Implementation of a water extension from Kosgollepola to cover the Doranepola division | 15 | 200 | 3,000,000.00 |
| 16 | Providing self-employment equipment for home-based industries | 16 | 15 | 1,500,000.00 |
| 17 | Construction of a road to the Hewanilla area's Deoranapola paddy fields | 17 | 30 | 3,000,000.00 |
| 18 | Starting an animal husbandry project (goats, cows, chickens) | 18 | 8 | 1,000,000.00 |
| 19 | Providing agricultural equipment necessary for upland farming | 19 | 15 | 400,000.00 |
| 20 | Providing vocational training courses and NVQ certificates to those engaged in the carpentry, masonry and wiring industries in the region | 20 | 6 | 200,000.00 |
| 21 | Beautiful flower planting on both sides of the Kavisigamuwa Buluwala road | 21 | 160 | 25,000.00 |
616 - Karadagolla
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Development of the main road from near Mr. Thushara's house on the Karandagolla Colony Road. | 1 | 600 | 3,000,000.00 |
| 2 | Development of all the side roads connected to the Karandagolla Colony main road where necessary | 2 | 800 | 20,000,000.00 |
| 3 | Construction of a proper drainage system to drain water on the main road in the Karandagolla auction area | 3 | 250 | 1,500,000.00 |
| 4 | Development of the main road in the Karandagolla Wenadesi section from near the pre-school onwards | 4 | 200 | 2,000,000.00 |
| 5 | Identifying, rehabilitating and employing severely drug addicted people in Karandagolla Division. | 5 | 25 | 1,000,000.00 |
| 6 | Development of the road leading to Mr. Karunathilaka's house in Karandagolla. | 6 | 50 | 2,500,000.00 |
| 7 | Providing a loan for Mr. Nihal Premamaratne's writing and sheet metal industry. | 7 | 3 | 1,000,000.00 |
| 8 | Construction of a house for Mrs. RD Malani. | 8 | 3 | 2,000,000.00 |
| 9 | Providing electricity to a family without electricity | 9 | 6 | 250,000.00 |
| 10 | Providing equipment to self-employed families in Karandagolla Division. | 10 | 15 | 2,000,000.00 |
| 11 | Animal husbandry projects (dairy cattle/poultry farming/beekeeping/gardening) programs | 11 | 20 | 2,000,000.00 |
| 12 | Construction of a security fence around the Karandagolla Community Hall grounds. | 12 | 800 | 1,500,000.00 |
| 13 | Drinking water scheme covering Karandagolla division | 13 | 1000 | 15,000,000.00 |
| 14 | Construction of an office building. | 14 | 1004 | 3,000,000.00 |
| 15 | Widening of the collapsed culvert across the Gonadeniyya Road at Karandagolla Junction. | 15 | 1000 | 5,000,000.00 |
| 16 | Establishing a children's park with all facilities, a night market and a tourist resort on the common land of the Pradeshiya Sabha in the Karandagolla Pela Kotuwa Estate. | 16 | 300 | 10,000,000.00 |
| 17 | Construction of a renovated community hall building | 17 | 500 | 7,500,000.00 |
| 18 | Providing necessary equipment for the Karandagolla Sri Dhammarama Dhamma School. | 18 | 25 | 500,000.00 |
| 19 | Construction of a Buddhist temple for the Karandagolla Narada Buddhist Center. | 19 | 150 | 2,000,000.00 |
| 20 | Financial facilities and awareness training programs for new entrepreneurs | 20 | 25 | 2,000,000.00 |
| 21 | Preparing a drainage ditch in front of the Karandagolla Narada Buddhist Center and constructing a concrete embankment and filling it with soil from the main road along the canal edge. | 21 | 150 | 2,500,000.00 |
| 22 | Implementing awareness programs, attitude development and vocational training programs. | 22 | 200 | 50,000.00 |
| 23 | Implementing programs to conserve the Deduru Oya Reserve and tree planting programs within the district. | 23 | 100 | 25,000.00 |
| 24 | Providing toilets for families without toilets | 24 | 4 | 500,000.00 |
617 - Ambakote
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Development of the Dalupote Gedara Gammada road up to the old Srumaddhi Bank | 1 | 1500 | 1,500,000.00 |
| 2 | Development of the road leading to Bulana village | 2 | 120 | 2,000,000.00 |
| 3 | Development of the remaining sections of the Ambakote Gammada road | 3 | 80 | 800,000.00 |
| 4 | Funding to complete remaining work on Sri Indrajothi Dhamma School building | 4 | 1500 | 2,500,000.00 |
| 5 | Providing agricultural equipment necessary for upland farming. | 5 | 15 | 400,000.00 |
| 6 | Installation of doors and windows in the Sri Mahamaya Preschool building. | 6 | 20 | 800,000.00 |
| 7 | Development of 2 km of access road to the public cemetery | 7 | 250 | 2,000,000.00 |
| 8 | Construction of a side wall to the middle of the road at the beginning of the Bulana Temple Road | 8 | 2500 | 8,000,000.00 |
| 9 | Renovation of Karadagolla Anvil. | 9 | 350 | 1,000,000.00 |
| 10 | Development of Gorakgahapitiya anvil and dam. | 10 | 350 | 1,500,000.00 |
| 11 | Development of the secondary agricultural road from Dalupote village to Kandepola. | 11 | 350 | 1,500,000.00 |
| 12 | Implementing a drinking water scheme. | 12 | 250 | 8,000,000.00 |
| 13 | Development of agricultural roads in the village paddy fields. | 13 | 350 | 1,000,000.00 |
| 14 | Providing vocational training courses and NVQ certificates to those engaged in the carpentry, masonry and wiring industries in the region. | 14 | 10 | 400,000.00 |
| 15 | Providing chickens and equipment for poultry farming. | 15 | 15 | 500,000.00 |
| 16 | Development of the road from near Mr. Amarasooriya's house to Mr. Premadasa's house | 16 | 80 | 800,000.00 |
| 17 | Providing necessary equipment for the sewing industry. | 17 | 10 | 400,000.00 |
| 18 | A water project to improve agriculture | 18 | 350 | 15,000,000.00 |
| 19 | Beautiful flower planting on both sides of the Ambakote Gonadeniya road. | 19 | 20000 | 50,000.00 |
| 20 | Conducting workshops for batik handicrafts. | 20 | 4 | 200,000.00 |
| 21 | Assistance to complete the remaining work on the house of low-income earner TM Muthubanda | 21 | 4 | 500,000.00 |
| 22 | Assistance to repair the roof of the house of low-income earner AG Premawathi | 22 | 4 | 500,000.00 |
| 23 | Providing sanitation facilities to homes without sanitation facilities. | 23 | 3 | 200,000.00 |
| 24 | Providing housing assistance to Mrs. RM Sarath Dassanayake | 24 | 2 | 500,000.00 |
| 25 | Providing necessary facilities for betel cultivation. | 25 | 5 | 200,000.00 |
| 26 | Providing equipment for home-based industries and self-employment. | 26 | 30 | 1,500,000.00 |
| 27 | Developing the neglected part of the village paddy field. | 27 | 150 | 1,000,000.00 |
618 - Buluwala
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Development of necessary areas on the road from near the dispensary to Attipola | 1 | 250 | 2,000,000.00 |
| 2 | Renovation of the side wall near Mr. Jayaruk's house | 2 | 250 | 1,000,000.00 |
| 3 | Construction of a side wall near Mr. Jayathilaka's house | 3 | 200 | 1,500,000.00 |
| 4 | Repairing the side wall and culvert near Mr. Cyril's house | 4 | 150 | 2,500,000.00 |
| 5 | Development of the road from Peragasthenna to Kongahamulahena | 5 | 150 | 1,000,000.00 |
| 6 | Development of the Pallewatte Lake Road in Buluwala | 6 | 150 | 1,000,000.00 |
| 7 | Development of Hungampitiya Village Council Road | 7 | 200 | 1,000,000.00 |
| 8 | Construction of a side wall near Ambalama in Buluwala | 8 | 250 | 1,500,000.00 |
| 9 | Development of the road from Buluwala Junction to 7 acres | 9 | 250 | 2,000,000.00 |
| 10 | Developing entrepreneurs through a flexible loan scheme that provides training necessary for entrepreneurship | 10 | 10 | 1,000,000.00 |
| 11 | Providing necessary animals and equipment, taking into account the needs of those currently engaged in animal husbandry | 11 | 5 | 2,000,000.00 |
| 12 | Providing gardening equipment to farmers who are engaged in gardening | 12 | 5 | 2,000,000.00 |
| 13 | Providing training and raw materials relevant to the Buluwala division | 13 | 5 | 500,000.00 |
| 14 | Providing sports equipment to Buluwala Maha Vidyalaya | 14 | 400 | 500,000.00 |
619 - Kosgollepola
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Development of the road from near Mr. Shantha's shop to Welipattala | 1 | 70 | 1,000,000.00 |
| 2 | Development of necessary areas from Sitagama Middle Road near Mr. Shantha's shop to the main canal | 2 | 50 | 2,000,000.00 |
| 3 | Development of Janaraja Mawatha with Pavdana Bridge | 3 | 25 | 1,000,000.00 |
| 4 | Development of the road from near Mr. Kumara's house to the Pankotuwa well with a side embankment | 4 | 10 | 1,000,000.00 |
| 5 | Concreting the road from Koslelalepola to Buluwalakanda up to the divisional boundary with the Twalawwatte by-pass | 5 | 60 | 1,500,000.00 |
| 6 | Conducting all road surveys in the area | 6 | 300 | 200,000.00 |
| 7 | Development of the road from Janaraja Mawatha to the house of Mr. Ihala Thumbana Saman using gravel | 7 | 8 | 200,000.00 |
| 8 | Implementation of a drinking water scheme for the domain | 8 | 300 | 2,000,000.00 |
| 9 | Development of Polgahakotuwa Cemetery | 9 | 600 | 200,000.00 |
| 10 | Development of necessary areas at Pinkumbura Dam | 10 | 60 | 1,000,000.00 |
| 11 | Development of the dam from Amunai to Mahawela | 11 | 70 | 500,000.00 |
| 12 | Construction of a volleyball court | 12 | 40 | 4,000,000.00 |
| 13 | Construction of a multi-purpose building for the domain | 13 | 500 | 2,000,000.00 |
| 14 | Providing credit facilities and equipment for home-based industries | 14 | 12 | 2,000,000.00 |
| 15 | Implementing a program for drug prevention | 15 | 100 | 200,000.00 |
| 16 | Providing training, loans, seeds, and seedlings for agriculture | 16 | 30 | 100,000.00 |
620 - Buluwalkanda
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Development of the road from Atipola via Buluwala Mountain to Gurugalpita, near the school | 1 | 463 | 2,000,000.00 |
| 2 | Renovation of the electricity cable system running from Buluwala to Gonamada via Buluwala Kanwida | 2 | 463 | 1,000,000.00 |
| 3 | Development of the Tammabiyahena Canal by installing two box culverts | 3 | 300 | 2,000,000.00 |
| 4 | Development of the road with the toll gate on the road leading from Thalakolahena to Baduwatte | 4 | 200 | 2,000,000.00 |
| 5 | Construction of a vine bridge to connect the two sides of the collapsed canal on the road leading to Baduwatte near the temple | 5 | 100 | 1,000,000.00 |
| 6 | Development of the side road from the lower public well to the well | 6 | 300 | 1,500,000.00 |
| 7 | Providing air rifles as a solution to wildlife damage | 7 | 25 | 500,000.00 |
| 8 | Providing training and equipment for entrepreneurship development | 8 | 10 | 1,000,000.00 |
| 9 | Cutting and development of the road from Thambiahena to Amuhena | 9 | 50 | 2,000,000.00 |
| 10 | Implementing an animal control project | 10 | 12 | 1,000,000.00 |
| 11 | Construction of a service pavilion | 11 | 450 | 3,000,000.00 |
621 - Gonamada
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Concreting the road from Akkarapah to Gonamada | 1 | 379 | 150,000,000.00 |
| 2 | Development of the road from near Mrs. Ramyawathi's house to the cemetery | 2 | 250 | 15,000,000.00 |
| 3 | Development of the road from Gurugalpita to Buluwalakanda School | 3 | 200 | 14,000,000.00 |
| 4 | Development of the road from the main road to the playground | 4 | 300 | 1,400,000.00 |
| 5 | Bundling the main electrical system | 5 | 379 | 5,000,000.00 |
| 6 | Providing facilities for agricultural minor export crops | 6 | 150 | 4,000,000.00 |
| 7 | Solutions to wildlife damage | 7 | 379 | 1,000,000.00 |
| 8 | Improvement of Pangala Viewpoint and provision of toilet and water facilities | 8 | 400 | 8,000,000.00 |
| 9 | Development of the road from near Mr. Nishantha's house to Mr. Rohana's house | 9 | 150 | 5,000,000.00 |
| 10 | Obtaining animals and equipment required for animal husbandry | 10 | 50 | 6,000,000.00 |
622 - Hewenpola
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Creating a Line Room Renovation Project | 2 | 115 | 50,000,000.00 |
| 2 | Development of the road from Nila Sevana to Kannangara Watta | 12 | 200 | 2,000,000.00 |
| 3 | Development of all side roads in the Grama Niladhari Division | 11 | 1200 | 9,000,000.00 |
| 4 | Development of the road from near the cooperative to Buluwala (Dewala Road) | 1 | 400 | 4,000,000.00 |
| 5 | Completion of the remaining works at the Mutthumari Amman Kowale in Sakaraliya Watta | 3 | 275 | 1,500,000.00 |
| 6 | The roof of the Hawanpola Devalaya is being concreted. | 24 | 100 | 500,000.00 |
| 7 | The remaining work on the Parami Diriya Vanitha Society building has been completed. | 26 | 40 | 300,000.00 |
| 8 | Installation of electric lamps for the needs of the domain | 15 | 1300 | 200,000.00 |
| 9 | Providing training, technical knowledge, tools and financial assistance to self-employed beneficiaries | 7 | 50 | 500,000.00 |
| 10 | Establish a gardening project in the district | 16 | 150 | 100,000.00 |
| 11 | Construction of a community hall and playground | 4 | 150 | 2,000,000.00 |
| 12 | Improving the quality of spiritual and social programs in the domain | 21 | 1000 | 0.00 |
| 13 | Moving the beer hall in the domain to another location | 23 | 200 | 0.00 |
| 14 | Construction of a community hall for Havenpola village | 18 | 130 | 2,000,000.00 |
| 15 | Construction of a community hall for the Sakaliya Estate | 6 | 230 | 2,000,000.00 |
| 16 | Establish a program for environmental protection and waste management | 17 | 1300 | 100,000.00 |
| 17 | Conducting survey work on all roads in the division and preparing the drainage system and canals | 5 | 1000 | 800,000.00 |
| 18 | Public ownership and settlement of the road from the service building to the iron gate | 10 | 48 | 0.00 |
| 19 | Freshwater fish production with a water project for the Mannapotha springs | 13 | 16 | 500,000.00 |
| 20 | Making Ulpathawala a tourist center for tourists | 9 | 250 | 1,000,000.00 |
| 21 | Taking over the road near Mr. Susil Samansiri's house to the Provincial Council | 8 | 32 | 0.00 |
| 22 | Prepare a side wall for the public toilets in the auction estate. | 20 | 80 | 300,000.00 |
| 23 | Cultivation of mixed crops in the area | 22 | 600 | 100,000.00 |
| 24 | Providing equipment for Hinduism school | 19 | 200 | 100,000.00 |
| 25 | A weekly market was built at the Mahawanpola Cooperative Land. | 14 | 400 | 500,000.00 |
| 26 | Providing desks, chairs and playground equipment for the Samunala Pre-School | 25 | 30 | 200,000.00 |
623 - Welagedara
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Development of the road from the elderly home to the Welagedara community hall | 1 | 285 | 9,000,000.00 |
| 2 | Development of the road from near Mr. Ranasinghe's house through the auction estate section | 2 | 285 | 8,000,000.00 |
| 3 | Development of the section from Kurumbawa Junction to Dodamgaha Gedara Junction | 4 | 330 | 500,000.00 |
| 4 | Construction of a new access road from near the Galvetiya transformer to the Vana paddy fields | 6 | 120 | 5,000,000.00 |
| 5 | Development of the road from Ranganagama Temple to Sakaraliya Wattha | 5 | 200 | 5,000,000.00 |
| 6 | Development of the road from near Mr. Gamini's market to Kekirihena Temple | 7 | 220 | 8,000,000.00 |
| 7 | Development of the road from near the house of Mr. Alawala Postman to Kekirihena Temple | 8 | 180 | 10,000,000.00 |
| 8 | Development of all side roads in Welagedara division | 23 | 1000 | 0.00 |
| 9 | Measurement of all local council roads | 14 | 1500 | 50,000.00 |
| 10 | Establishing a drinking water project for Welagedara Division | 15 | 950 | 10,000,000.00 |
| 11 | Repair of the toilet and septic system at Alawala Primary School | 19 | 100 | 200,000.00 |
| 12 | Renovating the Davate Anvil and developing the Elavella up to the Vana Paddy Field | 9 | 150 | 1,500,000.00 |
| 13 | Development of the canal dam running through the Moragahakumbura farm and the village paddy field | 10 | 180 | 1,500,000.00 |
| 14 | Kospothu Oya Elhena Irrigation Project to be renovated up to Vana Paddy Field | 11 | 180 | 2,000,000.00 |
| 15 | Development of the Sakaraliya Estate into a small tank in the rocks | 16 | 350 | 8,000,000.00 |
| 16 | Renovation of the Kaduwela Anvil in Dehi Atta | 12 | 200 | 2,000,000.00 |
| 17 | Renovation of the side wall and embankment of the Palle paddy field | 13 | 250 | 3,000,000.00 |
| 18 | Rehabilitation and employment of those who are severely addicted to drugs | 24 | 0 | 0.00 |
| 19 | Construction of a playground with a service center in Welagedara Division | 3 | 800 | 5,000,000.00 |
| 20 | Development of Meekadupitiya Cemetery | 17 | 960 | 1,000,000.00 |
| 21 | Necessary steps to be taken to grant ownership of the land received by the Welagedara Police | 25 | 960 | 0.00 |
| 22 | Repair of the roof and ceiling of the office building of Alawala Primary School | 18 | 100 | 20,000.00 |
| 23 | Repair the fence around Alawala School. | 20 | 100 | 500,000.00 |
| 24 | Repairing the walls of the 100*20 building of the college, installing doors in the rooms, and installing doors to the building. | 21 | 100 | 500,000.00 |
| 25 | Providing a computer desk and chair to Alawala College | 22 | 100 | 20,000.00 |
624 - Akkarapanaha
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Development of Walahamulla Road from near Mr. R.D. Ananda Rajapaksa's house to Mr. Sunil's house | 1 | 1500 | 1,000,000.00 |
| 2 | Development of the Verukanda road from near Mr. Raja's house to Mr. Wimalaratne's house | 3 | 100 | 1,000,000.00 |
| 3 | Development of the road from near Mr. Sumanasuriya's house to Mr. Madduma Bandara's house | 4 | 35 | 700,000.00 |
| 4 | Development of the road from near Mr. Arichandra's house to the community hall | 7 | 600 | 500,000.00 |
| 5 | Development of the road from near Mr. Gamini's house to the bakery | 8 | 150 | 700,000.00 |
| 6 | Development of the road from near Mr. Podi Appuhami's house to Mr. Sunil's house using a side wall | 10 | 200 | 1,500,000.00 |
| 7 | Install street lights on both sides of the road. | 12 | 100 | 200,000.00 |
| 8 | Obtaining a transformer for the fifty-acre domain | 14 | 850 | 2,000,000.00 |
| 9 | Development of the Akkarapanaha-Ilukpitiya agricultural road | 15 | 300 | 3,000,000.00 |
| 10 | The bridge leading to the village across the Kospopothu Oya has been widened and developed. | 2 | 1500 | 8,000,000.00 |
| 11 | Providing a greenhouse for crop cultivation | 13 | 1 | 600,000.00 |
| 12 | Obtaining a sewing machine | 9 | 5 | 1,000,000.00 |
| 13 | Implementing self-employment training programs | 11 | 150 | 500,000.00 |
| 14 | Developing the Susiana Bhumi | 5 | 850 | 3,000,000.00 |
| 15 | Construction of the service building | 6 | 850 | 4,000,000.00 |
625 - Gonadeniya
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. | ||
| 1 | Nadeniya | G-0625 | Development of the road from Gonadeni Junction to Valliyakotuwa | 1 | 300 | 4,000,000.00 |
| 2 | Nadeniya | G-0625 | Implementation of the water project that has been stalled in Thalgaspitiya District in Gonadeni Division | 13 | 500 | 5,000,000.00 |
| 3 | Nadeniya | G-0625 | Renovation of the Goal Anguilla and associated embankments | 2 | 50 | 2,000,000.00 |
| 4 | Nadeniya | G-0625 | The road from near Mr. Mahesh's house to the house of the Superintendent has been developed. | 3 | 20 | 1,000,000.00 |
| 5 | Nadeniya | G-0625 | The road from near the bridge to Mr. Suranga's house was developed with bridges. | 4 | 30 | 2,500,000.00 |
| 6 | Nadeniya | G-0625 | Development of the Gallanga Anuma Elawella Road from near Mr. Mahinda's house to Gonadeni Junction | 19 | 50 | 2,000,000.00 |
| 7 | Nadeniya | G-0625 | Construction of a parking lot with a sanitary facility for tourists (for a hot air balloon project) | 11 | 120 | 6,000,000.00 |
| 8 | Nadeniya | G-0625 | Development of the Pansel land | 6 | 300 | 1,000,000.00 |
| 9 | Nadeniya | G-0625 | Construct a community hall for the Gonadheniya division's service center | 5 | 100 | 2,000,000.00 |
| 10 | Nadeniya | G-0625 | Construction of a site and playground for the Little Winch Preschool | 16 | 25 | 2,500,000.00 |
| 11 | Nadeniya | G-0625 | Renovation of old aqueducts and diversion of excess water to the aqueduct | 12 | 35 | 2,000,000.00 |
| 12 | Development of the road from near Mr. Wijesuri's shop to Pihilianga | 10 | 50 | 2,000,000.00 | ||
| 13 | Nadeniya | G-0625 | Development of the Children's Park in Gonadeni Division | 17 | 25 | 2,000,000.00 |
| 14 | Nadeniya | G-0625 | The road from near Mrs. Sheela Rajapaksa's house to Mr. Harsha's house was taken over by the Regional Council and developed. | 14 | 20 | 2,000,000.00 |
| 15 | Nadeniya | G-0625 | Construction of a tank in the Pihilianga area | 18 | 0 | 0.00 |
| 16 | Nadeniya | G-0625 | Surveying and clearing the old weaving center and maintaining it as a professional center | 20 | 0 | 5,000,000.00 |
| 17 | Nadeniya | G-0625 | Installation of street lights in required locations | 15 | 0 | 10,000.00 |
| 18 | Nadeniya | G-0625 | The road from near Mr. Premachandra's house to Mr. Kirigoris's house was developed. | 9 | 50 | 1,000,000.00 |
| 19 | Nadeniya | G-0625 | The road from near Mr. Jayathilaka's shop to Mr. Sampath's house was developed. | 8 | 15 | 1,000,000.00 |
| 20 | Nadeniya | G-0625 | Develop the existing public well in the area. | 7 | 100 | 1,000,000.00 |
626 - Kongoda
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Development from the Akkara Panthiya Junction to the Kongoda Iron Bridge | 1 | 750 | 26,000,000.00 |
| 2 | Sangili Bridge renovation | 2 | 350 | 5,000,000.00 |
| 3 | Development of the road from Badabedda to Hawanpola [sidewalls, culverts] | 3 | 250 | 13,000,000.00 |
| 4 | Taking steps to prevent erosion of the banks of Kospothu Oya | 4 | 800 | 2,000,000.00 |
| 5 | Starting and maintaining the Naimiris Vagawa | 5 | 10 | 200,000.00 |
| 6 | Conducting self-employment training programs | 6 | 50 | 100,000.00 |
| 7 | Construction and development of the side wall of the main canal at Kospothu Shaya Anumana | 7 | 450 | 10,000,000.00 |
| 8 | Implementation of animal control programs | 8 | 350 | 2,000,000.00 |
| 9 | Repairing and conserving the side wall near Mr. Wasantha Premalal's house | 9 | 300 | 5,000,000.00 |
| 10 | Implementation of home gardening programs in 10 bowls | 10 | 10 | 500,000.00 |
| 11 | Conducting attitude development programs | 11 | 300 | 5,000.00 |
| 12 | Creating products related to dairy farming | 12 | 420 | 3,000,000.00 |
| 13 | Development of the road from near the house of Mrs. R.D. Seelawathi to the house of Mrs. R.D. Hemalatha in Velhena | 13 | 120 | 3,000,000.00 |
| 14 | Conducting a drug prevention program | 14 | 150 | 50,000.00 |
| 15 | Development of the road from near Mr. M.A.D. Gunadasa's house towards Mr. R.D. Wimalaratne's house | 15 | 150 | 4,000,000.00 |
| 16 | Development of the canal reserve along the main canal route by reclaiming it up to the foot of the field | 16 | 450 | 10,000,000.00 |
| 17 | Development of the road from near the house of Mr. K.D. Gunathilaka to near the house of Mr. E.P.D. Piyasena | 17 | 75 | 3,000,000.00 |
| 18 | Development of the road from near Mr. H.M.S. Piyasena's house to the Kone Kumbura Junction | 18 | 250 | 4,000,000.00 |
| 19 | Renovation of the canal divide near the Kongoda Cemetery | 19 | 150 | 3,000,000.00 |
| 20 | Providing a house to Mr. U.J. Susantha Srimal | 20 | 5 | 1,000,000.00 |
| 21 | Cultivation of coconuts on uncultivated lands identified within the domain | 21 | 10 | 500,000.00 |
| 22 | Renovation of the Buddha's temple at Kumballangapitiya Temple | 22 | 1650 | 3,000,000.00 |
| 23 | Development of the road from near Mr. Cyril Muthunayake's house to Mr. Roshan Sanjaya's house | 23 | 100 | 3,000,000.00 |
| 24 | Development of the road from near Mr. M.D. Lenin's house to Mr. R.D. Premaratne's house | 24 | 175 | 3,000,000.00 |
| 25 | Construction of the Seva Piyasa building | 25 | 550 | 15,000,000.00 |
| 26 | Development work at the Dharmashala of the Kumbalanga Pitiya Temple | 26 | 1650 | 3,000,000.00 |
| 27 | Facilitation of MPD Roshan Sanjeewa Karunaratne to start a brick cutting business | 27 | 4 | 1,000,000.00 |
| 28 | Development of the road up to Kongogoda Society Hall by laying side walls | 28 | 250 | 6,000,000.00 |
| 29 | Sudath Ananda's Handukuru Manufacturing Institute to be upgraded | 29 | 6 | 1,500,000.00 |
| 30 | Improving Mr. R.D. Jayasinghe's mosquito net manufacturing business | 30 | 4 | 1,000,000.00 |
| 31 | Renovation of the canal divide near the Kongoda Cemetery | 31 | 150 | 3,000,000.00 |
| 32 | Providing a house to MPD Saman Kumara | 32 | 3 | 1,000,000.00 |
| 33 | Providing a house to Mr. K.P. Ashoka Priyadarshana Saman Kumara | 33 | 3 | 1,000,000.00 |
| 34 | Establishing a market for agricultural crops | 34 | 50 | 1,000,000.00 |
| 35 | Providing materials needed to improve the Dhammika Catering business | 35 | 5 | 500,000.00 |
| 36 | Providing equipment necessary for physical fitness | 36 | 150 | 15,000,000.00 |
| 37 | Exporting dried marigold flowers | 37 | 25 | 500,000.00 |
| 38 | Providing a house to Mr. J. Cyril Banda | 38 | 2 | 1,000,000.00 |
| 39 | Issuance of title deeds for LRC lands | 39 | 16 | 500,000.00 |
| 40 | Renovation of the preschool playground | 40 | 350 | 1,000,000.00 |
| 41 | Providing a house to Mrs. R.D. Alan Chandrawathi | 41 | 1 | 500,000.00 |
| 42 | Providing a house to Mrs. W.D. Baby | 42 | 1 | 500,000.00 |
| 43 | Providing a house to Mrs. E.W. Gnanawathi | 43 | 2 | 500,000.00 |
627 - Siyamalangamwa
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Surveying and developing the road from near Kadihagama Buddha Temple to Thalagaha Plain on the Arepola Mountain Road | 1 | 400 | 1,000,000.00 |
| 2 | Implementing a water scheme to provide drinking water to the people of Arepolakanda, Diyabethman, Siyambalangamuwa Division | 2 | 400 | 3,000,000.00 |
| 3 | Construction of a service pavilion and a toilet on the common ground where the Siyambalangamuwa Sahana United Funeral Aid Society Hall is located | 3 | 800 | 5,000,000.00 |
| 4 | Development of the road from the middle road of Siyambalangamuwa village near Mr. Sri Wickrama's house to Mr. Sitathilakaratne's house | 4 | 120 | 1,500,000.00 |
| 5 | Development of the side road from near Mr. Seneviratne's house to Mr. Nimal Ranasinghe's house on the middle road in Siyambalangamuwa village | 5 | 80 | 1,500,000.00 |
| 6 | Development of the side road from near Mr. Jagath's house in Nawala to Mr. Madushanka's house | 6 | 80 | 1,500,000.00 |
| 7 | Development of the road near Kadihagama Cooperative Society (Bogahalanda Road) from near Mr. Subha Sinha's house to Mr. Dharmasiri's house | 7 | 180 | 1,500,000.00 |
| 8 | Development from near Balagala Anum in Kadihagama to Thalgaspitiya Bridge | 8 | 500 | 4,000,000.00 |
| 9 | Development of the road from near the Wathuherapitiya Samathi Hall to the Ivurudeka Agricultural Road to Jakaduwa Division by installing box culverts | 9 | 100 | 1,500,000.00 |
| 10 | Development of the road through Nallure village from near Mrs. Shantha Kumari's house to Mr. Abeysinghe's house | 10 | 100 | 1,500,000.00 |
| 11 | Development of the road from near Mr. Rajamuni's house in Kadihagama to Mrs. Tamara's house | 11 | 180 | 1,500,000.00 |
| 12 | Development of the by-road from near Mr. Thilakaratne's house to Akkarapanaha | 12 | 200 | 2,000,000.00 |
| 13 | Development of the road near Mr. Lionel's house in Siyambalangamuwa up to Mr. Sitaranasinghe's house | 13 | 80 | 15,000,000.00 |
| 14 | Providing self-employment loans, goods and equipment for the livelihood development of the community in the area | 14 | 5 | 1,600,000.00 |
| 15 | Development of the road from near Mr. Disanayake's house in Eriyagahawatte to Mr. Seneviratne's house | 15 | 80 | 1,500,000.00 |
| 16 | Development of the road from near Mr. Shantha's house on Upali Ranaviru Mawatha, Nallure to Mr. Karunaratne's house | 16 | 70 | 1,500,000.00 |
628 - Medagama
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Development of Medagama Temple Road | 1 | 200 | 2,000,000.00 |
| 2 | Development of Medagama Tank (Sludge Removal) | 2 | 500 | 5,000,000.00 |
| 3 | Development of dams including the main dam of the Medagama Tank | 3 | 300 | 2,000,000.00 |
| 4 | Construction of a side wall from above near Mr. Vijitha's field in Eriyagahawatte | 4 | 100 | 500,000.00 |
| 5 | Construction of a water lifting project for the paddy field below the house of Mr. Sarathchandra in Medagama | 5 | 60 | 3,000,000.00 |
| 6 | Constructing an anvil at a suitable location on the canal route of the Medagama Tank to obtain water for the sandy paddy fields | 6 | 50 | 1,000,000.00 |
| 7 | Developing the necessary places on the Ihalagama road | 7 | 50 | 1,000,000.00 |
| 8 | Development of the road to Medagama Lake | 8 | 250 | 1,000,000.00 |
| 9 | Providing finance and equipment for setting up cottage industries | 9 | 2 | 200,000.00 |
| 10 | Construction of a concrete drainage system for the dam adjacent to the road leading to Narammaluwa Temple | 10 | 150 | 2,000,000.00 |
| 11 | Implementing a dairy cow project | 11 | 3 | 500,000.00 |
| 12 | Construction of a security fence for Medagama School | 12 | 500 | 1,000,000.00 |
| 13 | Development of the road towards Mr. Kainakka Piyantha's house where necessary | 13 | 80 | 1,500,000.00 |
| 14 | Development of the dam that supplies water to the Kainakka paddy fields by installing a culvert | 14 | 50 | 1,000,000.00 |
| 15 | Providing a playground and equipment to Medagama Pre-School | 15 | 400 | 300,000.00 |
| 16 | Concreting the road from near Pihilla, Medagama to the house of Mrs. R.D. Podinona | 16 | 15 | 1,000,000.00 |
| 17 | Development of the Kandagaha Dalupotha Dam | 17 | 60 | 1,000,000.00 |
| 18 | Providing equipment to Sri Siddhartha Dhamma School, Medagama | 18 | 200 | 200,000.00 |
| 19 | Providing equipment to Sri Upananda Dhamma School | 19 | 150 | 200,000.00 |
| 20 | Clearing and developing the Narammaluwa-Valliya Fort road | 20 | 40 | 1,000,000.00 |
| 21 | Protecting the reserved forest above the Medagama Lake as a sensitive ecological zone | 21 | 500 | 500,000.00 |
| 22 | Providing vocational training to school dropouts in the region | 22 | 20 | 200,000.00 |
| 23 | Establish a fishing association by releasing fish into the Medagama Lake and expanding fishing. | 23 | 50 | 300,000.00 |
| 24 | Home-based murukku production | 24 | 2 | 100,000.00 |
629 - Arawpolakanda
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Renovation of the Billa bend in the Balagala division on the Arawipola Kanda road | 2 | 203 | 1,000,000.00 |
| 2 | Development of the Aravpolakanda-Bhumakotuwahena road | 3 | 45 | 5,000,000.00 |
| 3 | Development of the Avpolakanda Temple Road | 4 | 203 | 5,000,000.00 |
| 4 | Development of necessary areas on the road from near Mr. R.D. Jayasuriya's house to the cemetery | 7 | 203 | 2,000,000.00 |
| 5 | Developing the Arawipolakanda school buildings and obtaining electricity (the school is closed and the building will be used for community activities) | 8 | 203 | 1,000,000.00 |
| 6 | Renovation of the public wells at Aravpolakanda, Udahawatta and Lidagamara | 11 | 30 | 500,000.00 |
| 7 | Cutting and developing the road from near the Aravpopolakanda Temple to Nelawulla | 12 | 100 | 5,000,000.00 |
| 8 | Industrial industry (starting a new industry) | 13 | 1 | 180,000.00 |
| 9 | Carpentry | 14 | 1 | 50,000.00 |
| 10 | Drying and processing of small export crops (two dehydrators for two people) | 15 | 2 | 1,000,000.00 |
| 11 | Industrial sector (improvement of existing industry) | 16 | 1 | 1,800,000.00 |
| 12 | Construction and development of the side wall of the playground near the Aravpolakandda Temple | 9 | 203 | 3,000,000.00 |
| 13 | Renovation of the community hall near the Aravpola Kanda Temple | 10 | 203 | 100,000.00 |
| 14 | Obtaining compensation for wildlife damage | 1 | 203 | 1,000,000.00 |
| 15 | Survey and settle the Aravupolakanda school grounds and reserve. | 5 | 203 | 500,000.00 |
| 16 | Remaining work on the building being constructed at the Arevpolakanda Cemetery has been completed. | 6 | 203 | 500,000.00 |
630 - Balagala
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Development of Gomaranga Anvil | 1 | 80 | 2,500,000.00 |
| 2 | Providing equipment for Sri Sumana Dhamma School | 2 | 120 | 500,000.00 |
| 3 | Development of the Arapolawatte Road | 3 | 25 | 2,500,000.00 |
| 4 | Dangolla Cemetery Development | 4 | 100 | 1,000,000.00 |
| 5 | Organizing a monthly attitude development program | 5 | 243 | 200,000.00 |
| 6 | Getting a volleyball court | 6 | 50 | 600,000.00 |
| 7 | Development of the procession route | 7 | 35 | 2,000,000.00 |
| 8 | Development of dams on the Gomaranga River | 8 | 80 | 2,500,000.00 |
| 9 | Development of the Jakadukanda Gomaranga Road | 9 | 25 | 1,500,000.00 |
| 10 | Developing the remaining section of the Medawatte Road | 10 | 8 | 1,000,000.00 |
| 11 | Developing the Balagala Anvil and increasing its water capacity | 11 | 20 | 2,500,000.00 |
| 12 | Renovation and development of the Balagala-Jakadukanda road | 12 | 45 | 2,000,000.00 |
| 13 | Development of the Galgode road from the main road | 13 | 50 | 2,000,000.00 |
| 14 | Providing equipment and financial assistance to cottage industries | 14 | 25 | 5,000,000.00 |
| 15 | Improvement of the road starting from Mr. Seneviratne's shop | 15 | 25 | 1,500,000.00 |
| 16 | Providing an animal control project | 16 | 15 | 2,500,000.00 |
631 - Thalgaspitiya
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Construction of a side embankment to the Balagala Canal in the Bogahakotuwa rice field, Thalgaspitiya | 1 | 700 | 5,000,000.00 |
| 2 | Development of a bridge and side wall to allow water to flow out of the culvert used to release excess water from the rice paddy irrigation system at the entrance to the road from Thalgaspitiya to Gal Anuma. | 2 | 700 | 1,000,000.00 |
| 3 | Developing the irrigation system of the Welikumbura project | 3 | 700 | 2,000,000.00 |
| 4 | Conducting programs to develop the attitudes and morals of the youth community | 4 | 150 | 50,000.00 |
| 5 | Marking of all road boundaries within the domain | 5 | 700 | 2,000,000.00 |
| 6 | Providing goods and equipment to those who are currently engaged in self-employment and those who aspire to do so for livelihood development | 6 | 30 | 1,000,000.00 |
| 7 | Construction of a bridge over the canal connecting Thalgaspitiya and Jakaduwa | 7 | 760 | 3,000,000.00 |
| 8 | Development of the road from Thalgaspitiya to Elhena Anuma | 8 | 50 | 5,000,000.00 |
| 9 | Construction of a drainage system on both sides of the main road | 9 | 1500 | 2,000,000.00 |
| 10 | Completion of the main requirements of Thalgaspitiya School | 10 | 1000 | 3,000,000.00 |
| 11 | Development of the road from near Mr. Khalil's house to the church junction via Mr. Nistar's house | 11 | 50 | 1,000,000.00 |
| 12 | Opening of a birth office for Thalgaspitiya | 12 | 1500 | 1,000,000.00 |
| 13 | Conducting vocational training programs for school dropouts | 13 | 35 | 200,000.00 |
| 14 | Development of the road starting from the school to the church land | 14 | 10 | 2,000,000.00 |
| 15 | Development of the irrigation canal near the school to the volleyball court | 15 | 450 | 5,000,000.00 |
| 16 | Installation of street lights on all roads in Thalgaspitiya Division | 16 | 500 | 50,000.00 |
| 17 | Development of Jamiul Azwar Jumma Mosque, Thalgaspitiya | 17 | 1100 | 2,000,000.00 |
| 18 | Development of the Thalgaspitiya Sunnathul Muhammadiya Jumma Mosque | 18 | 1500 | 2,000,000.00 |
| 19 | Construction of side walls at necessary locations along the irrigation canal route near the school | 19 | 450 | 1,000,000.00 |
| 20 | Developing the irrigation canal inside the school by installing protective boards | 20 | 1000 | 1,000,000.00 |
| 21 | Development of the Thalgaspitiya-Nallure road | 21 | 750 | 5,000,000.00 |
| 22 | Develop the school playground and construct a sports complex | 22 | 1000 | 1,000,000.00 |
632 - Metiyampotha
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Concreting the necessary areas on the road from near the school towards the volleyball court belonging to the Matiyampotha section | 1 | 100 | 5,000,000.00 |
| 2 | Providing necessary equipment and animals to those who manage animals and those who need them | 2 | 15 | 500,000.00 |
| 3 | Development of the road from Palliyagala to Mahirage Navasa | 3 | 150 | 3,000,000.00 |
| 4 | Providing land titles for permanent residents of Matiyampotha Church and Colony | 4 | 80 | 50,000.00 |
| 5 | Providing self-employment to unemployed women and men and providing the necessary tools to improve those who are currently self-employed | 5 | 50 | 1,000,000.00 |
| 6 | Construction of a dug well in the middle of the Matiyampotha farm | 6 | 350 | 5,000,000.00 |
| 7 | Laying a gravel embankment on the rice field section of the concrete road leading from near Mr. Uwain's house to Naparullah's house | 7 | 75 | 5,000,000.00 |
| 8 | Construction of a fence around the building where maternity clinics are held | 8 | 500 | 500,000.00 |
| 9 | Surveying and developing the road from near Mr. Ranasinghe's house on the Matiyampotha road to the paddy field in Pali Ella division | 9 | 150 | 3,000,000.00 |
| 10 | Concreting the road from Mr. Suhaib's house to Mr. Saruk's house in Matiyampota | 10 | 50 | 1,000,000.00 |
| 11 | Development of the road from Thoragolla Estate to Welagedara | 11 | 450 | 3,000,000.00 |
| 12 | Development of the two public wells near the house of Mr. Matiyampotha Samarakoon | 12 | 250 | 1,000,000.00 |
| 13 | Development of the frontage road near Mr. Nada's bakery up to fifty acres with drainage system | 13 | 300 | 3,000,000.00 |
| 14 | Installation of street lamps on the Matiyampota road from near the Matiyampota Rural Bank | 14 | 700 | 500,000.00 |
| 15 | Development of the road from near Mr. Khalil's house to Polwatta | 15 | 60 | 1,500,000.00 |
| 16 | Surveying and developing the dam above Keleniya from Thoragellawatte | 16 | 450 | 2,000,000.00 |
| 17 | Concreting and construction of a side wall on both sides of the embankment from near Mrs. Anula's Navasa to the Vadi Atta paddy field | 17 | 300 | 2,000,000.00 |
| 18 | Development of all roads in the Matiyampota division by installing necessary street lamps | 18 | 700 | 100,000.00 |
| 19 | Developing the existing water scheme in the Matiyampotha division to expand the area | 19 | 1000 | 2,000,000.00 |
| 20 | Development of the road from near Suhud Mudalali's shop (the road on the left) to Sadat's house | 20 | 25 | 1,000,000.00 |
| 21 | Construction of a resource and information center in the two divisions of Thalgaspitiya and Matiyampotha and acquisition of necessary equipment and machinery | 21 | 700 | 1,000,000.00 |
| 22 | Development of the road separating Matiyampotha village and Medagama village | 22 | 200 | 2,000,000.00 |
| 23 | Concreting the dam from Mr. Samarakona's paddy mill to the grape field | 23 | 300 | 2,000,000.00 |
| 24 | Development of the Matiyampotha Cemetery | 24 | 800 | 200,000.00 |
| 25 | Surveying and developing the road leading to the Ambagahakotuwa well | 25 | 200 | 5,000,000.00 |
| 26 | Development of the Matiyampotha Labu Anga well | 26 | 150 | 5,000,000.00 |
| 27 | Giving Mr. Pawser a fruit dehydrator | 27 | 1 | 100,000.00 |
633 - Pali ella
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Providing necessary equipment for the production of finished garments | 1 | 1,000,000.00 | |
| 2 | Development of the Paliella Cemetery | 2 | 400 | 2,000,000.00 |
| 3 | Obtaining a service certificate for obtaining land for public purposes in Pali Ella Division | 3 | 225 | 3,000,000.00 |
| 4 | Development of Kotadalupotha road up to the Oya | 4 | 125 | 1,000,000.00 |
| 5 | Completion of the remaining work on the Dharmashala building at Kekirihena Temple | 5 | 300 | 3,000,000.00 |
| 6 | Development of the road from Tala Gaha to Wanawela | 6 | 180 | 2,000,000.00 |
| 7 | Widening of Kotadalupotha Anvil | 7 | 300 | 2,000,000.00 |
| 8 | Establishing housing assistance programs | 8 | 50 | 1,000,000.00 |
| 9 | Development of the road from near Rambandi Mudalali's house to Mrs. Bebinona's house | 9 | 100 | 2,000,000.00 |
| 10 | Development of the Paliella main road | 10 | 320 | 2,000,000.00 |
| 11 | Proper development of major irrigation waterways | 11 | 300 | 5,000,000.00 |
| 12 | Development of the road from near Mr. Kapila's shop to the community hall | 12 | 230 | 3,000,000.00 |
| 13 | Development of the Baramine rice field road | 13 | 270 | 2,000,000.00 |
| 14 | Proper demarcation and development of roads in the domain | 14 | 400 | 3,000,000.00 |
| 15 | Development of the road from Kottagaha Junction to Mr. Niskaan's Hardware | 15 | 180 | 2,000,000.00 |
| 16 | Development of the entrance road to Pitiniya of Thalgaspitiya School | 16 | 255 | 2,000,000.00 |
| 17 | Development of the road from near Mr. Mike Gamini's house to the oya | 17 | 195 | 2,000,000.00 |
| 18 | Development of Koholana road up to the temple | 18 | 200 | 1,000,000.00 |
| 19 | Development of the road from near Mr. Asrap's house | 19 | 215 | 2,000,000.00 |
| 20 | Concreting the road from near Mr. Nandapala's house to Mr. Sujith Kumara Ratnayake's house | 20 | 175 | 2,000,000.00 |
| 21 | Providing self-employment opportunities | 21 | 375 | 10,000,000.00 |
| 22 | Creating opportunities for animal husbandry | 22 | 100 | 5,000,000.00 |
| 23 | Improving coir-based products | 23 | 35 | 5,000,000.00 |
| 24 | Providing facilities for the use of solar panels | 24 | 125 | 5,000,000.00 |
| 25 | Establishing a vocational training center | 25 | 300 | 5,000,000.00 |
| 26 | Establishing skill development programs | 26 | 325 | 2,500,000.00 |
| 27 | Taking steps to curb the drug menace | 27 | 150 | 3,000,000.00 |
| 28 | Establishing tree planting projects | 28 | 425 | 3,000,000.00 |
| 29 | Introducing digital communication tools that can earn foreign exchange for young people | 29 | 130 | 3,000,000.00 |
634 - Jakaduwa
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Development of Jakaduwa-Balagala main road with carpet | 1 | 2000 | 50,000,000.00 |
| 2 | Development of the road from the main road to Jakaduwa Rajamaha Viharaya | 2 | 1200 | 5,000,000.00 |
| 3 | Development of Viharawatta-Panwala Anuma Road (Ratmalapitiya Road) | 3 | 800 | 5,000,000.00 |
| 4 | Completion of work on the half-completed multi-purpose building | 4 | 300 | 5,000,000.00 |
| 5 | Implementing a water project for Jakaduwa Division | 5 | 800 | 5,000,000.00 |
| 6 | Development of the side road starting near the society hall | 6 | 300 | 3,000,000.00 |
| 7 | Development of the side road starting from the temple grounds on the main road and extending to the Rajamaha Viharaya | 7 | 50 | 2,000,000.00 |
| 8 | Implementation of a water extension from Wal Igurugolla to Jakaduwa (as per the area covered) | 8 | 700 | 10,000,000.00 |
| 9 | Construction of an agricultural road starting from Mr. Daniel's field on the main road and extending to the Ratmalpitiya road | 9 | 200 | 3,000,000.00 |
| 10 | Providing necessary equipment and goods for home-based industries | 10 | 20 | 250,000.00 |
| 11 | Development of the road from the Shasanawardena Temple Road to the cemetery via Korakahalanda | 11 | 300 | 2,500,000.00 |
| 12 | Development of the entrance road to the Shasana Vardhana Viharaya | 12 | 700 | 2,000,000.00 |
| 13 | Development of the road from Siyambalawatta to Dalugagla | 13 | 200 | 5,000,000.00 |
| 14 | Implementing an animal control project | 14 | 15 | 2,500,000.00 |
| 15 | Providing equipment, plants and seeds for the development of home gardening | 15 | 50 | 100,000.00 |
| 16 | Implementing programs to prevent damage to wildlife | 16 | 300 | 1,000,000.00 |
| 17 | Development of a bridge over the Balagala Stream near Mr. Upal's paddy field on the Jakaduwa-Wathuherapitiya road | 17 | 1000 | 5,000,000.00 |
| 18 | Development of the section of the road from Balagala Anum to Wathuherapitiya that is not in Jakaduwa division | 18 | 300 | 3,000,000.00 |
| 19 | Development of the main road up to the Santa Kanuketiya junction | 19 | 20 | 2,000,000.00 |
| 20 | Improvement of the section of the Ratmalpitiya road from near Mr. Saman Rupasiha's house to Mr. Sagara's house | 20 | 80 | 3,000,000.00 |
| 21 | Providing equipment and credit facilities to those engaged in jobs such as carpentry, masonry and beauticians | 21 | 10 | 3,000,000.00 |
| 22 | Providing animals and financial assistance to people who keep goats, poultry and dairy cows | 22 | 25 | 2,500,000.00 |
| 23 | Providing training, finance and equipment to those interested in engaging in the garment sector | 23 | 10 | 2,000,000.00 |
| 24 | Providing NVQ training for those engaged in informal employment | 24 | 8 | 1,000,000.00 |
| 25 | Implementing a tree planting program in the Alaweliwa of the division | 25 | 600 | 500,000.00 |
| 26 | Development of the road connecting Jakaduwa and Thalgaspitiyawasam from Ranwala Pitiya using a Balagala flyover | 26 | 800 | 3,000,000.00 |
635 - Medakanda
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Development of a bridge over the canal that flows across the road from near Mr. Ranasinghe's house to Mr. Ganish Kumara's house | 1 | 160 | 2,000,000.00 |
| 2 | Implementing a program to combat wildlife damage | 2 | 200 | 50,000.00 |
| 3 | Removing and bundling all electrical wires in the Medakanda Grama Niladhari Division | 3 | 200 | 300,000.00 |
| 4 | Obtaining electricity and water facilities for the Gonadeni Kanda Community Hall | 4 | 225 | 100,000.00 |
| 5 | Directing young people to training programs for self-employment and providing them with the necessary equipment | 5 | 20 | 300,000.00 |
| 6 | Installation of electric lamps for the required location in Medakanda Grama Niladhari Division | 6 | 200 | 25,000.00 |
| 7 | Development of the road from Five Acres to Gonadeni Mountain | 7 | 30 | 500,000.00 |
| 8 | Development of the old society hall building and use it for the official shadow office | 8 | 200 | 500,000.00 |
| 9 | Directing the youth community towards skill development programs | 9 | 20 | 100,000.00 |
| 10 | Implementing programs to re-cultivate old cultivated lands | 10 | 25 | 250,000.00 |
636 - Pussella
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Development of the agricultural road leading to Imbulpitiya village and Wel Yaya | 1 | 150 | 2,500,000.00 |
| 2 | Renovation of the embankment and dam behind the building of the Sri Vijayanandaramaya Temple in Pussella | 2 | 300 | 2,500,000.00 |
| 3 | Development of the road from the main road towards Mr. Sarath's house (Kotagane) | 3 | 45 | 1,500,000.00 |
| 4 | Development of the agricultural road from Kosgas Junction to Jayakaduwa Shasanawardena Temple | 4 | 100 | 2,500,000.00 |
| 5 | Providing Dhamma school equipment to Sri Dhammathilaka Dhamma School | 5 | 250 | 1,500,000.00 |
| 6 | Development of the road from Kosgas Junction to Boraluwa | 6 | 150 | 2,500,000.00 |
| 7 | Construction of Dhamma School and Multi-purpose Building at Shasana Vardaka Temple | 7 | 150 | 2,000,000.00 |
| 8 | Development of dams related to the Galveta Anvil and Canal | 8 | 250 | 2,500,000.00 |
| 9 | Galkumbura Main Canal Dam and Development (Required Locations) | 9 | 400 | 2,500,000.00 |
| 10 | Renovation and development of the outer reservoir of the Galkumbura Tank | 10 | 400 | 1,500,000.00 |
| 11 | Development of the side wall of the road near the Dansal Watta house on Puswelikanda Road | 11 | 350 | 1,000,000.00 |
| 12 | Development of the main road to Galkumbura Tank | 12 | 200 | 1,600,000.00 |
| 13 | Development of the necessary areas of the Hiradana Dam in Galtunura Lake | 13 | 125 | 2,000,000.00 |
| 14 | Construction of security fences on both sides of the Pussali Kanda Road bridge and renovation of the bridge | 14 | 250 | 1,500,000.00 |
| 15 | Providing electricity to the maternity clinic center near the lake | 15 | 100 | 200,000.00 |
| 16 | Providing training and equipment for home-based flower cultivation | 16 | 50 | 1,000,000.00 |
| 17 | Development of the dam near Pussella College | 17 | 75 | 1,500,000.00 |
| 18 | The road leading up to Pussella Mountain is being built from near the bridge. | 18 | 200 | 1,000,000.00 |
| 19 | Development of the road leading to the Dalupote rice field | 19 | 150 | 1,500,000.00 |
| 20 | Development of the agricultural road near Pussella Maha Vidyalaya | 20 | 150 | 1,000,000.00 |
| 21 | Providing equipment for home-based industries | 21 | 50 | 2,500,000.00 |
| 22 | Providing seeds, plants and equipment for gardening | 22 | 50 | 1,000,000.00 |
| 23 | Obtaining the knowledge and animals necessary for animal husbandry | 23 | 25 | 1,000,000.00 |
637 - Pusselikanda
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Construction of the side embankment at Temple Trees on the Pussalikanda main road | 1 | 500 | 4,000,000.00 |
| 2 | Development of the Nelawulla road from near Mr. Nirmal Piyarathna's house onwards | 2 | 40 | 3,000,000.00 |
| 3 | Construction of the irrigation system for the Pussalikanda Sarnath Temple | 3 | 130 | 1,500,000.00 |
| 4 | Construction of an alternative road to the steep slope from near Mr. Dharmadasa's house to Mr. Weerasuriya's house on the Nelawulla road | 12 | 50 | 2,000,000.00 |
| 5 | Development of the road from near Mr. Ranjith Jayakody's shop to Mr. Upul's house | 4 | 20 | 3,000,000.00 |
| 6 | Construction of a side wall for the remaining section of the road in front of the Pussalikanda School building | 5 | 100 | 1,000,000.00 |
| 7 | Renovation of the Pussasalikanda School building | 8 | 150 | 3,000,000.00 |
| 8 | Renovation of the drinking water project | 17 | 50 | 800,000.00 |
| 9 | Development of the Dodamtalawa road from near Mr. Shantha Ranaweera's house onwards | 10 | 20 | 1,000,000.00 |
| 10 | Providing self-employment opportunities | 13 | 10 | 300,000.00 |
| 11 | Getting a Juki machine for self-employment | 14 | 1 | 150,000.00 |
| 12 | Obtaining shade netting for snake chili cultivation | 15 | 1 | 120,000.00 |
| 13 | Getting a grinder for the masonry industry | 16 | 1 | 50,000.00 |
| 14 | Obtaining a volleyball court and necessary equipment | 11 | 50 | 1,500,000.00 |
| 15 | Preservation of landslide-prone areas | 18 | 50 | 0.00 |
| 16 | Providing a permanent solution to crop damage caused by wild animals | 9 | 120 | 0.00 |
| 17 | Construction of an official shade building | 6 | 127 | 3,500,000.00 |
| 18 | Completion of the remaining work on the Devamitta Sunday School building | 7 | 150 | 2,000,000.00 |
638 - Bogamuwa
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Development of the road from Malkona Junction to Ambalama | 1 | 200 | 200,000,000.00 |
| 2 | Development of the road through the village from near Mr. Upali's house | 2 | 250 | 2,000,000.00 |
| 3 | All roads development in Waligurugolla Auction Estate | 3 | 200 | 300,000.00 |
| 4 | Development of the Bogamuwa Watta road from Ambalama | 4 | 150 | 400,000.00 |
| 5 | Construction of a service tower for the domain | 5 | 300 | 2,000,000.00 |
| 6 | The road from near Mr. Saman's house to Mr. Kamalsiri's house was developed. | 6 | 150 | 2,000,000.00 |
| 7 | Renovation of the Ambagahamula Anvil | 7 | 300 | 2,000,000.00 |
| 8 | Increasing electricity capacity in the Bogamuwa area | 8 | 360 | 10,000,000.00 |
| 9 | Obtaining water from Galkumburawara Tank to the Bogamuwa section from Vanen | 9 | 150 | 3,000,000.00 |
| 10 | Renovation of the kiln at Narangaha Mula Field in Irudigala Liyada | 10 | 200 | 300,000.00 |
| 11 | Obtaining electricity for the Halpankotuwa Funeral Aid Society Hall | 11 | 200 | 4,000,000.00 |
| 12 | Kandegoda plantation creation | 12 | 150 | 1,500,000.00 |
| 13 | Providing self-employment opportunities | 13 | 150 | 1,500,000.00 |
| 14 | Renovation of the pipeline near Mr. Sarath's shop | 14 | 150 | 1,000,000.00 |
| 15 | Development of the Bogamuwa Dam System | 15 | 150 | 1,500,000.00 |
| 16 | Development of the dam from Kurakapitiya to Aswesduma | 16 | 100 | 2,000,000.00 |
| 17 | Providing egg laying hens for poultry farming | 17 | 50 | 150,000.00 |
| 18 | Take steps to improve dairy cow management | 18 | 50 | 2,000,000.00 |
| 19 | Development of the agricultural road running near Mr. Tharaka's house | 19 | 150 | 2,000,000.00 |
639 - Kurakeppitiya
| Index Number | Project Name | Priority number | Number of beneficiaries | Gross estimated amount Rs. |
| 1 | Development of the lower Eriyagahamula anvil | 1 | 150 | 2,000,000.00 |
| 2 | Concreting of the road near the house of Mr. R.D. Thattanayake, Batagolla | 2 | 150 | 1,500,000.00 |
| 3 | Development of the Wanasgalla Ussana Water Scheme | 3 | 150 | 2,000,000.00 |
| 4 | Development of necessary places on the Kurakappitiya Batagolla road | 4 | 150 | 1,000,000.00 |
| 5 | Implementation of the drinking water scheme from Deniya to Kurakappitiya | 5 | 50 | 1,500,000.00 |
| 6 | Development of the private road section from Malkona Junction to Deniya | 6 | 75 | 1,500,000.00 |
| 7 | Development of Veerabharan Road from near Mr. Kumarasinghe's house to Mrs. Subhashini's house | 7 | 75 | 1,000,000.00 |
| 8 | Development of the agricultural road from the main road to the cemetery | 8 | 50 | 1,500,000.00 |
| 9 | Construction of the upper floor of the Kurakappitiya Temple | 9 | 250 | 2,000,000.00 |
| 10 | Providing self-employment equipment along with training | 10 | 20 | 500,000.00 |
| 11 | Providing electricity and toilet facilities to the funeral society | 11 | 150 | 1,500,000.00 |
| 12 | Surveying and developing the road leading to the Veerabharan Cemetery | 12 | 150 | 1,500,000.00 |
| 13 | Construction of a tank by acquiring land in Batagolla village | 13 | 100 | 2,000,000.00 |
| 14 | Conducting and developing all road surveying activities belonging to the Pradeshiya Sabha | 14 | 400 | 1,500,000.00 |
| 15 | Renovation of the public well | 15 | 100 | 300,000.00 |
| 16 | Creating a dairy farming village | 16 | 20 | 1,000,000.00 |
| 17 | Implementing a program to provide deeds to LRC landowners | 17 | 30 | 0.00 |
| 18 | Construction of a public playground in a suitable location | 18 | 150 | 1,000,000.00 |